GO2-80-182, Forwards Suppl 1 to Engineering Evaluation of WPPSS Unit 2 Sacrificial Shield Wall, in Response to Open Items Required for NRC Approval of Proposed Replacement Weld in Sacrificial Shield Wall.Affidavit Encl
| ML17275A540 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/19/1980 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17275A541 | List: |
| References | |
| GO2-80-182, NUDOCS 8008220213 | |
| Download: ML17275A540 (7) | |
Text
REGULATOR'FORMATION DISTRIBUTION TEM (RIDS)
'ACCESSION NBR:8008220213 DOC ~ DATE: 80/08/19 NOTARIZED! YES DOCKET FACIL:50-39'7 WPPSS Nuclear Pr oJectE Uni t 2i Washington Public Powe 05000397 AUTH ~ NAME AUTHOR AFFILIATION RENBERGERPD.L.'ashington Public Power Supply System incr) vi RECIP ~ NAME REC/PIENJ AFFILIATION YOUNGBLOODPB,J.
Licensing Branch 1
SUBJECT:
Forwards Suppl 1 to "Engineering Evaluation of WPPSS Unit 2
Sacraficial Sheild Welli" in response to open items requiped for NRC approval of, proposed replacement weld in sacraficial shield wali'ffadavit encl.
DISTRIBUTION CODE:
BOO IS COPIES RECEIVED:LTR i ENCL g
SIZE:
s g7 TITLE: PSAR/PSAR ANDTS and Related Cor respondence NOTES:PM:
2 comics of all mater ial ~
05000397
.RECIPIENT ID CODE/NAME ACTION:
A/D LICENSNG RUSHBROOKPM ~
- INTERNAL
- ACCID EVAL BR CHEM ENG BR CORE PERF BR 17 EFF TR SYS BR EQUIP QUAL BR HYD/GEO BR 11 IRE 06 MECH ENG BR NRC PDR 02 POWER SYS BR QA BR 10 REAC SYS BR SIT ANAL'R 27 COPIES LTTR ENCL 1
0 1
0 1
1 1
1 1
1 1
1 1
1 1
3 3
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME YOUNGBLOODEB LYNCHED'5 AUX SYS BR 18 CONT SYS BR DIRg SFTY TECH EMERG PREP 22 GEOSCIENCES ILC SYS BR 20 MATL ENG BR MPA OELD PROC/TST REV BR ESS BR12 REG F II E 01 S
NG BR COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 0
1 0
1 1
1 1
1 1
1 1
EXTERNAL: ACRS NSIC 0g 16 16 1
1 LPDR 03 1
1 AUG 2 g )g8P
/id TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
e 4t e>>
i 'r "kkk
"'6 f"
ri 4r
'4
~
e i
k ek 4
4 A
k
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 988 3000 GSO. WASHINGTON WAT RICHI.ANO. WASHINGTON 99352 PHONf (509) 375 5000 August 19, 1980 G02-80-182 Docket No. 50-397 Director, Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. B.J.
Youngblood, Chief Licensing Branch No.
1 Division of Licensing
Dear Mr. Youngblood:
Subject:
WPPSS Nuclear Project No.:2 Engineering Evaluation of the Sacrificial Shield Wall SSW
Reference:
WPPSS to NRC'letter, same subject, G02-80-167, August 1, 1980 1
J The reference transmitted to NRR a report on, the subject which in conjunction with the meeting held at your offices on Augu'st 6, 1980, was intended to form the basis for NRR approval of a proposed replacement weld.
In that meeting several items were identified which required a formal reply in order to close the issues associated with the SSW.
Specifically, o
Clarify the original intent of the dimensional tolerances associated with the fabrication of the
- SSW, o
Provide the as-built dimensional information associated with the out-of-roundness and verticality of the SSW adjacent to the 541'-5H elevation, o
Provide the design margin of the original plug weld design, o
Provide an assessment of the secondary stresses of the proposed partial penetration weld due to its eccentricity, o
Discuss the leachability of lead from the selected shield material and provide the results of the various qualification
- tests, and o
Provide the rationale for leaving known defects in the SSW.
8 0 0 > 2 2 0 2/ 5
Hr. B.J.
Youngblood Page 2
Each of the above items is discussed in the enclosure to this letter, a
supplement to the original report entitled "Engineering Evaluation of the WNP-2 Sacrificial Shield Mall", submitted with the reference.
The NRR concerns were discussed informally in your offices on August 15,
- 1980, with the responsible Structural Engineering Branch reviewer.
It is our understanding that these concerns are now resolved, and as such, the technical issues being reviewed by NRR on the subject weld may be closed.
Due to our schedule needs for release of the
- SSW, we respectfully request that you expedite processing a letter stating your concurrence with the proposed replacement weld.
A copy of this letter should also be transmitted to the Office of Inspection and Enforcement in order to prevent schedule delays.
Very truly yours, DLR:DCT:rmm D. L. Renberger Assistant Director Technology
Enclosure:
Supplement to Engineering Evaluation Report on Sacrificial Shield Wall (30) cc:
V. Stello, NRC RH Engelken,'RC ND Lewis,
- EFSEC, Olympia JR Lewis, BPA JJ Verderber, BSR - New York RC Root, B&R Site GT Harper, BSR - Site AD Toth, NRC, Region V
WNP-2 Files
STATE OF WASHINGTON)
)
ss COUNTY OF BENTON
)
D. L. RENBERGER, Being first duly sworn, deposes and says:
That he is the Assistant Director, Technology, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the fore-going on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.
DATED
, 1980 D. L.
RENBERGER On this day personally appeared before me D. L.
RENBERGER to me known to be the individual who executed the foregoing instrument and acknowledged
~
that he signed the same as his free act and deed for the uses and purpose's therein mentioned.
GIVEN under my hand and sea1 this
/5 day of
, 1980
~ 4"'sNK t
1(,.II t (
~
i 4
itt otary Pub ic i and for the tate of Washington Residing at
0 h
'I'g
~ P%
- V