GO2-81-230, Forwards Revised Section 2.5.1 of FSAR to Be Incorporated Into Amend Upon Completion of Section 2.5.2,scheduled for 810930

From kanterella
(Redirected from ML17275B186)
Jump to navigation Jump to search
Forwards Revised Section 2.5.1 of FSAR to Be Incorporated Into Amend Upon Completion of Section 2.5.2,scheduled for 810930
ML17275B186
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/07/1981
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17275B187 List:
References
GO2-81-230, NUDOCS 8108200379
Download: ML17275B186 (4)


Text

REt ULAT INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:6108200379 DOC ~ DATE: 81/08/07 NOTARIZED:

NO DOCKET FAGILC50"397 llPPSS Nuclear Pro)acti Unit 2< Hashington Public Powe 05000397 A(1TH",NAME AUTHOR AFFILIATION BOUCHEY<G.D, Hashington Public Power Supply System RECIP ~ NAME'ECIPIENT AFFILIATION SCHHENCERgA ~

Liicensing Br anch 2

SUBJECT:

Forwards reVised Section 2'.5.1 of FSAR to be incorporated into amend upon completion of Section 2 ' 'rscheduled for 010930.

DISTRIBUTION CDDE'. 000lS COPIES RECEIVED:LTR I, ENCI.Igg SIZE' 6 g4P TITLEi: PSAR/FSAR AMDTS and Related Correspondence NOTES:PM:

2 copies of al l material.i cy.'Bk(R"LRG PM(L'RIB) 05000397 RECIPI ENT ID CODE/NAME~

ACTION:

A/D LICENSNG LIC BR P2 LA INTERNALi: ACCID EiVAL BR26'HEM ENG BR il CORE PERF 8R 10 EMRG PRP DEV 35 EQUIP QUAL BR13 GEOSCIENCES 2B HYD/GEO BR 30.

ILE>>

06 LIC QUAL BR 32'ECH ENG BR 1B NRC PDR 02'P LIC BR 34 PROC/TST REV 20 SS BR22'EG FI 01 BR25 COPIES LTTR ENCL" 1

0 1

0 1

1 1

1 1

1 1

1 3

3 2

2 2

2 3

3 1

1 1

1 1

1 1

1 1

1 1

1 1.

1 1

1 REC IP IENT ID CODE/NAME L'IC BR 02 BC AULUCKPR ~

04 AUX SYS BR 27 CONT SYS BR 09 EFF TR SYS BR12 EMRG PRP LIC 36 FEMA REP DIV 39 HUM FACT ENG 40 ILC SYS BR 16 LIIC" GUID BR 33 MATL ENG BR 17 MPA OELD POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT ANAL BR 24 COPIES LTTR" ENCL 1

0 1

1 1

1 1

1 1

1 3

3 1

1 1

1 1

1 1

1 1

1 1

0 1

0 1

1 1

~

1 1

1 1

EXTERNAL: ACRS NSIC 41 05>>

16 16 1

1 I.PDR iVTI S 03 1

1 1

1 AUC 2S >ggy (P

TOTAL NU4IBER OF COPIES REQUIRED:

LTTR 6

ENCL

~7

~

~

\\

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 Docket No. 50-397 Director, Nucl ear Reactor Regulation U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 August 7, 1981 G02-81-230 NS-L-02-CDT-81-03 Attention:

Subject:

Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing SUPPLY SYSTEM NUCLEAR PROJECT NO.

2 WNP-2 FSAR SECTION 2.5.1

Dear Mr. Schwencer:

Attached are sixty (60) copies of the rewrite of Section 2.5.1 of the WNP-2 FSAR.

Section 2.5.1 will be incorporated into an amendment after the rewrite of Section 2.5.2 has been completed.

Section 2.5.2 will be completed by September 30,

1981, per the schedule discussed during the,",

Supply System/NRC meeting June 26, 1981.

Very truly yours, GDB:CDT:nm Enclosures D.

BOUC

Director, uclear Safety cc:

W.S. Chin, BPA A.D. Toth, NRC-Resident Inspector R. Auluck, NRC N.S.

Reynolds, D

8 L

J. Plunkett, NUS Corporation O.K. Earle, BSR (RO) gas I 81pBQpps psppp397 9 8jpgp71

'DR gDOC~

PDR,i A

v

~ $

LI I

i II l,

il 'I r