GO2-84-000, Confirms 831209 Telcon Re GE Coupled Piping & RHR HX Analysis Results.Analysis Indicated Increase in Up Loads. Original Washer Plate Design Adequate.Rhr Addendum to Design Reverification Program, Encl
| ML17277B243 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/06/1984 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17277B244 | List: |
| References | |
| GO2-84-0005, GO2-84-5, NUDOCS 8401160069 | |
| Download: ML17277B243 (6) | |
Text
REGUlATORY L
RMAT'ION DISTRIBUTION SYS (RIDS)
ACCESSION.,'NBR:8401160069 OOC.DATE 84/01/06" NOTARIZED:
NO FACIL:50.397 HPPSS Nuclear ProJecti Unit 2i Nashington Public Powe AUTH BYNAME AUTHOR AFFILIATION SORENSENpG.C.
Hashington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION SCHNENCERrA ~
Licensing Branch 2
SUBJECTS Confirms 831?09 telcon re Ge coupled piping L RHR HX analysis -results,Analysis,indicated increase in up loads Original washer. plage design adeauat'e.RHR addendum to "Oes4n Reverification Programs" encl'ISTRIBUTION (OOE:
8001S COPIES RECEIVED:LTR
-'NCL" SIZE:
g TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8 Related Correspondence NOTES:
DOCKET" 0 05000397~
RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB?. lA INTERNAL; ELO/HDS2 IE/OEPER/EPB 36 IE/DEQA/QAB 21 NRR/DE/CEB ii NRR/DE/EQB 13 NRR/OE/MEB 18 NRR/OE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/OSI/PSB 19 NRR/DS I/RSB 23 RGN5 EXTERNAL; ACRS
=
41 OMB/DSS (AMDTS)
LPDR 03 NSIC '5 COPIES LTTR ENCI 1
0 1
0 1
0 3
'3 1
1 1
1 2
2 1
1 1
1 1
-1 1
1 1
1 1
1 1
1 1
1 1
1 3
3 6
6 1
1 1
'1 1
1 RECIPIENTS ID CODE/NAME.'RR LB2 BC AULUCKiR~
01 IE FILE
.IE/DEPER/IRB 35 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/DE/SGEB 25 NRR/OHFS/LQB 32 NRR/DL/SSPB NRR/OSI/ASB NRR/DSI/CSB 09 NRR/DSI/METB 12 22 EG FILE 04 RM MI/MI8 BNL(AMDTS ONLY)
FEMA REP DIV 39 NRC PDR 02 NTIS COPIES I.TTR ENCL~
1 0
1
-1 1
1 1.
1 1
0 1
1 2
2
'1 1
=1 1
1 0
1 1
1 1
1 1
1 1
1 0
1 1
1 1
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED).LTTR 53 ENCl 46
C' ll<<
ih i
~
li
~
fl >>
W Q<<
C
,l ~ I<<
I>>
e i' Jif lf gati,CC II I $
M Q f I i MC<<ihl lh I
e <<'I 'f>>>>
Il Mll f
'f
" pt'9<< if I
I, li I i'fllf M <>
II Ih
/Ch 4>>
f> f AI>V'b f
fr<<
i f<<'bI C
I M
- Ms<<-
=
Mee>>M
~
>> M) i) 'lb
(>>b iJ,'1'lid
>> ~
,jib W
~ I 6bI
,,4 Ie>> ~i f ~i'<<
M I iI, I
Jib J
1 M.
>>I lh ti',h' J
k Ih Mil X JL I I ]l, bh
<<'h<<<< '.l I
Ldb>>
I bh i" Lv Ib I>>
IIM b>>III fr (Cb'>>e
<<C C>>3>>
bh g C" C I
>> j<<<< il>>
f C i, II b>>>>l C l h il I>> i I k h I<<
n gP C,C,I'C>>'Ik Qi MCW,l'II "
C Il E.'I ~ I 'bl
$ II j>>
I II'>>
'!bi Ci Ihc C>> 'ii hhr I'
C Ei 1
I II u X $
III>>MI I, lh ll I' g
<<1+
'bl l
ih'r M
ll<<
II bb I
<<h P pl M
Ml ii c all>>
l r
<<M>>ii r
h
',, i f,, f
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 6,
1984 G02-84-0005 8401160069 840l06 PDR ADOCK 05000397 P
PDR Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.
S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Schwencer:
Subject:
References:
NUCLEAR PROJECT NO.
2 WNP-2 DESIGN REVERIFICATION PROGRAM RHR ADDENDUM a)
Letter from G.
C. Sorensen to H.
R. Denton, "WNP-2 Design Reverification Program,"
dated September 27, 1983 b)
G02-83-1125, G.
C. Sorensen to A. Schwencer, "WNP-2 Design Reverification Program,
Response
to Staff guestions,"
dated December 7,
1983 Reference a) transmitted the WNP-2 Design Reverification Program Final Assessment Report to the NRC for review.
That report indicated two areas of review were not complete and would be provided in a later addendum.
Enclosed are copies of the addendum which completes the Supply System design reverification activities.
Reference b) provided responses to several staff questions that were addressed at a meeting between the NRC staff and Supply System personnel held in Bethesda, Maryland, Tuesday, November 28, 1983.
At the time Reference b) was prepared, the response to MEB guestion 3 (PFR-RHR-25 corrective action status) indicated the results of the General Electric coupled piping and RHR heat exchanger analysis were preliminary.
The final'results of the analysis were obtained on December 8, 1983, and conveyed to R. Li of the NRC staff during a telephone conversation on yd l
\\
J e
Mr. A. Schwencer Docket No. 50-397 WNP-2 DESIGN REVERIFICATION PROGRAM RHR ADDENDUM Page 2
January 6,
1984 G02-84-0005 December 9, 1983.
This letter confirms that telephone conversation during which we stated the coupled analysis was final and showed
~
the maximum up load was within the modified washer plate design.
Fur-ther evaluation of this item, conducted as Potentially Reportable Condition No..259, has shown that although the coupled analysis did increase the up loads, the original washer plate design was adequate.
If questions'rise regarding the WNP-2 Design Reverification Program, you may contact G.
D.
Bouchey (5Q9) 372-8473.
Very truly yours, G.
C. Sorensen (Mail Drop 340)
- Manager, Regulatory Programs GCS/DLW/cd"
Attachment:
as stated cc:
W.
A.
J.
N.
J.
T.
R.
J.
G.
Conn - BRI, RO wo/att I. Cygelman - BRI, Site (981A) wo/att A. Forrest - BRI, RO wo/att S.
Reynolds - DSL wo/att J.
Verderber - BRI, NY wo/att M. Novak -
NRC Auluck -
NRC B.
Mar tin -
NRC
I V