ML17276B372

From kanterella
Jump to navigation Jump to search
Forwards Review of Summary of Conformance to NRC Regulations of 10CFR20,50 & 100.
ML17276B372
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/26/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17276B373 List:
References
GO2-82-344, NUDOCS 8204060148
Download: ML17276B372 (6)


Text

REGULATORY FORMATION DISTRIBUTION SY M (RIDS)

< Vj AGCESSION NBR;8204060148 DOCS DATE: 8?/03/26 NOTARI'ZEO: NO DOCKET FACIL:50-397 NPPSS Nuclear Projects Unit 2E Washington )Public Powe 0'5000397 AUTH'AME AUTHOR AFFILIATION BOUCHEY<G.D, Washington Public Power Supply =System REC IP ~ NAME RECIPIENT AFFILIATION SCHKENCEREA ~ Licensing Branch 2

SUBJECT:

Forwards review of "Summary of Conformance to NRC Regulations of 10CFR20E50 8 100,"

DIS'TRISUTION CODE: S001S iCOPIES RECEIVED:LTR TITLE: PSAR/FSAR AMOTS and Related Correspondence ENCL J SIZ E: R fj fD NOTES:2 copies all matl:PM. 05000397 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAM1E LTTR ENCL A/D LICENSNG 1 0 LIC BR 02 BC 1 0 LIC BR P2 LA 1 .0 AULUCKE R ~ 0 1 1 1 INTERVAL: ELD 1 0 IE 06 1 1 IE/DEP/EPOB 35 1 1 IE/DEP/EPLB 36 3 "3 MPA 1 0 NRR/OE/CEB 11 1 1 NRR/DE/EQB 13 3 3 NRR/DE/GB ?8 2 2 NRR/DE/HGEB 30 2 '2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 1 NRR/DSI/AEB 26 1 1 NRR/DSI/ASB 27 1 1 NRR/DS I/CPB 10 1 1 NRR/DS I/CSB 09 1 1 NRR/DS I/ETS8 12 1 1 NRR/DSI/I:CSB 16 1 1 NRR/DSI/PSB 19 1 1 NRR/DSI/RAB 22 1 1 NRR/DSI/RS8 25 1 1 NRR/DST/LGB 33 1 1 04 1 1 RGN5 2 2 EXTERNAL+ ACRS 41 16 16 BNL(AMDTS ONLY) 1 1 FEMA REP DIV 39 1 1 LPOR 03 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL

1 4 ~ W l

, 1 K

I

\ I ll K j

ll

/I

'I j m W

II T

t

\

t4

8204060i43 820326 PDR ADOCK 05000397 A PDR Washington Public Power Supply System P.O. Box 968 3000George Washington Way Richland, Washington 99352 (509) 372-5000 March 26, 1982 G02-82-344 Bi~ggi~Q Qf 4PR 05 1982'~

ittttjIre~

@+RE NQ~ g Docket No. 50-397 'lion Mr. A. Schwencer Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Schwencer:

Subject:

WNP-2

SUMMARY

OF CONFORMANCE TO NUCLEAR REGULATORY COMMISSION REGULATIONS 10CFR PARTS 20, 50 and 100

Reference:

(1) Letter, A. Schwencer to R. L. Ferguson, dated March 19, 1982 (2) NRC Internal memo from McCorkle to Schwencer, dated November 6, 1981 The Washington Public Power Supply System has conducted a review of the conformance of WNP-2 design to NRC Regulations of Safety Significance as requested by the NRC (Ref. 1). The review is documented in the enclosed report.

In addition to the information provided in this enclosure, conformance

~

to 10CFR50, Appendix A, General Design Criteria for Nuclear Power Plants, is discussed in Chapter 3, Section 3. 1.2 of the Final Safety Analysis Report (fSAR). Appendix C to the FSAR contains information on the Supply System's conformance assessment of WNP-2 to USNRC Regulatory Guides, Division 1. furthermore, the methods by which the applicable requirements of 10CFR73 r elate to physical security have been discussed previously in reports submitted to the NRC and withheld from public disclosure under the provisions of 10CFR2.790. The physical security plan and safeguard contingency plan have been accepted and approved by the NRC (Ref. 2).

l S

s

\

1 C

A Pl q N y 'tl V ti l

I'J t

Iir. A. Schwencer Page Two Harch 26, 1982 NRC Regulation 10CFR Parts 20, 50, and 100 If you have any questions on the enclosure or the other noted documents, please direct them to this office.

Very truly yours, WV> k~Agg G. D. Bouchey, Deputy Director Safety and Security RGJ: jr 0 copies cc: R Auluck - NRC WS Chin - BPA - 399 R Feil - NRC 917/

i)S Reynolds - D8L

kt k

k k