GO2-83-326, Forwards Rev 2 to Electrical Separation Practices. FSAR Section 8.3.1.4 Will Be Revised to Incorporate Matl
| ML17277A559 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 04/11/1983 |
| From: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17277A560 | List: |
| References | |
| GO2-83-326, NUDOCS 8304260301 | |
| Download: ML17277A559 (4) | |
Text
DOCKET 05000397 NOTESR REGULATORY,~ORMATION DISTRIBUTION ST~M (RIOS)
I AGCESQI Ot7 NBR; 8304260301 OOC ~ O'ATE e 83/04/11 NOTARIZED; NO FACIAL:50-397 WPPSS Nuclear Projecti Unit 2i Washington!Publ ic Powe
'tjSH'NNAME AUTHOR 'FFILIATION BOUCHEYEG,OS Washington, Public !Power 'Supply 'System RECIP ~ NAME RECIPIENT AFFILIATION SCHWENCERgA, L"icens)ng Branch '2
SUBJECT:
Forwards Rev 2 to ",Electrical Separation !Practices,,"
FSAR Section.8;F 1,4 will be rev{sed "to incorporate matl.,
DISTRIBUTION CODE:
S001'$
iCOf'IES 'RECEIYED:LTR
<<ENCL ~~ SIZE: lj +7 TITLE: Licensing 'Submi,ital:.PSAR/FSAR Amdts 8, Rel ated.Cor respondence
'ECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB2 LA INTERNAL: ELD/HDS2 IE/DEPER/EPB 36 IE/OEQA/QAB 21 NRR/OE/CEB 11 NRR/OE/EQB 13 NRR/OE/HGEB 30'RR/OE/MTEB17 NRR/DE/SGEB 25 NRR/OHFS/LQB 32 NRR/OS I/AEB 26 NRR/OSI/CPB 10 NRR/DSI/ICSB 16 NRA/OS I/PSB 19 NRA/OSI/RSB 23 RGA5 EXT'ERNAL~
ACRS 41 DMS/OSS (AMOTSj L'PbR 03 NSXC os COPIES LTTR ENCL 1
0 1
0 1
0 3
3 1
1 2
2 1
1 1
2 2
ii 1
1 i-i 1
3 3
6 i
1 i
1 RECIPIENT IO CODE/NAME NRR LB2 BC AULUCKgRs 01 IE FILE IK/DEPER/IRB 135 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/OE/MEB 18 NRR/OK/SAB 24 NRR/OHFS/HFEB40 NRR/OL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/OS I/METB 12
/RAB 22 REG FIL 04 AMI/MI8 BNL(AMDTS ONLY)
FEMA REP DIN <<39 NRC-PDR 02'TIS COPIES LTTR ENCL 1
0 1=
1 1
1 1
1 0
1 1
'2 2
1 1
1 1
1 1
1 0
i 1
1 1
i ii 0
1 i-i.i
>TOTAL NUMBER OF COPIES REQUIRED s LTTR 54 ENCL 47
lt
)I II
~ it I
f i 'r.'i
~
)47) y,',4f
),-I pv 0
wyf tj,l',4 7kt
~ l h
'I ilk i hl ll(
fi ','i t 7ll It
~
~
~
.i hrl 4
Ii
~
I t II IV
')
j
\\j lit,'I'
'I ki )4>>
I I gi',rj4,) I
)7 ht t'll I 'i f i
I kg,
~ f
' 'll jjl i) 1j4 I )f I'v)0 ft
')7l -Q I'l, l I, ~
- 44) j 7
)
I r$
I u 4 ettmuu~
- wmcew, I'r>>>ktkir,I i,'t 7
J I r)g) jfr>
)
74 r'l r'lif rt 1 g I'I',
II I')'ti I
4
'47IP,.)I f4,'f I
ll j h j7 l,l
~
I r)
Ii 0 'I'I I
Ii I
tq j)lt,
)
4 I
I Ij It rt
)I
)I '
I I
,r I'I I'lj li ltv Qht,'4
)'I I
4) lp It f
l)I h,J),ty tt J(
Jl, 1%
K (ht 71
)4 r
74 J
l if II l
I)l, I )),)4 I'I,I I)4gf )I
Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 April ll, 1983 G02-83-326 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Comission Washington, D.C.
20555
Dear Mr. Schwencer:
Subject:
NUCLEAR PROJECT NO.
2 ELECTRICAL SEPARATION The purpose of this letter is to transmit Revision 2 of the WNP-2 Electrical Separation Practices document to you.
Per discussions with your Mr. R. Auluck, FSAR Section 8.3.1.4 will be revised shortly to incorporate the changes reflected in Revision 2 of that document.
Currently, Revision 1 of the Electrical Separation Practices document and the FSAR are compatible.
The changes in Revision 2 are at a very detailed level and believed, in our, opinion, to not be changes in what is generally defined as "criteria".
Very truly yours,
+ G.
D. Bouchey
- Manager, Nuclear Safety and Regulatory Programs DCT/jw Attachment cc:
Mr. R. Auluck -
NRC Mr. W. S.
Chin - BPA - 399 Mr. R. Feil -
NRC - Site 917/
Mr. J. Elin -
NRC Region V w/a yl i tP 830426030i 8304ii PDR ADOCK 05000397 A
~~
C I
I