GO2-82-344, Forwards Review of Summary of Conformance to NRC Regulations of 10CFR20,50 & 100
| ML17276B372 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/26/1982 |
| From: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17276B373 | List: |
| References | |
| GO2-82-344, NUDOCS 8204060148 | |
| Download: ML17276B372 (6) | |
Text
REGULATORY FORMATION DISTRIBUTION SY M (RIDS)
< Vj AGCESSION NBR;8204060148 DOCS DATE: 8?/03/26 NOTARI'ZEO:
NO FACIL:50-397 NPPSS Nuclear Projects Unit 2E Washington )Public Powe AUTH'AME AUTHOR AFFILIATION BOUCHEY<G.D, Washington Public Power Supply =System REC IP ~ NAME RECIPIENT AFFILIATION SCHKENCEREA ~
Licensing Branch 2
DOCKET 0'5000397
SUBJECT:
Forwards review of "Summary of Conformance to NRC Regulations of 10CFR20E50 8 100,"
DIS'TRISUTION CODE:
S001S iCOPIES RECEIVED:LTR ENCL J SIZ E: R fjfD TITLE: PSAR/FSAR AMOTS and Related Correspondence NOTES:2 copies all matl:PM.
05000397 RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR P2 LA INTERVAL: ELD IE/DEP/EPOB 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DSI/AEB 26 NRR/DS I/CPB 10 NRR/DS I/ETS8 12 NRR/DSI/PSB 19 NRR/DSI/RS8 25 04 COPIES LTTR ENCL 1
0 1
.0 1
0 1
1 1
0 3
3 2
'2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAM1E LIC BR 02 BC AULUCKE R ~
0 1 IE 06 IE/DEP/EPLB 36 NRR/OE/CEB 11 NRR/DE/GB
?8 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DSI/ASB 27 NRR/DS I/CSB 09 NRR/DSI/I:CSB 16 NRR/DSI/RAB 22 NRR/DST/LGB 33 RGN5 COPIES LTTR ENCL 1
0 1
1 1
1 3
"3 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 2
2 EXTERNAL+ ACRS 41 FEMA REP DIV 39 NRC PDR 02 NTIS 16 16 BNL(AMDTS ONLY) 1 1
LPOR 03 1
1 NSIC 05 1
1 1
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
1 4
~ W l
1 K
I j
\\
I ll K
ll
/I
'I j
m W
II T
t
\\
t4
8204060i43 820326 PDR ADOCK 05000397 A
PDR Washington Public Power Supply System P.O. Box 968 3000George Washington Way Richland, Washington 99352 (509) 372-5000 March 26, 1982 G02-82-344 Docket No. 50-397 Mr. A. Schwencer Licensing Branch No.
2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 Bi~ggi~Q Qf 4PR 05 1982'~
ittttjIre~
@+RE NQ~ g
'lion
Dear Mr. Schwencer:
Subject:
WNP-2
SUMMARY
OF CONFORMANCE TO NUCLEAR REGULATORY COMMISSION REGULATIONS 10CFR PARTS 20, 50 and 100
Reference:
(1)
- Letter, A. Schwencer to R. L. Ferguson, dated March 19, 1982 (2)
NRC Internal memo from McCorkle to Schwencer, dated November 6, 1981 The Washington Public Power Supply System has conducted a review of the conformance of WNP-2 design to NRC Regulations of Safety Significance as requested by the NRC (Ref. 1).
The review is documented in the enclosed report.
In addition to the information provided in this enclosure, conformance
~
to 10CFR50, Appendix A, General Design Criteria for Nuclear Power
- Plants, is discussed in Chapter 3, Section
- 3. 1.2 of the Final Safety Analysis Report (fSAR).
Appendix C to the FSAR contains information on the Supply System's conformance assessment of WNP-2 to USNRC Regulatory Guides, Division 1.
furthermore, the methods by which the applicable requirements of 10CFR73 r elate to physical security have been discussed previously in reports submitted to the NRC and withheld from public disclosure under the provisions of 10CFR2.790.
The physical security plan and safeguard contingency plan have been accepted and approved by the NRC (Ref. 2).
l A
N y
'tl I'J S
s 1
C
\\
Pl q
V ti l
t
Iir. A. Schwencer Page Two Harch 26, 1982 NRC Regulation 10CFR Parts 20, 50, and 100 If you have any questions on the enclosure or the other noted documents, please direct them to this office.
Very truly yours, WV> k~Agg G.
D. Bouchey, Deputy Director Safety and Security RGJ:jr Enclosure 10 copies cc:
R Auluck NRC WS Chin
- BPA - 399 R
Feil NRC 917/
i)S Reynolds - D8L
kt k
k k