Forwards Rev 2 to Electrical Separation Practices. FSAR Section 8.3.1.4 Will Be Revised to Incorporate Matl
ML17277A559
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/11/1983
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17277A560 List:
References
GO2-83-326, NUDOCS 8304260301
Download: ML17277A559 (4)


Text

REGULATORY,~ORMATION DISTRIBUTION ST~M (RIOS)

I AGCESQI Ot7 NBR; 8304260301 OOC ~ O'ATE e 83/04/11 NOTARIZED; NO DOCKET FACIAL:50-397 WPPSS Nuclear Projecti Unit 2i Washington!Publ ic Powe 05000397

'tjSH'NNAME AUTHOR 'FFILIATION BOUCHEYEG,OS Washington, Public !Power 'Supply 'System RECIP ~ NAME RECIPIENT AFFILIATION SCHWENCERgA, L"icens)ng Branch '2

SUBJECT:

Forwards Rev 2 to ",Electrical Separation !Practices,," FSAR Section .8;F 1,4 will be rev{sed "to incorporate matl.,

DISTRIBUTION CODE: S001'$

TITLE: Licensing 'Submi,ital:

iCOf'IES 'RECEIYED:LTR <<ENCL ~~ SIZE:

.PSAR/FSAR Amdts 8, Rel ated .Cor respondence lj +7 NOTESR COPIES RECIPIENT COPIES

'ECIPIENT ID CODE/NAME LTTR ENCL IO CODE/NAME LTTR ENCL NRR/DL/ADL 1 0 NRR LB2 BC 1 0 NRR LB2 LA 1 0 AULUCKgRs 01 1= 1 INTERNAL: ELD/HDS2 1 0 IE FILE 1 1 IE/DEPER/EPB 36 3 3 IK/DEPER/IRB 135 1 IE/OEQA/QAB 21 1 NRR/DE/AEAB 1 0 NRR/OE/CEB 11 1 NRR/DE/EHEB 1 1 NRR/OE/EQB 13 2 2 NRR/DE/GB 28 '2 2 NRR/OE/HGEB 1 NRR/OE/MEB 18 1 1 17 30'RR/OE/MTEB 1 1 NRR/OK/SAB 24 1 1 NRR/DE/SGEB 25 2 2 NRR/OHFS/HFEB40 1 1 NRR/OHFS/LQB 32 i NRR/OL/SSPB 1 0 NRR/OS I/AEB 26 i NRR/DS I/ASB i 1 NRR/OSI/CPB 10 1 NRR/DS I/CSB 09 1 1 NRR/DSI/ICSB 16 1 NRR/OS I/METB 12 i NRA/OS I/PSB 19 i /RAB 22 i NRA/OSI/RSB 23 -i 1 REG FIL 04 i RGA5 3 3 AMI/MI8 0 EXT'ERNAL~ ACRS 41 6 BNL(AMDTS ONLY) 1 DMS/OSS "

(AMOTSj i 1 FEMA REP DIN <<39 i- i L'PbR 03 i NRC- PDR .i os 02'TIS NSXC 1

>TOTAL NUMBER OF COPIES REQUIRED s LTTR 54 ENCL 47

lt

)I Ii It ~

II ~ it f i 'r.'i I pv 0

~ l h

'I j

7kt I

\

~

~ )47) y,',4f ),-I wyf fi ','i t ~ ' lit,'I'

'I tj,l',4 ilk i hl ll( t II ki )4>>

')

7ll

~ .i hrl 4 IV j

I I

~

gi',rj4,) I f '

'll

)7 ht t'll jjl i)

I 1j4

'i I

f i

)f I kg, I'v)0 I, ft

~

44)

')7l j7 )

-Q I'l, l I r$ I u 4 ettmuu~ wmcew, ,I r'lif f4,'f r'l rt i,'t II I'r>>>ktkir 7 J I r)g) jfr> )

74 1 g I'I', I 4 '47IP,.)I I')'ti I ll j h j7 l,l Ii I

Ii

~ I r) 0 'I'I 4 I I tq j)lt, )

I'lj I

rt

)I

)I '

,r li ltv I'I I

Ij It I Qht,'4

)'I I

4) h,J),ty 1%

It tt lp J( Jl, f

l)I (ht 71 )4 r 74 l I'I,I I)4gf )I J l I)l, K if II I )),)4

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 April ll, 1983 G02-83-326 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Comission Washington, D.C. 20555

Dear Mr. Schwencer:

Subject:

NUCLEAR PROJECT NO. 2 ELECTRICAL SEPARATION The purpose of this letter is to transmit Revision 2 of the WNP-2 Electrical Separation Practices document to you. Per discussions with your Mr. R. Auluck, FSAR Section 8.3.1.4 will be revised shortly to incorporate the changes reflected in Revision 2 of that document.

Currently, Revision 1 of the Electrical Separation Practices document and the FSAR are compatible.

The changes in Revision 2 are at a very detailed level and believed, in our, opinion, to not be changes in what is generally defined as "criteria".

Very truly yours,

+ G. D. Bouchey Manager, Nuclear Safety and Regulatory Programs DCT/jw Attachment cc: Mr. R. Auluck - NRC Mr. W. S. Chin - BPA - 399 Mr. R. Feil - NRC - Site 917/

Mr. J. Elin - NRC Region V w/a yl i tP 8304ii 830426030i 05000397 PDR ADOCK A PDR

~ ~