GO2-83-071, Forwards Final Suppl to 800801 Engineering Evaluation of Sacrificial Shield Wall, Closing All Previous Items & Providing Discussion of Work Performed to Complete Previously Outlined Programs in Aug 1980 Rept

From kanterella
(Redirected from ML17277A453)
Jump to navigation Jump to search
Forwards Final Suppl to 800801 Engineering Evaluation of Sacrificial Shield Wall, Closing All Previous Items & Providing Discussion of Work Performed to Complete Previously Outlined Programs in Aug 1980 Rept
ML17277A453
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/26/1983
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17277A454 List:
References
GO2-83-071, GO2-83-71, NUDOCS 8302230374
Download: ML17277A453 (6)


Text

REGULATORY IN MATION DISTRIBUTION SYSTE (RIDS)

.E AGGRESSION NBR:8302230374 DOC ~ DATE: 83/01/26 NOTARIZED:

NO DOCKET ¹ FACIL:50"397 NPPSS Nuclear Pr ojecti Unit 2i Yashington,Public Powe 05000397 AUTH,NAME AUTHOR AFFILIATION BOUCHEYg GD ~

'Washington Pub l i c Power Supp 1 y System REC IP ~ NAME RECIPIENT AFFILIATION SCH'KENCERiA ~

Licensing Branch 2

SUBJECT:

,.Forwards final. suppl to 800801 "Engineering Evaluation of Sacrificial Shield calli," closing all previous items 8

providing discussion of work,performed ~to complete previously outlined programs in Aug 1980 rept.

DISTRIBUTION CODE:

80018 COPIES RECEIVED:LTR ENCL SIZE L:, +4 TITLE: 'Licensing 'Submittal:

PSAR/FSAR Amdts L Related Correspondence NOTES:

REC IP IENT ID CODE/NAME NRR/DL/ADL NRR L82 LA INTERNAL: ELD/HDS2 IE/DEP EPDS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DL/SSPB NRR/DSI/ASB NRR/DSI/CSB 09 NRR/DS I/METB 12

/

AB 22 LE 04 RM/DDAM /

8 EXTERNALS ACRS 41 DMB/DSS (AMDTS)

LPDR 03 NSIC 05 COPIES LTTR ENCL 0

1 0

1 0

1 1

1 "0

2 2

1 1

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 1

0 6

6 1

1 1

1 1

1 RECIPIENT ID CODE/NAME NRR LB2 BC AULUCKeRr 01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DS I/AEB 26 NRR/DS I/CPS 10 NRR/DS I/ICSB 16 NRR/DSI/PS 8 19 NRR/DSI/RSB 23 RGN5 BNL(AMDTS ONLY)

FEMA REP DIV 39 NRC.PDR 02 NTIS COPIES LT'TR ENCL 1

0 1

1 1

1 3

3 1

1 2

2 1

1 1

1 1

1 1

1

~

1 1

1 1

1 1

1 1

1 1

"3 3

1 1

1 1

1 1

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 52 ENCL 45

4 0

rf f

lfrfl'I tl

((

ff ll ill I'

'll I

)I ff I, f, I

'"Ill, 'I,II'I l(r,r gg I

Ir PQ CQ Irr('i

'I 3)>I 9 ff if(,'llg I Iy(l 1

I 'I. I fi'If'

>1 fr f> I(r fg I

ff A

f 'f'l

]f kr, rl I I

g g f>I>>

rlr I

r I

I fr I (

, ( r I 'g II Ir rlf fi'I;( 3,'

lr

)f 4

'J 1

I I' Il Ig ting ji,

'i I

rr t>

li JI I

I li'i 3

Ir

)

'fr> )I I

IJ I '4 III II I

I I

r I I

f li (3

(

I jl, J3 Ji ji rfi il f,

I I

I rf I 'I I

('

ri rhl Jf Ji, If

'h

)f IJQ Ir Ir 1[

h lr II (rr f'I g

tl',r'f,f,',

', P ft I

Il I

jar Il rr

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 January 26, 1983 G02-83-071 Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing U.S., Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D.C.

20555

Subject:

NUCLEAR PROJECT 2

ENGINEERING EVALUATION OF THE WNP-2 SACRIFICIAL SHIELD WALL SUPPLEMENT NO.

3 - FINAL REPORT Refer ences:

(a)

G02-80-167, DL Renberger (Supply System) to BJ Youngblood (NRC), "Engineering Evaluation of the Sacrificial Shield Wall", dated August 1, 1980 (b)

G02-80-182, DL Renberger (Supply System) to BJ Youngblood (NRC), "Engineering Evaluation of the Sacrificial Shield Wall", dated August 19, 1980 (c)

G02-81-556, RG Matlock (Supply System) to RH Engelken (NRC), "Engineering Evaluation of the WNP-2 Sacrificial Shield Wall Supplement No. 2",

dated December 29, 1981 Reference (a) transmitted to the Licensing Branch a report entitled "Engineering Evaluation of the WNP-2 Sacrificial Shield Wall".

Reference (b) transmitted Supplement No.

1 to the subject report, addressing the Office of Inspection and Enforcement

( I.E.) concerns and questions on the overall evaluation of the sacrificial shield wall.

Reference (c) transmitted Supplement No.

2 to the subject report to the I.E., providing information regarding deviations from the original girth weld plan, a discussion of deficiencies identified during preparation of the girth weld joint, and revised tables.

The purpose of this letter is to transmit Supplement No.

3 which closes all previous items and provides a discussion of work performed to complete the programs previously outlined in the original report.

Qcn(

Additional deficiencies that have been identified and repaired since submittal of Reference (a) do not fall outside the bounding assumptions made in the original SSW evaluation, nor do they invalidate the conclu-sions, with respect to the integrity of the

SSW, made in that original evaluation.

8302230374 830i26 PDR ADQCK 05000397 A

PDR

r'

Hr. A. Schwencer Page 2

January 26, 1983 G02-83-071 This is the final supplement to the original evaluation and completes all related commitments previously identified to the NRC.

Any future nonconforming conditions pertaining to the sacrificial shield wall will be dispositioned using normal project procedures and will be available for review by the NRC Resident Inspector as necessary.

G; D. Bouchey, tucana r (370)

Nuclear Safety and Licensing GDB/TI1E/sms Attachment cc:

l1S Chin, BPA (399)

AI Cygelman, B&R (954M)

RA Feil, NRC Site ND Lewis, EFSEC-Olympia TA t1angelsdorf, Bechtel (982)

JC Plunkett, NUS JE Richardson, B&R Site RE Snaith, B&R NY V Stello, NRC AD Toth, NRC