Letter Dated June 13, 2016, from the Christopher Burke Engineering to Illinois Department of Natural Resources and the Lake County Stormwater Management Commission Regarding Zion Nuclear Station - Barge Transport of Stator/Rotor Temporary .
ML17255A009
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/13/2016
From: Olson D
Christopher B. Burke Engineering, Ltd
To:
Office of Nuclear Material Safety and Safeguards
References
SRPS-2H-103, ZS-2017-0108
Download: ML17255A009 (66)


Text

St< PS- J. H -103 ZS-:J.Dl/ - 010~

CHRISTOPHER B. BURKE ENGPNEERING, LTD.

95'15 West Higgins Road SL ite SOC Rosemont lllinc*s 60018 TEL (847) 823-(1500 FAX {847) 823*0~20 June 13, 2016 Lake County Stormwater lltinois Department of Natural Resources I

I Management Commission Office of Water Resources 500 W. Winchester Road, Suite 201 160 N. LaSalle Street, Suite S-703 Libertyville, IL 60048 Chicago, IL 60601 Attention: Scott Griffith, PE Jim Casey Regulatory Supervisor Lake Michigan Permits

Subject:

Zion Nuclear Station- Barge Transport of Stator/Rotor Temporary Construction Activities at Lake Michigan City of Zion, IL (CBBEL Project 110016.00018)

Dear Mr. Gnffith and Mr. Casey:

On behalf :>f ZionSolutions, LLC, Christopher 8. Burke Engineering, ltd. (CBBEL) is submitting a Watershed Development Permit and Joint Permit Application with additional supporting documents requesting authorization to construct a temporary access roadway and dock a barge at the Zion Nuclear Station to transport a Stator/Rotor to another power generating station for re-use. The project is located on the shoreline of Lake Michigan and at an adjacent existing staging area within the Zion Nuclear Station at the end of Shiloh Boulevard within the City of Zion. Lake County, IL The project consists of constructing a temporary access roadway and docking a barge on the 1

shore of Lake Michigan which will transport the Stator/Rotor. which does not allow for surface transport given the size and weight (>1,000,000 pounds). The temporary access roadway will be constructed with timber mats on crushed and compacted limestone and will extend from the existing gravel parking lot to an upland beach area. This area is above the Ordinary High Water Mark of Lake Michigan (OHVVM), which corresponds to an elevation of 581.5 ft.

NAV088 [580.5 ft. International Great Lakes Datum 1985 (IGLD 85)]. At the tenninus of the temporary access road, a gangway/bridge will be lowered into place from the barge to the terminus, spannjng the limits of the waters of the United States Ordinary High Water Mark (OHWM). Tre Stator/Rotor will then be rolled on to the barge using a high tech trailer system.

The barge is specialized and its buoyancy can be regulated using a water ballast system, which can level the barge or float one end or the other as necessary to aHow beaching and freeing from the shoreline. A tugboat will be used to position the barge and move it once the Stator/Rotor are secured on board. The attached Stormwater Permit Plan Set shows the work plan, information regarding soil erosion and sediment control measures for the project, construction sequencing and restoration .

According to the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM} for Lake County, IL and Incorporated Areas Panel 85 of 295, revised on September 18. 2013, a portion of the project area resides within regulatory Zone A floodplain associated with Lake Michigan (Exhibit 2). CBBEL completed a Base Flood Elevation (BFE}

study for the Zion Nuclear Station that has been previously approved by Lake County Stormwater Management Commission in 2011. The study utilized a floodplain elevation of 584.75 ft (NAVD88) [585.0 ft NGVD1929] for the beach area. The proposed project will require temoorary fill within the regulatory floodplain and beaching of a barge within Lake Michigan, which is a Public Waters of Illinois. While there will be no dredging or filling within the OHVVM, there will be approximately 20 cubic yards of temporary fill within the regulatory floodplain. The civil improvements within the regulatory floodplain are only temporary and the site area will restored to its previous condition upon completion of the project, which is expected to take only a one or two weeks. In our opinion, the small amount of temporary fill within the floodplain of Lake Michigan will not increase flood risk for adjacent properties and shourd be exempt from providing compensatory storage.

CBBEL completed a wetland and water assessment in supPort to obtain a Regional Permit 11 from the USACE, which was filed on May 26, 2016 under a separate cover. A copy of the USACE permit application and supporting documentation Is also enclosed with this letter.

Construction is scheduled to begin in August 2016. On behalf of ZionSolutions, we are requesting authorization to proceed with the proposed project. lf you have any questions, please do not hesitate to contact me.

Sincerely, Darren Olson, PE, CFM. D.WRE Senior Water Resources Pr~ect Manager

Enclosures:

Joint Permit Application Watershed Development Permit Application Stormwater Permit Plan Set Location Map FIRM USAGE Wetland Permit Information Cc: Darlene Murphy - ZionSolutio11s OTO N.\llONl.110016 :>CC18\llJate-r\Doc::s\L_Si'vtC_IONR_06f32016.docx

I I . I

5. NAME l ADDRESS OF PROPERTY OWNER 6. NAME & ADDRESS OF ENGINEER/AGENT 1. NAME & ADDRESS OF CERT. WETLAND SPECIALIST Darlene Murphy Darren T. Olson - CBBEL Jedd Anderson CBBEL M 101 Shiloh Blvd. 9575 W. Higgins Avenue, 9575 W. Higgins Avenue, Zion, IL 60099 Suite 600 Suite 600 Rosemont, IL 60018 Rosemont, IL 60018 Daytime Phone: (224) 789-4025 Daytime Pnnne: (847) 823-0500 Daytime Phone: (647) 823-0500 Fax: (847) 823--0520 Fax: (847) 823-0520 Fax: (224) 789-4008 Emai: ctfmurphy@energysolutlons.com Email: dolson@cbbel.com Email: Jedd@cbbel.com 813 8A. -

..- CHECK THE ONE CONDrTION THAT APPLIES:

Exempt. W&tenihed Development Permit Not Required (IV A2)

Minor Development (IV.A., IV.B.)

Major DeveloprnentOUlslde the Fklodplaln (lVA, IV.8., IV.0., IV.G.)

QfECK ALL CON0"10NS THAT APPLY:

Isolated Welland Impact (IV.E.)

Request Letter d No Walland Impact (LONI) (IV.E.)

Development In a Floodway (lV.C.3.)

Aoodplaln Map Revision or Amendment (IV.C2.g.; IV.C.3.d.(8))

~ "'" Waten:ourue wlDrahlge Area >20 Aaes and <100 Acres (IVA, IV.D.)

. Major Deve1opment ln5lde the Floodplain (IV.A., IV.B., IV.C., IV.D., IV.G.) _ Waten:ourae wJDramage Area >100 Acres and <640 N::res (IV.A., IV.D.)

-- Public Road Development(IVA, IV.F.)

Public Development in the Fklodplaln (Appendix E.J.2.)

Earth Chqe Approyal (ECA) (IVA4.b.)

Variance Request (V.)

BFE or Floodway Determination (IV.C.)

- EJCfslng Condlllons BFE Only (no dewlopment)

SoM Erosion and Sediment Control Review Only =./ Deslgnaled Erosion Control lnspectcr (DECI ReqlMred)

PrHpplk:allon Meeting Held D ~lf'J Dl&turbe 5000 sq. ft. or More 9A. STORMWATER DATA

SUMMARY

untt 98. WETLAND DATA

SUMMARY

Total Property Ownership = 92.73 Acres Ex!slinn Wetland AmlBnA " NIA Hydrologlo Disturbance = .06146 Ar:res Waler& of lhe U.S. = ~Midtgln Wa!enihed Area TributalY to Development = Acres lsolaled Watsn of Lake Coonrv = NIA Proposed Impervious Area = Acres lmDaCled Wetland Ar.maoe NIA Exlstl~ Impervious /wa Pr&-1992 = Atres Wetel&Oflha U.S. = NIA Existing Impervious Area Post-1992 Aaes ,_

Delenllon Volume Requll8d ..

Aae-ft.

Isolated Waters of Lake County Mllinalfcn RMIAMrnent Ratio

" NIA

= NIA Compensatory Storage Required  : Acre-ft. Ultlnation AtmMe RMLllnld = NIA Deptesslonal = ~ft. Wa1811 of the U.S. = NIA Riverine O-to 1(}.Year  ;;

Aa&-ft. Isolated Waters of Leka Comlv = NIA Riverine 10- lo 100-Year = Acre-l.. On.Site Off.Site ..- NIA NIA Mitlni:ilfon Bank '"' NIA SMC We11and Restoration Fund "" NIA 9C. Check box 1f State (IL) rund& are being used ror !his development. D 90. Qied< box If thiS ls a project being funded In part/In whole by an SMC grant? [:J 10A. DESCRFTION OF DEVELOPMENT Temporarily beach a barge to transport a Stator and Rotor to another power generaUng station.

108. NAME Of DEVELOPMENT 10C. SINGLE FAMILY HOME ONLY Zion Solutions Stator-Rotor Transfer Estimated fUluni nome value:

100. LOCATION OF DEVELOPMENT 11. LEGAL DESCRIPTION East of Fulton Ave at the end of Shiloh Blvd SW 23 46N 12E Y. Section Secllon Township Range streetAddreas 101 Shiloh Blvd, Zion, IL 60099

, Munlclpalty PIN 04-23-100-006,04-23-100-004 City of Zion (Ir more than three PIN exlsla far Ole proJed, please fnctuda on a separate attachment)

Lake Michigan Dead River 42*2&'58.452.N 87"48'0.64"W Watershed Sub-Watershed Letilude l.ongjtude

12. LIST ALL LOCAL, ST~TE. AND~ PERMIT APPLICATION, OR ~QY~LET'!!RS REQYIRED F~OPllENT I i .. . ~ ~'10. Qa1!! . I Permit Type 1Reglona1Pennlt11 I

1* -- _ * . *. . lssul!.'llAgency

,_u.~~.!.~_!1-~-~~--- .... .*-.. -*+-

I

-... I

  • Permit Number l*~~*-~-8----*~--

_* -**--*-- .i Pemit Issue Date I

13A. UNOER PflfAl.TY OF INTEMTloNAi.. MISREPRESENTATION ANoioR PERJURY, Ideclare lhat Ihsve 9"8ll1iled arxl. made Ills appllcatlon and it is J.-aiid'ciiimtkillie ~Of my.. I knolWldge and bellef. Iagree to COll8IM:t said development In campllsnce with Iha permitted doa.imenlll. I n181'1Z8 that ttie Wormatton ttiat I have allkmed hOIVOll bms abael& b' the Issuance of the Wala rahed Development Pennil(s) herein# and approval of plw In canndon theAIW!lh ahall not be canatued 1o permt any conatrue11on upon said premises or lill lhereot In WllaUonyr~~ of eny J~ble ordln

  • lo excuse ttie owner or his successors In lille rrom Clll!llJMng ther11wfth.

Pre Construction $ Inspection Deposit t,..__ _ _ _ _ _ __ _

5 Year Mitigation S - - - - - - - - -

Surety$---- - - - - - - Wetland Credit held by _ _ _ _ _ ___TOTAL SECURITY $

17. FINAL APPROVAL FOR PLANS ENTITLED AND DATED:

Date of Signature Approved ByfTitle PE.#/CWS#

Community Professional Engin-...*-.....

Certified Wetland Specialis.*r . - - - - - - - - - - - - - - - - - - - - - - -- - - -

Lake Co. Stormwater Management Commis..,s::.:io"'n'------- - - - - - - - - - - - - - - -

EnfurcemernOfficer _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~

This permit Is subject to the following conditions:

(a) This permit does not convey title to the permittee or recognize title of the permittee to any submerged or other lands, and furthermore. does not convey, lease or provide any right or rights of occupancy or use of the public or private property on which the project or any pert thereof will be localed, or otherwise grant to the permittee any right or interest In or to the property, whether the property is owned or possessed by the County of Lake or by any private or public party or parties.

(b) This permit does not release the permittee from liability for damage to persons or property resuhing from the work covered by this permit, and does not authorize any injury to private property or invasion of private rights.

(c) This permit does not relieve the permittee of the responsibility to obtain other federal, state or local authorizations required for the construction of the permitted activity; and If the permlttee Is required by law to obtain approval from any federal or state agency to do the work, this permit is not effective until those approvals are obtained.

(d) The permittee shall, at his own expense, remove all temporary piling, cofferdams, false work. and material Incidental to the construction of the project, from the fioodprone area, river, stream or lake In which the work is done.

(e) The execution and details of the work authorized shall be subject to the approval of the SMC. SMC representatives shall have right to access to accomplish this purpose.

(f) Application for permit will be considered full acceptance by the permittee of the terms and conditions of the permit.

(g) The SMC, In issuing this permit has relied, upon the statements and representations made by the permlttee; if any statement or representation made by the permlttee Is found to be false, the permit may be re110ked at the option of the SMC; and when a permit is rel/Oked all rights of the permittee under the permit are voided.

(h) If the project authorized by this permit is located In or along Lake Michigan or a meandered lake, the permillee and successors shell make no claim whatsoever to any interest in any accretions caused by the project.

(i) In issuing this permit, the SMC does not approve the adequacy of the design or structural strength or the structure or improvement.

0) Noncompliance with the conditions of this permit will be considered grounds for revocation.

(k) If the work permitted is not completed within three years of the permit issuance date , this permit shall be void .

This permit is subject to further special conditions as follows:

PROVIDE PRIOR NOTIFICATION OF THE PRE-CONSTRUCTION MEETING TO SMC (847) 3n*7700 INSPECTOR FIVE WORKING DAYS BEFORE START OF CONSTURCTION TO ENABLE SMC ATTENDANCE.

PROVIDE AS-BUilT PLANS OF THE STORMWATER MANAGEMENT SYSTEM TO SMC PRIOR TO FINAL SEEDING.

Lake county Watersheds 0

,......... 2 3 -

trGllfUitul'W'"tt:'.JW'd L~,_.lW Pill!WIMIDr. .

s" l9'1aln.

"'. . . c;.9

'-""'-C**

  • -c..

'* Si: 'l., , . it.a

.. ,....,. ...... DMln ll . Dlb.~RNtrW*tashed ID.Nalll\~110. .

H,.c...9 IL~ D111N9t 0.0 l) . ~ D';!J ,.,..,....,.

I* ~IQv t

    • ~O'Cl:t
16. l._.0..- ..........

!!~~

JOINT APPLICATION FORM FOR ILLINOIS ITEMS 1 AND 2 FOR AGENCY USE

1. AppllcatlOn Number 2. Date Reeeivelf
3. and 4. {SEE SPECIAL INSTRUCTIONS} NAME MAILING ADDRESS AND TELEPHONE NUMBERS 3a. Applicant's Name: 3b Co.Applicant/Property OWner Name 4. Authorized Agent (an agent u; nol raquired);

rit needed or l different from applicant).

Gerard van Noordennen Jedd Anderson Company Name (If any)

  • Company Name (If any). Company Name (if any)

Zion Solutions, LLC. ChristopherB . Bul'keEng~eerlng.Ud Addf'8S6; Address Address*

101 Shiloh Blvd . 9575 W Higgins Rd ** Suite 600 Zion, IL 60099 Rosemont, IL 60018 Email Address: Email Address*

Emai1Add""8" 1 n01111nnoordttnnen@en....,V!<OfUllons oom jedd@cbbel.com Appllcanfs Phone Nos. w/area code Applicanfs Phone Nos w/area code AQent'11 Phone No.s w/area code Business 224-789-4025 Business: 8Usil'J8SS: 847-823-0500 Residence* Residence* Residence:

Cell* 86D-462*9707 Cefl* Cel: 847-343-7818 Fax* 224-789-4008 Fax Fax: 847"'823--0520 STATEMENT OF AUTHORIZA 110N 1hereby authorize, Jedd Anderson to ad in my behalf as my agent in the ptocesslng of thts appUcation and to fumish, upon requasL supp~1ntal information m &1,1pport of this pennd application

.,,,j, / *-* __/J..) j:_ Gerard van Noordennen Ma~ 26, 2016

/ '/ MiNica11t's .itOrlatl:lfe Date

5. ADJOINING PROPERTY OWNERS (Upstream and Downstream of the water body and withrn Visual Reach of Projeci)

Name Mailing Address Pnone No wtarea code

a. Available upon Request b.

c.

d.

6. PROJECTTITLE:

Zion Solutions Stator-Rotor Transfer 7 PROJECT LOCATION 101 Shiloh Bllld. , Zion. IL 60099 UT Ms I LATITUDE I 42.44957 ON Northing*

LONGITUDE . -87.80015 ow Easting*

STREET, ROAD, OR OTHER DESCRIPTIVE LOCATION LEGAL QUARTER SECTION TOWNSHIP NO. RANGE DESCRIPT 101 Shiloh Blvd., Zion, IL 60099 SW 23 46N 12E 181 JN OR D NEAR CITY OF TOWN (check appropriate box) WATERWAY ~IVERMILE Municipality Name (ff applicable)

Zion Lake Michigan NIA COUNTY STATE ZIP CODE ake IL 60099 tevised 2010

] Corps of Engineers 0 IL Dep't of Natural Resources D IL Environmental Protection D Appllcanfs Copy Agency

ss:nioav ijO::I SNOl.LOOW.SNI 339 loua/AJ UCJpllOJd flll&llWUOJJIW3 ,,


~-~.., ..,

J)lllOdu:l 91........, Cll~ . . ilaaod I 1811"9m~ l ~put~ 'an4 II UOll'llUKIM IP" '""911 pul ~Aw,,Jteq 811cql'IApaa'UOlllJllfdl1111 UJ PIUllQUCIO ~ 8lfl waJlllllUlll U IN,._, I ...... peqJ>>l8P ...-1111JOJ11pw .<quq ti tiOPJiddV

~

  • IYl:kk:RJ :t:llfl NUU.V".Jl:IR:t:U\ NU ~JI lddY "VJ.
  • uogqdda -.n Ul PllllDllP IQllP8 JllllO

>>~~ *~q ........ llOOfJD '8IBIS 'al8'lllllll )IU9f!.:&-ao WOJ.~ W*J>.~ U01<<111118'JJO fll!AOlddl 1tr1 'O

........,UD>llGM ...... llilt"80IPUJ "llll(Pft~ put~

811111 IUO..a 111111 .831. It W JI ::LI.ON x ON

  • 11 UORIJllOIP VIN ltM..,.lllfiJUAflWqp.eDW

~t*uDOMOU)ltllnoe

.q ~IAP 911 lO UDAJOd Ault 9' '!I~

  • efll&q ot pu91dn WOJJ dWeJ e6JBq e Aq peutl8da eq lllft\ WMHO 8lU 'UB8J40IW 9>f81 4lfM P8IBPOl88 SpuBfJ&M JO WMHO UILlllM pesOdoJd IHJ ON

' eea) NOLlVBNad OW HOU ~ .:K> 1:i UB81ai>1n 8>181 t4lfM P8l8I008l8 8PUBA8M JO WMHO Ul411M pesodo.ld HU ON

~ W8) 03Tl:t SRBJ.VM H3H.LO :IO 93WV HI Y:RN :J:JV:AllS 'IJ.

81QBOfiddV JON

SOWA ::HBnO NI J.Nn0WV 8fqaouddv ION ::ldA1
  • peeockud e6Jeqos10 ON
3f>HYHOSIO MO:I Cs)NOBY:RI "O~

'88fl U'qJ'lJ JOJ UOll&iS 6ullllfeua6 J81AOU8 OJ J~O~JOl&JS J9jSUBJ.l Md~ CB3N CJHt/ 390cANld .,

,_....-U.

'WMHDPllllW~ . .P

"°,.._19111>> ........... _... =.......................

....... IO~*'ll*Pllll90W ............,...,... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

',.aq . . . . . . . . . . . Clf ..........-." .................... pue~-.ct~---

........... _..,..,... .. ..-...,.... ................... tlll *.C-t1ftMHO ....... la9l>> .......OH

...............................'lllL 1WMHO) ..... Jlllllln .............................................., . .CIPll~911 . . . . . . . .. .

  • ...,._ ..,............,,, 'nllJll .....,.._,*_,llilllillOWHo>._..,lllWllP .... ~"'91-..0911l-.~llJll.L ._..,_..... I ;111(-0

,.,,,, ............. ...._.. ............... lllrlllt ................... ~ ,._,..1111191,..-0,. .. ID f...,_.JO.......,PPlflllld..._

GllllfPllUafc.lllldGlfW*-d""" ... --.,,-...pn ...._ ,...........,.w11...,.111-...,.......

~D10qlllll~- ............ Cll . . . . . . . UDIZ811111! ..... *.,...,........111,~.._.JIUDllflrH*.lllf....,.,..,.9QIWtl

........ pl .. . . . . , , , _ . _ . . .

~:i.:::"*"llUI~

llOTI"lllCllllfl911111Z

~ 1* llf'P'l) :Js:IO J.O:l'O~d ..

~ *~_..___.~............,,::....,.__.__....___....._~ ~....

W 1 inch= 1,000 feet E

I I ' 't'I 11 r S STUDY AREA I * * ** P1P1 t.U t bl*

S"urres. Esri. HERE, Di:iL01 me, USGS, lntermap, inC.Tement F' Corp . NRC:AN, E&ri Japan, METI, Es11 China (Hong Ke>ng). Esn (Tha1la11d), TomTom, 8 Mapmylndia, © OpenStreetMap oontributon;, and !he G!S User Community l.__C_Ll_EN_T_:~-----~~-~---------r-T-IT-L-E:-----------'----------......----_..;..-~

i:i C8BEL # 11.0018.00018 2 ZION SOLUTIONS LOCATION MAP DATE: 8/09/18

~

~

~

I :B CHRISTOPHER B. BURKE ENGINEERING, LTD. OWN. KEK BMK SCALE: 1 *- 1.000*

9575 W. Higgins Road. SUlte 600 *Rosemont, IJ!lno!.- 60018 * (847) 823-0500 ..,c""'H"'KD;;.:._--4_,JMA=-..___.'"'P""L""oT:...;D:;;.ATE::.=:..:_._--=6/9/20="'18:......--4 EXH 1

PROJECT AREA CORPORATE LIMITS COINCIDENT WITH SHORELINE Lake County Unincorporated Areas 170357

I I

I

/

,,, ..-- ~ -

_......I

~

.,......,...JN):j

./-.-

l ...4'Jl'f~\

/~

! 4 J

~

........... :.*~

I

~

l ~

~

j

~11.,

I

~

1

+- if

\l**'I'. ..,

..... ....,,.....,,~

~ It ,,* J

(//T"'..Jlt~-11¥-J II.

-~.........,..

"/~

k liv:ttf .......)

    • ~~n,1

+

I l l

Il

' +-

j

~

-- 1

~

  • W>ftll*~'1

~

~'f ....

+ "'~~*

I i

")

P:..AC~ *W Pl iWOOO ::Jf\ Tdf fiEAr.l l, CC.. 'EP.EC WPl GEOT~>ld F.A.OR:C, T :-. E~

I I I

360' TQ ;:Mc or TUG '.30!\"i c IC

~ LL ,'\RE!\ /IS Sl-'OWN t.:Sll\I.; Wl:.;..L-G~r\l)l:. C crus:iE~ -* Ru~~ Lit*~ -~-:-oNr cn:,;ror~MING TO I I AS iM D-12~~. ~ {Pl I, CLASS C O~ D.

?. J1cc Nm cm1°.Ac-:- 1 ~; s" urs. -o? or I F1NJSHED PAO t:L.: ~84.21' ESTIMA L 1 .:-1L 9+5C 9+6(1

... - p:-o'o* ?O c .

3. SURVt.*t:..O WATEP-Ut*jt: l:.Lt'v'AT:ON i Al\ EN ON 5/3/' 6 ll"' SP/\C[CO, Ii "\;. l 1[ PROJr::crco 8 ,8 WA?'E.R L~.VC:LS FOR OCTOBC.R 20 ' 6 l.~~~ M Tilt£:

OF ' HS FLJ VAT: n~:. I OIOl1' APPROVED BV: ,..... GENERAL NOTES~ RE.V f PURPO!£ BARGE ROLL-ON PLAN 1. U.~E~S10N5 AAE .Af>i'ROl.lt.IA!E 7C !:!". ~Et!RE!iCE D<IA~ICi'IS ARE lt~

fl WllT1EJI PROJECT: DWG NUMBER 0

AAE:"JT~SS~S. SfA"1C~S

'"OCT.

AAE <'O~ l\£FE:ll£'.~CE MO I-RE ~l*:Y-0 TO t.:J.li£ST A ISSUEI I ZION GENERATOR TRANSPORT 159566-81.0 2 ~0\.: 1 ~!:.'lff. C()l>..'f lC~Jf.7 1:l'I, .~llO :A'rOul SHOWi1 !MY Cll.\NG_ ~~ *o S.T B N>OED CC:t'J;"71Q~S Iii TIMF O"' RC* . - Of. ::C'ITt.cT 3::T  : t;CINf:ffi'NC ::>RKJR -o Jr\1*\~*t-.<;;

CUSTOMER: REV NUMBER A fROhl Od>:CllO 1'.RV\11.'llU.SL'l l C ADO VI I

I PSEG-SALEM NUCLEAR B  :!. CROl.*tm PROF":.<: TA.'<EN ~ROM SPAC£CO t'lfC . D"AW1*r.; 9262~SiJR -01 , CATE!l

'>/~/*().

DRAWN 8'fl DESCRIPTION: .I.. coP.Ec>.s-s .I\.'>£ R:lM U.S. AR'llY CCR"S Of E'iCi'llE8S C'<EA! J.i<ES W~TER TJS RAMP &: MATTING PLAN VIEW Lf\'[L f()il[CASJS.

Hi I 14 I l"' I 1.L I

I I

NOTE: . I ALL DISTURBED AREAS SHALL BE RESTORED IMMEDIATELY AFTER TRANSFER OPERATION TO EXISTING CONDITIONS. I

-~

NAGEMENT COMMISSION DECI SHALL CORDINATE WITH ZIONSOLUTIONS, LAKE COUNTY STORMWATER, AND US ARMY CORPS OF ENGINEERING REGARDING RESTORATION ACTIVITIES IF REQUIRED.

.....,l!:--"-'1!111%---

,~

>ER0510~ CO~-YROL ~OT:ES ---------Ml D IN St.:'CH A MA.~"ER AS ro ~*IDmdIZE EROSIO~ son.

>ER THE TIME OF YEAR. SITE CO:'IDITIONS A.."ID THI USE S.

- FEATURES SHALL BE CIDi-STRUCTED PRIOR TO THE

'..BANCE OF l'"'PIA.."ID AREAS.

l\TI'li TEMPORARY OR PER.1to\...11;"ENT MF.A.SURES WITHIN 14 rl'DROl.OGIC DISTURBA..'f\CE. OR REDISTtlm.A.."CE.

S GREATER 'IHA..~ OR EQt.:'AL TO lH.lV, AND APPROVED L BE STABIIJZED \\'IIH SOD. MAT OR BI.Alli'XET DJ REQUIRED O)f All NTERIOR DETThlIO~ BAS~ SIDE

ATTACHMENT 1 Completed Joint Application Form

JOINT APPLICATION FORM FOR ILLINOIS ITEMS 1 AND 2 FOR AGENCY USE

1. Application Number 2 Date Received
3. and -4. CSEE SPECIAL INSTRUCTIONS) NAME. MAILING ADDRESS AND TELEPHONE NUMBERS 3a Applicant's Name 3b Co-Applicant/Property Owner Name 4. Authorized Agent (an agent 1s not requJflld);

(if needed or if d~nt from applicant):

Gerard van Noordennen Jedd Anderson Company Name {Jf any) . Company Name (If anY): Company Name (If ;my)'

l.ion Solutions, LLC. Christopher B. Bul'ke Engineering, Ltd Addl8SS.. Addre5$. Address; 101 Shiloh Blvd. 9575 W. Higgins Rd., Suite 600 Zion, IL 60099 Rosemont, IL 60018 Emall AddMss: Email Address:

Email Addreu; aDVannoordannenii!enemvsolutions com Jfldd@obbel.aom Appicant's Phone Nos w/area code Applicant'* Phone Nos. w/area codtl Agent's Phone Noa w/area code Business. 224-789-4025 Busmess: . Buli11ess: 847--823-0500 Residence: Residence Rea1denc::e:

Cell* 860-462-9707 Cell Cell: 847-343-7818 Fax* 224-789-4008 Fax Fax: 847-823-0520 STATEMENT OF AUTHORIZA 110N I hereby authonze, Jedd Anderson to act in my behalf as my agent in the processing of th* application and to fum11h, upon request, suppl71.ntal information ln gvpport~fthis pennit apphcation

,41 ( -. /J .,/"f-. -~ Gerard van Noordennen May 26, 2016

// ~riicant's S!Ori.atllfe Date

5. ADJOJNn'ilG PROPERTY OWNERS (Upstream and Downstream of the water body and within Visual Reach of Project)

Name Ma1l1ng Address Phone No w/area code t

a. Available upon Request b.

c.

d.

6. PROJECT TITLE:

Zion Solutions Stator-Rotor Transfer 7 PROJECT LOCATION*

101 Shiloh Bllld , Zto.1, IL 60099 UTMs LATITUDE.

42.44957 ON Northrng*

LONGITUDE. -87.80015 ow Easting:

STREET, ROAD, OP. OTHER DESCRIPTIVE LOCATION LEGAL QUARTER SECTION TOWNSHIP NO. RANGE DESCRIPT 101 Shiloh Blvd .* Zion, IL 60099 SW 23 46N 12E

~ IN OR U NEAR CITY OF TOVVN {check appropriate box) WATERWAY RIVER MILE Municipality Name (tf applroable)

Zion Lake Michigan NIA COUNTY STATE ZIP CODE lake IL 60099 levised 2010

] Corps ot Engineers D IL Dep't of Natural Resources D IL Environmental Protection D Appficant's Copy Agency

SS3~CJ'i ijQ:J SNOU.OmU.SNI :SS

~

UOJP810Jd~


~~~~>V*dY~~

paeoclald 811811""811'11' OI~ tll "88tod I llll . ..llllPJ I -...... ... '8fllldlam '8NI 11 uoia-uoJUI qorw '1'11911 pu9 ~Au" i-.

Ill OJ 11111pua'w~4111UIPIUflllmUIJllllllUl1J'811*.ll!IWWIua119llll!m I 'UflU8ll PICll.l:MIP lllNJS 8'11JOJ81*11 lqMlj -r liCIJl'Oiddlf NUU.Y".Jl:I H:U\ NUl.LYJI lddY *111-Ulgqddll IN UI paqneep "llAIP9JllllO

.ID _,,_P"IP 'UllP\lllUll3 'tall1PIUJ9 .1111 ........e,cil.IO '111911 ~ 'llU*P8:1..._ UIO,f~ WIP~ ~ ~~...!" 1111 'Ii

..SU,.WpUO)l.IOM..._....... VIN llM . . . fllfl ...AptlltlllUOW "UDIP89 flllllll8H put~ uqllJdwaolllOU Jtllnot

. . UllUOnl.tMID ti.- . *A 11 1~.q~11uouuamdu911n

  • e6mq oi pue1dn WOJJ dWBJ elJJBq B .(q pauuads aq lllM WMHO 8tU "UB6JlPIW &>f81111fM P91BIOOSS8 SPU8fl8M JO WMHO UJl.IJ!M pesodoJd IHJ ON

~ eee) W':IOWOOl'\Y .:IO 'C UB8'1P!N 8>18'1 qUM JJGIBPD888 8PlJ8118M JO WMHO U~IJM pesodo.ld HU ON

-al <J3Tti mBlYM GUO HO 80NY'U3M .:IO falO\' NI 3:Jll:Rl'lS °g!.

8fQBOliddV ION

SOWA omno NI J.HnCMV QfqBOac:fdy ION =3dAJ.

aHJ. ONY CEEWHOBfO E>Nf:113 "IWB.LYW ;fO (S)3dAJ. *~ ~

  • pesodQJd e6JetpSJO ON HO:I CS)NOSYEIH '01.
  • asn 8.lrqrlJJOJ uoneis 8unuruefS JeqJoua op~OH-JOIBJS J918U&J.1
.J.::Br~d :IO <B3N l'IMNOPlll-~ . .,, ........ JOUOlllllllP*tll*Pllllflffl .............. ..,... . . . Mll . . . . . . . . . . . . . . 1111M81o\Ullld~lllll)lf*lllM'-*..,....9l(J.

-a .. ....-v....-..111111D1J._..fll'9..,._..... ~ ....

ell*J119-lllll>> ......IMll_.,.. i...a . . . . . . . _,.., . . . .,..,.. .....,_.......... llil .._.llMH()elli..,.. .IO~GN

,. . .,__. ,..=. . .,.,.. . .,. . . . ,. . . ................. atlfR *

..... Gllllli .. 111111111111111*11111 . . . . . . . . . tll.I. VWHOJ . . . Jllllfll ...........,,........................14 .............

...... - ............ '# '1'"9/lt ...................CWMHQ} . . . . . . . . . JO .... ... 111'911(1**** ,.....

....Cll_....................__ _.llll..,._,,._..,......._UIOY '...,..,....c-..o lllllNlll...,,.._...... ,...,_.P...-09".,._llU.

-.=.,,..°"',... ... .................

"llllJllllll)OU .. 1'DdlUlll .........

1111W111111Mte.-Ollllftllllc).1D11tP111119 ... ,,JAM ........ . . , ............. ...oc1 ...... 111 ........... siut ....... .ICl( ......*Gl-.ati puaC.--

lllllllllll*JOllOIDll~llll--* ....... C11* ...... L111Zeiair .... *..-.----Dl ll Pll'ct .................... !!l:Mn ........... On ...... 11111Z

(taqlef 1*.....,, NOl.LdRf ~ ..

ATTACHMENT 2 IDNR EcoCAT Consultation, Initial Review

Eco~CAT Ecological ConPICl!!C! Aueument Tool Applicant: Christopher B. Burke Egineering, Ltd. - Rosemont IDNR Project Number: 1610258

Contact:

Jedd Anderson Date: 05/03/2016 Address: 9575 W. Higgins Road , #600 Rosemont, IL 60018 Project: Zion Solutions Address: 101 Shiloh Blvd., Zion

Description:

The project consist of beaching a barge on the shore of Lake Michigan and loading material on it, for transport to another site.

Natural Resource Review Results The Illinois Natural Heritage Database shows the following protected resources may be in the vicinity of the project location:

Illinois Beach INAI Site Illinois Dunes North INAI Site North Dunes Nature Preserve Bearberry (Arctostaphylos uva-ursi)

Blanding's Turtle (Emydoidea blandingii)

Common Bog Arrow Grass (Triglochin maritima)

Downy Yellow Painted Cup (Castilleja sessi/iflora)

Dune Willow (Salix syrtico/a)

False Asphodel (Tofieldia g/utinosa)

Few-Flowered Spikerush (Eleocharis pauciflora)

Kalm's St. John's Wort (Hypericum kalmianum)

Least Bittern (lxobrychus exi/is)

Little Green Sedge (Carex viridula)

Marram Grass (Ammophila breviligulata)

Pale False Foxglove (Agalinis skinneriana)

Redveined Prairie Leafhopper (Aflexia rubranura)

Richardson's Rush (Juncus alpinoarticulatus)

Sea Rocket (Cakile edentula)

Seaside Spurge (Chamaesyce polygonifolia)

Trailing Juniper (Juniperus horizonta/is)

Tubercled Orchid (P/atanthera f/ava var. herbiola)

An !DNR staff member will evaluate this information and contact you to request additional information or to terminate consultation if adverse effects are unlikely.

Location The applicant is responsible for the accuracy of the location submitted for the project.

County: Lake Township, Range, Section:

46N, 12E, 23 Page 1 of 2

/DNR Project Number: 1610258 IL Department of Natural Resources Government Jurisdiction Contact U.S. Army Corps of Engineers Nathan Grider 217-785-5500 Division of Ecosystems & Environment Disclaimer The Illinois Natural Heritage Database cannot provide a conclusive statement on the presence, absence, or condition of natural resources in Illinois. This review reflects the information existing in the Database at the time of this inquiry, and should not be regarded as a final statement on the site being considered , nor should it be a substitute for detailed site surveys or field surveys required for environmental assessments. If additional protected resources are encountered during the project's implementation, compliance with applicable statutes and regulations is required .

Terms of Use By using this website, you acknowledge that you have read and agree to these terms. These terms may be revised by IDNR as necessary. If you continue to use the EcoCAT application after we post changes to these terms, it will mean that you accept such changes. If at any time you do not accept the Terms of Use, you may not continue to use the website.

1. The IDNR EcoCAT website was developed so that units of local government, state agencies and the public could request information or begin natural resource consultations on-line for the Illinois Endangered Species Protection Act, Illinois Natural Areas Preservation Act, and Illinois lnteragency Wetland Policy Act. EcoCAT uses databases, Geographic Information System mapping, and a set of programmed decision rules to determine if proposed actions are in the vicinity of protected natural resources. By indicating your agreement to the Terms of Use for this application, you warrant that you will not use this web site for any other purpose .
2. Unauthorized attempts to upload, download, or change information on this website are strictly prohibited and may be punishable under the Computer Fraud and Abuse Act of 1986 and/or the National Information Infrastructure Protection Act.
3. IDNR reserves the right to enhance, modify, alter, or suspend the website at any time without notice, or to terminate or restrict access.

Security EcoCAT operates on a state of Illinois computer system . We may use software to monitor traffic and to identify unauthorized attempts to upload, download, or change information, to cause harm or otherwise to damage this site. Unauthorized attempts to upload, download, or change information on this server is strictly prohibited by law.

Unauthorized use, tampering with or modification of this system, including supporting hardware or software, may subject the violator to criminal and civil penalties. In the event of unauthorized intrusion, all relevant information regarding possible violation of law may be provided to law enforcement officials.

Privacy EcoCAT generates a public record subject to disclosure under the Freedom of Information Act. Otherwise, IDNR uses the information submitted to EcoCAT solely for internal tracking purposes.

Page 2 of 2

ATTACHMENT 3 Completed USFWS Section 7 Review by CBBEL

MEMORANDUM May 9, 2016 TO: Project File FROM: Jedd Anderson

SUBJECT:

USFWS Threatened and Endangered Species Evaluation - Zion Solutions, Zion, Lake County, Illinois (CBBEL Project No. 110016.00018)

We have completed an evaluation of the proposed project in regards to federal listed threatened and endangered species based on the current USFWS process. The USFWS has implemented an Online Process for the completion of threatened and endangered species reviews for projects. Based on review and completion of their new process and the findings of IDNR regarding the potential impact to threatened or endangered species, in our opinion this project will have "no effecr and consultation is concluded.

LIset d S;pec1es Northern long-eared bat Proposed as Hibernates i n caves and mines - swarming in Myotis septentrionalis Endangered surrounding wooded areas in autumn. Roosts and fora~es in upland forests and woods .

Piping plover Endangered Wide, open, sandy beaches with very little grass or other Charadrius melodus vel!:etati on Piping plover Critical Habitat Wide, open, sandy beaches with very I ittle grass or other Charadrius melodus vegetation Rufa Red knot Threatened Only actions that occur along coastal areas or large Calidris canutus rufa wetland complexes during migratory window of May 1 -

September 30 Eastern massasauga Sistrurus Candidate Graminoid dominated plant communities (fens, sedge catenatus meadows, peatlands, wet prairies , open woodlands, and shrublands)

Karner blue butterfly Endangered Pine barrens and oak savannas on sandy soils and Lycaeides melissa samuelis) containing wild lupines (Lupinus perennis), the only known food plant of the I a rva e Eastern prairie fringed orchid Threatened Moderate to high quality wetlands, sedge meadow, Platanthera leuccphaea marsh, and mesic to wet prairie Pitcher's thistle Threatened Lakeshore dunes Cirsium pitcheri Species Listing and Evaluation Northern Long Eared Bat - No suitable habitat exists at this site.

Piping Plover - This project is located on the beach of Lake Michigan outside of the critical habitat area of the Plover. The area of temporary impact to the beach is minimal and covers a very small surface area of+/- 0.2 acres. The project will be completed well outside the CHRISTOPHER B. BURKE ENGINEERING, l TD.

  • N:\ZfON\110016.00018\Env\Docs\USFWS T&E No Effect 050916 Jma.docx

MEMORANDUM Plovers nesting season, and being a mobile species live heathy individuals will be able to avoid the temporary work site.

Rufa Red Knot - This project is located on the beach of Lake Michigan. The area of temporary impact to the beach is minimal and covers a very small surface area of +/- 0.2 acres. The project will be completed well outside the Red Knots migration through Illinois ,

and being a mobile species live heathy individuals will be able to avoid the temporary work site.

Eastern Massasauga - This project does not contain suitable habitat for this species and is not known to occur within this area of Lake County.

Karner Blue Butterfly - This project site does not contain pine barrens and oak savannas on sandy soils that contain wild lupines (Lupinus perennis) , and therefore this species is unlikely to occur on this property.

Eastern prairie fringed orchid - The locations of the Eastern prairie fringed orchid are well known in the region, there have been none identified within these isolated study areas based on several detailed botanical surveys completed and none of the onsite habitat currently, therefore this species is not expected to be present or affected.

Pitcher's Thistle - According to the USFWS website Pitcher's thistle "was extirpated from Illinois but has been reintroduced in Lake County". A floristic inventory of the site found no thistles within the 0.4 acre study area.

Conclusion Given that the impact is temporary, limited in area, and located in a area significant disturbed by human activity, and based on our field visits to the site, and intent to assess the area prior to commence of work , we have determined that the project will have "no effect" on listed or candidate species, their habitats, or proposed or designated critical habitat.

  • CHRISTOPHER B. BURKE ENGINEERING, LTD.

N:\ZION\110016.00018\Env\Docs\USFWS T&E No Effect 050916 jma.docx

ATTACHMENT 4 Engineering Plans with Construction Sequencing

STA. 1o+oo IS LOCATED 3'-

AT THE EAST FACE OF THE SHEET PILING CAP BCF I wr.

B/F L 18C

.. //;'-rr===-=~:=:==~~~~~~~~~_:;_;~.~=*~:---:JS 2'-7"

/ ------------ 46' -1 o" --------.i.-1. . . - 16' - .- - + - - - - - 33' --------t--__::;;:~~---.1..---

\

SHORELINE I \ _ (MAY 3, 21 9+70 9+80 9+90 10+00 10+10 10+20 10+30 10+40 10+50 10+60 10+70 10+80 10+90 111+00 11+10 OCTOBER :

EDGE WATER THIS ELEV1 STA. 10+96 STA. 10+00 IS LOCATED OT SECTION FROM SHEET PILE RETAINING WALL EL. 587.0' AT THE EAST FACE OF REMOVE 4'H x 30'W THE SHEET PILING CAP I

I r EXISTING PROFILE AT TEMP ROADWAY 7.4 - - (46'-10") - -

I l I I I

9+50 9+60 9+70 9+80 9+90 10Lo 10+10 10+2> 10+30 10+60 10+70 11 1+00 EST. CUT: 100 CY °J 10+80 1 10+90 I ::..:'. lD t.:>CY CO I:~ o+

CY tD W01

~ +

S SHOWN ARE TO BE 3S?

I.REA WILL BE RESTORED TO ITS OCY CYW

  • W *

>N UPON PROJECT or-~ c..:>~

~ (/) 8 (/)

I REV_~#....I ______R_EV1S

._I _ _ _ _ ____...__DA_:re:_.._IREV_._BY_.l_CH_K_BY__.:11

_ 1o_Ns THIS oocul<<NI' is lHE PROP£RT'( " ' - CRAME ~ - . na DOC1A1D1T ITTTLE: _ * -~~

ATTACHMENT 5 Wetland I Water Assessment

CHRISTOPHER B. BURKE ENGINEERING, LTD.

9575 West Higgins Road Suite 600 Rosemont, llllnols 60018 TEL (847) 823-0500 FAX (847) 823-0520 May 9, 2016 Zion Solutions, LLC 101 Shiloh Boulevard Zion, Illinois 60099 Attention: Darlene Murphy

Subject:

Wetland/Waters Assessment of the Zion Solutions, LLC Stator-Rotor Roll-On Site, Zion, Lake County, Illinois (CBBEL Project No. 110016.00018)

Dear Ms. Murphy:

As requested, on May 5, 2016 Christopher B. Burke Engineering, Ltd. (CBBEL) completed a wetland assessment of the Stator-Rotor Roll-on site. This report was prepared to document our findings.

The study area is located east of Shiloh Boulevard within the Zion Solutions property in Zion, Lake County, Illinois, as shown on the attached Exhibits. Within the study area Lake Michigan was delineated as a waters of the United States. No wetlands were identified adjacent to the lake within the study area. The delineation was completed in accordance with the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Midwest Region {October 2010). The waters limits are shown on Exhibit 7. Information collected on site is listed In the attached data forms.

METHODOLOGY The Regional Supplement to the Corps of Engineers Wetland Delineation Manual:

Midwest Region (October 2010), identifies the mandatory technical criteria for wetland Identification. The three essential characteristics of a jurisdictional wetland are hydrophytic vegetation, hydric soils and wetland hydrology as described below:*

Hvdrophvtic Vegetation: The hydrophytic vegetation criterion Is based on a separation of plants into five basic groups:

1. Obligate wetland plants (OBL) almost always occur {estimated probability >99%)

in wetlands under natural conditions; Christopher B. Burke Engineering, Ltd. Zion Solutions, LLC 1

2. Facultatlve wetland plants (FACW) usually occur in wetlands (estimated probability 67-99%), but occasionally are found in non-wetlands;
3. Facultatlve plants (FAC) are equally likely to occur in wetlands or non-wetlands (estimated probability 34-66%);
4. Facultatlve upland plants (FACU) usually occur in non-wetlands (estimated probability 67-99%), but occasionally are found in wetlands; and
5. Obligate upland plants (UPL) almost always occur (estimated probability >99%)

in non-wetlands under natural conditions.

Three procedures completed in the following order are used to determine if hydrophytic vegetation Is present: *

1. Rapid Test: The Rapid Test for hydrophytic vegetation is met if all dominant species across all strata are OBL or FACW, or a combination of the two based on a visual assessment.
2. Dominance Test: Using the 50120 Rule, if greater than 50% of the plants present are FAC, FACW, or OBL, the subject area meets the hydrophytic vegetation criterion.
3. Prevalence Index: Each plant species in a sampling plot Is assigned a numeric value (OBL=1; FACW=2; FAC=3; FACU=4; UPL=5). Based on the sampling data, the absolute cover is calculated for each species in each stratum and using the specified formula, if the Prevalence Index is 3 or less, hydrophytic vegetation ls present.
4. Mnmholonical Adaptations: Various species may dP.Velop physical characteristics after growing in wetland areas such as multi-stemmed trunks, shallow roots and buttressed stems. Hydrophytic vegetation is present if an adaptation is observed in more than 50% of FACU species growing in an area that contains hydric soil and wetland hydrology.

Hvdrlc Soils: Hydric soils are defined in the manual as "soils that are saturated, flooded or ponded long enough during the growing season to develop anaerobic conditions in the upper part." Field Indicators of hydrlc soil are found in the NTCHS Field Indicators of Hydric Soils in the United States (USDA Natural Resources Conservation Service 2006b or current version).

Wetland Hydrologv: The wetland hydrology criterion is often the most difficult to determine. Typically, the presence of water for a portion of the growing season creates anaerobic conditions. Anaerobic conditions lead to the prevalence of wetland plants.

Morphological adaptations of plants, driftlines and watermarks are examples of wetland hydrology field indicators.

Christopher B. Burke Engineering, Ltd. Zion Sofutfons, LLC 2

RESULTS AND DISCUSSION STUDY AREA The study area contains an existing gravel parking lot and a portion of the beach of Lake Michigan, as shown on the attached Exhibits. The study area, characterized at data points 18 and 28, is east of the Shiloh Blvd terminus. No *A" points were taken as no wetlands exist within the study area. Two data points were taken because a sheet pile bulkhead wall separates the beach from the east side of the parking lot.

The vegetated portion of the study area adjacent to Lake Michigan was dominated by beach grass (Ammophlla brevlllgulata). A few specimens of wormwood (Artemisia vulgaris), sand dune willow {Salix cordata), Queen Anne's lace (Daucus carota), Panic grass {Panicum virgatum) and cottonwood saplings (Populus deltoides) were found within the study area. The substrate in the vegetated areas consisted of beach sand.

No wetland areas were identified within the study area. The Corps of Engineers identifies the Lake Michigan Ordinary High Water Mark/jurisdictional limit to be at elevation 581.5.

REFERENCE MATERIALS The following reference materials were reviewed and used to assist in the wetland field reconnaissance. They are included as Exhibits 1-6.

LOCATION The study area is located east of Shiloh Boulevard terminus in Zion, Lake County, Illinois (Exhibit 1). Geographically, the study area Is located In Section 23, Township 46 North, Range 12, and East of the Third Principal Meridian. The latitude and longitude for the project site Is 42.449565.N; -87.800148°W. Study area boundaries were established during a field walk down, with Zion Solutions staff.

NATIONAL WETLAND INVENTORY The National Wetland Inventory map (NWI), Zion Quadrangle (1983), indicates no wetlands are mapped within the study area (Exhibit 2). The NWI serves only as a large-scale guide and actual wetland locations and types often vary from that mapped. The following was mapped within the Study Area:

L1UBH - Lacustrine, Unconsolidated Bottom, Permanently Flooded LAKE COUNTY WETLAND INVENTORY The Lake County Wetland Inventory map (LCWI) and Advanced Identification map (ADID), Benton and Zion Townships (1993), indicates mapped wetland within the project Christopher B. Burke Engineering, Ltd. Zion Solutions, L_LC 3

5 t::: P S- J. H - Io 3 ZS-:J.01/ - 010~

CHRISTOPHER B. BURKE ENGfNEERING, LTD.

957S ~ H;gglns Road Slite SOC P.ose.,,ont llliric*s 60018 TEL (847) 823--0500 FAX (£147) 823-0520 June 13, 2016 Lake County Stormwater Illinois Department of Natural Resources Management Commission Office of Water Resources 500 W. Winchester Road, Suite 201 160 N. LaSalle Street, Suite S-703 Libertyville, IL 60048 Chicago, IL 60601 Attention: Scott Griffith, PE Jim Casey Regulatory Supervisor Lake Michigan Permits

Subject:

Zion Nuclear Station - Barge Transport of Stator/Rotor Temporary Construction Activities at Lake Michigan City of Zion, IL (CBBEL Project 110016.00018)

Dear Mr. Gnffith and Mr. Casey:

On behalf :>f ZionSolutions, LLC, Christopher B. Burke Engineering, ltd. (CBBEL) is submitting a Watershed Development Permit and Joint Permit Application with additional supporting documents requesting authorlzatfon to construct a temporary access roadway and dock a barge at the Zion Nuclear Station to transport a Stator/Rotor to another power generating station for re-use. The project is located on the shoreline of lake Michigan and at an adjacent existing staging area within the Zion Nuclear Station at the end of Shiloh Boulevard within the City of Zion. Lake County, IL.

The project consists of constructing a temporary access roadway and docking a barge on the 1

shore of Lake Michigan which will transport the Stator/Rotor. which does not allow for surface transport given the size and weight (>1,000,000 pounds). The temporary access roadway will be constructed with timber mats on crushed and compacted limestone and will extend from the existing gravel parking lot to an upland beach area. This area is above the Ordinary High Water Mark of lake Michigan (OHWM), which corresponds to an elevation of 581.5 ft.

NAVD88 (580.5 ft. International Great Lakes Datum 1985 (IGLD 85)) . At the terminus of the temporary access road, a gangway/bridge wm be lowered into place from the barge to the terminus, spanning the limits of the waters of the United States Ordinary High Water Mark (OHWM). Tre Stator/Rotor will then be rolled on to the barge using a high tech trailer system.

The barge is specialized and its buoyancy can be regulated using a water ballast system, which can level the barge or float one end or the other as necessary to allow beaching and freeing from the shoreline. A tugboat will be used to position the barge arid move it once the Stator/Rotor are secured on board. The attached Stormwater Permit Plan Set shows the work plan, information regarding soil erosion and sediment control measures for the project, construction sequencing and restoration .

According te> the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) for Lake County, IL and Incorporated Areas Panel 85 of 295, revised on September 18. 2013, a portion of the project area resides within regulatory Zone A floodplain associated with Lake Michigan (Exhibit 2). CBBEL completed a Base Flood Elevation (BFE) study for the Zion Nuclear Station that has been previously approved by Lake County Stormwater Management Commission in 2011. The study utilized a floodplain elevation of 584.75 ft {NAVD88) (585.0 ft NGVD1929) for the beach area. The proposed project will require temoorary fill within the regulatory floodplain and beaching of a barge within Lake Michigan, which is a Public Waters of Illinois. While there will be no dredging or filling within the OH\NM, there will be approximately 20 cubic yards of temporary fill within the regulatory floodplain. The civil improvements within the regulatory floodplain are only temporary and the site area *win restored to its previous condition upon completion of the project, which is expected to take onfy a one or two weeks. In our opinion, the small amount of temporary fill within the floodplain of Lake Michigan will not increase flood risk for adjacent properties and should be exempt from providing compensatory storage.

CBBEL completed a wetland and water assessment in suppert to obtain a Regional Permit 11 from the USACE, which was filed on May 26, 2016 under a separate cover. A copy of the USACE permit application and supporting documentation Is also enclosed with this letter.

Construction is scheduled to begin in August 2016. On behatf of ZionSolutions, we are requesting authorization to proceed with the proposed project. ff you have any questions, please do not hesitate to contact me.

Sincerely Darren Olson, PE, CFM. D.WRE Senior Water Resources Pr~ect Manager

Enclosures:

Joint Permit Application Watershed Development Permit Application Stormwater Permit Plan Set Location Map FIRM USACE Wetland Permit Information Co: Darlene Murphy - ZionSolutions OTO N.ILIONl.110016 :>CC18\Water\DocsU.....SMC_IONR_06132016.docx

I I I

5. NAME &ADDRESS OF PROPERTY OWNER 6. NAME & ADDRESS OF ENGINEER/AGENT T. NAME & ADDRESS OF CERT. WETLAND SPECIAUST Darlene Murphy Darren T. Olson - CBBEL Jedd Anderson ~ CBBEL 101 Shiloh Blvd.
  • 9575 W. Higgins Avenue, 9575 W. Higgins Avenue, Zion, IL 60099 Suite 600 Suite 600 Rosemont, IL 60018 Rosemont, IL 60018 Daytime Phone: (224) 7894025 Daytime Plvine: (847) 823-0500 Daytime Phone: (847) 823-0500 Fax: (847) 823-0520 Fax: (847) 823-0520 Fax: (224) 789-4008 Email: dfmu11>hy@energysolutlons.com Email: dolson@cbbel.com Email: Jedd@cbbet.com 8A.. -

p._.

CHECK ntE ONE COHDrTION THAT APPLIES:

Exempt. Water&hed Development Permit Not Required (IV A2)

Minor Development (IV.A., IV.B.}

Major Development OU!slde the Fi>odplaln (IVA, IV .B., IV.O., IV.G.)

88a CHECK AU CONDmoNS THAT APPLY:

Isolated WelllWld Impact (IV.E.)

Request LeUer of No Welland Impact (LONI) (IV.E.)

Development In a FloOdWay (IV.C.3.)
Floodplain Map Revision or Amendment (IV.C.2.g.; IV.C.3.d.(8))
  • Waten:ourue wJDnmage Area >20 Acres and <100 Acres (IVA, IV.O.)
....... Major Development Inside the Floodplain (IV.A., IV.B.. IV.C., IV.D., IV.G.) Watercourse w/Dru111ge Area >100 Aaea and <640 Acres (IV.A., IV.D.}
Ealth Change Approval (ECA) (IV.A.4.b.)
  • Public Road Development(IVA, IV.F.)

.._ Variance Request {V.)

Public Development in the Floodplaln (Appendix E.J.2.)

Exislng Condlllons BFE Only (no devslopmentJ :z BFE or Floodway Delermfnalion (IV.C.}

Oeslgnabld Erosion Control Inspector (DECI Reqlinld)

._ PrHppbtJon Meeting Held Soll Erosion and Sediment Control Review Only i-D Hydrologically Dlstulbe 5000 sq. ft. or More 9A. STORMWATER DATA

SUMMARY

Unit 98. WETLAND DATA

SUMMARY

Total Property Ownership = 92.73 Acres Exislina Welland Acre8118 ,. NIA Hydrologlc Olslurbance = .06146 Acres Waler& of lhe U.S. = !AaMidVfn Walenlhed Area TribUtalY to Oevelopmenl = Acres Isolated Watars of Lake Coonlv = NIA Proposed Impervious Area  : Acres lrmacled Wetland Acreaae  ;; NIA ED;tlrg Impervious tvca. Pnt-1992 = Ams WateraOflha U.S. = NIA Exi5tlng I~ Am Post-1992 Aaes Isolated Waters of Lake CounlY ,. NIA Delenllon Volume Requll8d

  • Acre-It Mllinalfon Renl&nement Ratio = NIA Compensatory Storage Required "' Acre-ft. Ultlaa!ion Amiane Reoult'ed = NIA Oepresslonal  : Acre-ft. Walfll'8 of the U.S. = NIA Riverine 0-to 10-Year = AQ&.ll Isolated Waters of Lake l',mllllv = NIA Riverine 10- lo 100-Year = Acre-ft. On.Siie Olf.Slle ..- NIA NIA Mltlni:ollM Bank = NIA SMC Welland Rastorallon Fund "" NIA 9C. Check box If State (IL) rund& are being used for this development. D 9D. Qleck box If tlis Is a project being funded In part/In whole by an SMC grant? [:J 1

0A. OESCRF110N OF DEVELOPMENT Temporartty beach a barge to transport a Sta~r and Rotor to another power generating station.

108. NAllE Of: DEVELOPMENT 10C. SINGLE FAMILY HOME ONLY Zion Solutions Stator-Rotor Transfer Estimated fUtunt home value:

100. LOCATioH OF DEVELOPMENT 11. LEGAL DESCRIPTION East of Fulton Ave at the end of Shiloh Blvd SW 23 46N 12E

, StruetAddresa 101 Shiloh Blvd, Zion, IL 60099 Y. Section Section Tuwnshlp Range Munlclpalty PIN 04-23-100-006,04-23-100-004 City of Zion (If more than three PIN exlsla fer lfle pro}ecl. please lncilcle on a separa!B attachmenQ Lake Michigan Dead River 42*2&'58.452.N 87"48'0.64"W Watershed SUl>-Watershed Lstilude I:Onglmde

,l 12. UST ALL LOCAL, ST~TE, AHO~ PERMIT APPLICATION, OR ~9!,~~T1MS ~.IBf:!L~~

Pennlt Type t*glonalPermlt11

' - -*- _ * . *.. lssul['Q. Ageng i-u*~~!.~!5-~.E~~--- .... . *-*--**j

_ -l Permit Number 1** ~ ~'!9. ~ .

,.~~*-~-&----*~-- _ * --*-

. Permit Issue Date I I -*... 1 . I -** -*.. *--**. -- *-- . I.

. . .. . .. . . . .. l--**-** . . . --*-- ....I f:lA.. UNOER Pf.NA!.lY OF INTENTIONAL MISREPRESENTA110N ANO/OR Pm.JURY, I declare that I llllve e"'8ll*1ed Md/or made Ilia eppllc:atlon and ii is lru& and correct to Ille best of my lcnoMedge and belief. I agree ID conalruct said development ln compbnce with the penniltad dowmenbl. I reaflZI that the Wonnatton that I have alllrmed hSIVOl'I mns abatl& tir the lssuiince of Ille Walanrhed Development Permil(s) herein~ and approval or plans In connedlon therewith ahall not be conRued lo permit any a>nallucUon upon said premises or 1111 thereof In WilalfonJ.f~ IXO~ of any J~ble ordln .' lo excuse the aNMr or his succaasors In lllle from comgly{ng lhenlwlth.

Pre Construction $ Inspection Deposit,._

t _ _ _ _ _ _ _ __

5 Year Mitigation S - - - - - - - - -

Surety$---- - - - - - - Welland Credit held by _ _ _ _ _ _ _ _ TOTAL SECURITY $

17. FINAL APPROVAL FOR PLANS ENTITLED AND DATED:

Date of Signature Approved ByfTitle PE.#/CWS#

Community Professional Engin1e - * - 1 U - * - - - - - - - - - - - - - - - - - - - - - - - -

Certified Wetland Specia l i s ' i - - - - - - - - - - - - - - - - - - - - - -- -- -

Lake Co. Stormwater Management Commiss=io..n.____________________

EnfurcememOfficer _ _________________________ ~

This permit Is subject to the following conditions:

(a) This permit does not convey title to the permittee or recognize title of the permittee to any submerged or other lands, and furthermore, does not convey, lease or provide any right or rights of occupancy or use of the public or private property on which the project or any part thereof will be located, or otherwise grant to the permittee any right or interest in or to the property, whether the property is owned or possessed by the County of Lake or by any private or public party or parties.

(b) This permit does not release the permittee from liability for damage to persons or property resulting from the work covered by this permit, and does not authorize any injury to private property or invasion of private rights.

(c) This permit does not relieve the permittee of the responsibility to obtain other federal, state or local authorizations required for the construction of the permitted activity: and If the permlttee Is required by law to obtain approval from any federal or state agency to do the work, this permit is not effective until those approvals are obtained.

(d) The permittee shall, at his own expense, remove all temporary piling, cofferdams, false work, and material Incidental to the construction of the project, from the fioodprone area, river, stream or lake In which the work is done.

(e) The execution and details of the work authorized shall be subject to the approval of the SMC. SMC reprasentatives shall have right to access to accomplish this purpose.

(f) Application for permit will be considered full acoeptance by the permittee of the terms and conditions of the permit.

(g) The SMC, In Issuing this permit has relied, upon the statements and representations made by the permittee; if any statement or representation made by the permlttee Is found to be false, the permit may be revoked at the option of the SMC: and when a permit Is revoked all rights of the permittee under the permit are voided.

(h) If the project authorized by this permit is located In or along Lake Michigan or a meandered lake, the permittee and successors shall make no claim whatsoever to any interest in any accretions caused by the project.

(i) In issuing this permit, the SMC does not approve the adequacy of the design or structural strength or the structure or improvement.

0) Noncompliance with the conditions of this permit will be considered grounds for revocation.

(k) If the work permitted is not completed within three years of the permit issuance date, this permit shall be void.

This permit is subject to further special conditions as follows:

PROVIDE PRIOR NOTIFICATION OF THE PRE-CONSTRUCTION MEETING TO SMC (847) 3n-7700 INSPECTOR FIVE WORKING DAYS BEFORE START OF CONSTURCTION TO ENABLE SMC ATTENDANCE.

PROVIDE AS-BUILT PLANS OF THE STORMWATER MANAGEMENT SYSTEM TO SMC PRIOR TO FINAL SEEDING.

Lake County Watersheds D 1 2 3Milea

~---

i.roiRifs~.flf'd L~'-l*

l. Pilll.llllllOr**
  • \~er.

,.,,....0...,..

'Sl_..4'nic .....

7.lt"M"lalic . . .

.. 'f""91,1ilf'Duln t NMC...,

d. Deii ........ ll#a' Wltml>Od
10. Mcalll!.P!:tlOa I\ ,.C#ll 1:a..~~oo t). Wperl)lw,....~

,~ ,.

  • * ~Otri' 16.ltwor O.. ........ " -

!!~*c...

JOINT APPLICATION FORM FOR ILLINOIS ITEMS 1 AND 2 FOR AGENCY USE

1. ApplicatfOn Number 2. Date Received 3 and 4 (SEE SPECIAL INSTRUCTIONS) NAME MAILING ADDRESS Af4D TELEPHONE NUMBERS 3a. Applicant's N11me. 3b Co-Appllca11tJPropertv OWner Name 4. Authorized Agent (an agent if> nol ntqUit&d);

ftf needed or l different from applicant).

Gerard van Noordennen Jedd Anderson Company Name (If any)

  • Company Name (lf any). Company Name (if any)

Zion Solutions, LLC. Chnstophtr B. Burke Engineering, Ltd Address; Address Address*

101 Shiloh Blvd . 9575 W Higgins Rd., Suite 600 Zion, IL 60099 Rosemont, IL 60018 Eman Address: Email Address*

Email Address*

In011Rnnoordennen Jvtlons.OOITI J&dd@cbbel.com Applicanrs Phone Nos. wlarea coda Applicanfs Phone Nos w/area code A;ent's Phone Noa w/area code Business 224-789-4025 Business; Busi11ess: 847-823-0500 Residence* Residence* Residence:

Cell* 86o.462*9707 Cell* CeM: 847-343--7818 Fa>r 224-789-4008 Fax Fax: 847"'823-0520 STATEMENT OF AUTHORIZATION I hereby authorize. Jedd Anderson to act in my behalf as my agent in the processing of thts application and to flJmlsh, upon request. supple1ntal information m sypport of this penrut application .

.~" / .odlDlicaot's __, . , . /J A'l- Gerard van Noordennen May 26, 2016

// dF-J.-*.J.. Date

5. ADJOINING PROPERTY OWNERS (Upstream and Downstream of the water body and withrn Visual Reach of Pro.iect)

Name Ma1llng Address Pnone No w/area code

a. Available upon Request b.
c. i d.
6. PROJECTTITLE:

Zion Solutions Stator-Rotor Transfer 7 PROJECT LOCATION 101 Shlloh Bllld. . Zton, IL 600119 UTMs I LATITUDE "N 42.44957 Northing*

LONGITUDE. -87.80015 "W Easting*

STREET, ROAD, OR OTHER DESCRIPTIVE LOCATION LEGAL QUARTER SECTION TOWNSHIP NO. RANGE DESCRIPT 101 Shiloh Blvd., Zion, IL 60099 SW 23 46N 12E J811N ORD NEAR CITY OF TOWN (check appropriate box) WATERWAY RIVER MILE Munlclpality Name (ff applicable)

Zion Lake Michigan NIA COUNTY STATE ZIP CODE ake IL 60099

!evised 2010

] Corps of Engineers 0 IL Dep't of Natural Resources D IL Environmental Protection D Applicanfs Copy Agency

I. PROJECT DE8C (fnCLLI *I-...):

zton.....,,,UOll .......... UMCE..........,.fara ........... 1t ID___.,.._. ...... illlheZlan..,._ . . ..,...,.. *

.....-.,11111Aa111rlD*..... fDrhMpcllt*_.....,_1n....._.._. ........ ....., ........ udWllgltdllle.,. Alla

.._(119....._, ...... olulloalltll

~1..,.,_pa11111111J.._.dlallla

.............. rd ........

-=*---d~*=11111 llawdl..m~ An**._ ....~...... --....,............................

ilP;:..-:.~-=MIO=rr:=:::::::.:t ..=:.=::~~::".J::-'~1.8:"..:.e:.i::::.::::."::.-.
    • tad!--~

..,................. ._CHWUll_,. Thl .... 11......... llllllsllllopllllrClllli....._~*--Mllat.,.._. . . _._. ....... <<IClll-enfotlle Cllllr'M~itllaw ....... ftl'lllllOtOlll . . ........_ A~ ... IMIW.-to....,_. ...... Mlwl .............. __. .. ....

n. ........-......... 111m .................,......... _._ ............... ,,., ......... .....-onOf....... d . . lilllld. . . llldCHWM.
8. NfO NEED OF PR Transfer Stator..ffotor to another generating station for fub.n use.

COMPLETE THI FOLl.OWU'<<a FOUR BLOCKS IF DREDGED ANDIOR FLL MATERIAL IS TO BE DISCHARGED

10. REASON(&) FOR DISCHARGE:

No Discharge Proposed.

11. E(S) Of :TEA BEING DISCHAROED AND AMOUNT OF EACH nPE IH ~

TYPE: Not Appllcable AMOUNT IN CUBIC YNU>S:

Not Appftcable

12. SURFACE AREA IN ACRES OF OTHER WATERS FLlED (See ~

No ftH proposed wHhln OHWM or \Wttfanda 8880Clated With Lake Michigan 1a DE8CRIPOON OF AVOI :noH rlON (See ~

No fill propQSed within OHWM or wetlands associated with Lake Michigan. The OHWM will be spanned by a batge ramp from upland to barge.

  • 14. Date d\'ftV le pRlpOled lo commenoa Olla .9Clvftr 11...-S to be campleled swmner 2016 11i.. r. .ny partlan ol lhuaMvl~ for 10UUttnowOllqlllWI

"*1orlDllon Is ..

Fall 2018 No x NOTE: I f -.. "YES" gl\18 l8MOl1a In . .

~end Rtmllawllan.

Mordh Md Y*rthe ecMy was NIA hdcll9 lhlt ~wart< on clnlWlnga.

18. LJat IPPl'Wllla or ceialcllGn and denlail ~ hm !llW F;a;r.[ """"818, lbde, orJ~:"Zfar~lllruduntl::::::r.::=,-:con::*=;;::~ndan.== * :-':clldlm:CC::gea:=:<<:'""f other ecMlel delcrlled In Chia applcellan.

JwgtgmcvT 111. APPi tr~ nN VFAIFlt"..A (RFF RPFr.IAI

  • OHR)

Applc:elbl llt hentby mlde for the ecMlel daalbld hlrRI. I aerlf/lhlt In flllllllllrWll Iha l'nfanRatlon conlllned In the tppllc:allan, md 11111 to . .

bell fArny ~Ind beW, such lrdonMllon 11 W.. CQll'lflllt9, ft ....... I MttNlr Cll'IM'ylllt I,__ the~ lo undlltBlm lte.,,.,,,.,.,

?~'P'~*~_"'°--=-.tl---~~2~f;. . &. ,.~;_,___-  ;

Corps Of Engineers IL Oap't d Natural Reaourc11 IL Envlranrrwnllf Prol8dlon Reviled 2010 AgBnat SEE INSTRUCTIONS FOR ADDRESS

e ,____ ...=,

1 inch

  • '°.,..'__.___.___.__.._,"""

1,000 feet STUDY AREA I 1 h ~,;.

~

§ i..~ S1Jurces Esn. HERE, Dt:ilorme, USGS, lntemiai;, increment P Corp,, NRC:AN, E&n Japan , METI, Esn Chrna (Hong Kong). Esn (Tharland), TomTom, 8 Mapmylnt:lia, © OpenStreetMc.p contrlbutor"1, and the GIS User Community

_______:_________________;___::;::;;;;..;:::;.;;.....;..........-T_IT-L-E:------'---'--------'------...;....----------...,..-----...;...~

11--C-Ll-EN_T_

~ C8BEL # 11--0016.00016 2 ZION SOLUTIONS LOCATION MAP DATE: 6/09/16 8

0

~.B CHRISTOPHER B. BURKE ENGINEERING, LTD. OWN. SCALE: 1 "*1,000 '

9575 W. Higgins Road. SUlte 600 *Rosemont, Illinois 60018 * (847) 82~00 1-C:::.H::.:KD:::.*---+~u..-.a....:.;PL:;:o"'-r:::.DA~JE::..:~--=6/9/20=.:.:16___;~

EXH1

PROJECT AREA

,-,* --CORPORATE LIMITS COINCIDENT WITH SHORELINE Lake County Unincorporated Areas 170357

I

.1o .......

~

~

~

lit"'~.JNJ:J

./-.

? .,....,~~-

_.....,....~

/~

~ 4 J ~ll'h~ ...,..,7...,.. -.w~ ., _..,,

~

"~

l *

~ j ~

. . .J I

~~ .>

! ~

l ...,  ;

..... ....,....,.,. (lr.l,jt... ~.....

,AM"** ~

g,' l It

./' J j

... /"

IL

~.

,., ~

""""" ......s Jltl~~*

~

.........  ! .-..*;r~..,.\.'i IL

... ~., .. Yo)

~

  • t*f'fJMM r

~

... ¥*'lr"fN"'J

~ l 5 l

Ii. l l

'f\>IA#OfJ>'lt

~.... I

t t

,...,,."~,,

.... l ................ "wn*~~.

J 1

~ l

+ ............,.,.....

l'**llJI

i ., p:_.AC~ t~" Pl IWOOO :Jf*: TrlF fiEAG 1, i - CC""EP.EC Wrq GEOT~ll; :..f F.A.aR*C, T:-, £~

,. f- LL ,'\RE!\ /IS Sl-'OWN csnv.; Wt.~L -GHr\IJI:. ....

360' TQ '.NC or TUG '.30/\°i 'v crus: 1[~ - Ru~~ LIW. C~I0/11 [ co:*SORMING TO IC AS i M D- : 2~ ~, ~ !'PE. I, CLASS C O~ D.

?. 1.. cc A'-lD ~m.10.Ac-:- 1 ~; s" urs. -o? or 9+ 5C FtN!SHEO PAD C:L.: ~84.21' ESTIMA L i:IL

- P'."Q'D* ~ 0 C*

3. SURv::..*1:.0 WATEP-u:*it. 1:.Lt.'v'AT'ON ~Al<EN ON 5/3/ ' 6 IT.,.. SP/\C[CO, II ~. r IC PRO [CTtD WA~ E.R L~VC:LS FOR OCTOBC.R 2.0' 6 J.~~~ o.e*

113 OF -; i-'!S FlJ VM: O *.

PURPOSE fl WllT1Ell mu::

BARGE ROLL-ON PLAN PROJECT:

ZION GENERATOR TRANSPORT APPROVED BY:

DWG NUMBER 159566-81.0 GENERAL NO'T5:

1. i):~E~SIONS il..~ .'f'?ROl.IMA'rE 7C !:?". '!EFCRE?iCE D<l.l~IO'IS AAE lN "AA?:."llte:SES. STA"10~5 AA£ *oq REfEllE:lc£ ANO AAE l:\OU~:Y..O TO t.~£5T rocr.

2 ~OV'~!:.."U. CQl<.'flC~Jf.~l:l'I, ...'ID :A'YOiJT SllOWil MAY C IL' NC~ JV~ <O S.T

c:t:imo~s /IT TIMF ()" RC . - Of. CC'rrt.cT 9::T :t;cit;l'flt'NC ~KJR -o Jr"'.~*\T*t-.'G REV B

t--t--

A ISSUEC ADDED 1----1----

CUSTOMER: REV NUMBER f ROM Ot.PlCILO 1\ll'W':Cl:.IJL'l l C .-00 Vl I

PSEG-SALEM NUCLEAR  :!. CR011~.IC PROF':.£ TA.'<5~ ~RC>>.t SPilC£CO ~ - 0".A\\',"fG 9l62HSJR Ol , CATE!l B ~l:i!'G.

DRAWN B'f: DESCRIPTION: 1.. coP.EcAs-'s A."£ R:lM U.S. AR'llY CC?."S OF ENCi~ITTS C'!EA"T ..Ai<ES W~TER Lf\U f<R[CASIS.

TJS RAMP & MAmNG PLAN VIEW NOTE:

ALL DISTURBED AREAS SHALL BE RESTORED IMMEDIATELY AFTER TRANSFER OPERATION TO EXISTING CONDITIONS.

-~

NAGEMENT COMMISSION DECI SHALL CORDINATE WITH ZIONSOLUTIONS, LAKE COUNTY STORMWATER, AND US ARMY CORPS OF ENGINEERING REGARDING RESTORATION ACTIVITIES IF REQUIRED.

  • -----------!41 .....

) :ER.0~10~ co~~ROL ~OTI.S D IN Sl:CH A MA.."ll\"ER AS TO :MNIMIZE ER.OSIO~ son.

>ER THE TIME OF YEAR. SITE cmmmoNS A.""ID THE USE S.

_ FEATu"RES SHALL BE C<Dt-STRUCTED PRIOR IO THE

'..BANCE OFl'l'I.A'ID AREAS.

, ITTH m . fPORARY OR ~i..\lli""ENT MEASURES WITHIN 14 Cl'DROl.OGIC DISTURBA.~CE. OR REDIS'rr"llBA.11.;CE.

S GREATER THA..~ OR EQl:AL TO 3H.1V. AND APPROVED L BE STABlIJZED \\"ITH !)OD. MA.I OR B~"XET 1'l REQUIRED O~ All DITERIOR DETThlIO~ BAS~ SIDE

ATTACHMENT 1 Completed Joint Application Form

JOINT APPLICATION FORM FOR ILLINOIS ITEMS 1 AND 2 FOR AGENCY USE

1. Applfcalion Number 2 Date Received
3. and 4. CSEE SPECIAL INSTRUCTJONS} NAME. MAILING ADDRESS AND TELEPHONE NUMBERS 3a Applicant's Name 3b Co-AppllcanUProperty ~118r Name 4. Authorized Agent (an agent is not requft8d);

(if needed or if different fre>m applicant):

Gerard van Noordennen Jedd Anderson Company Name (If any) : Company Name (if anY): Company Name (If any)'

l.ion Solutions, LLC. ChristopherB. BW'ke Engineering, Ltd Address. Addl"l!S$. Addrus; 101 Shiloh Blvd. 9575 W. Higgins Rd., Suite 600 Zion, IL 60099 Rosemont, IL 60018 Email Address: Email Addies1r Email Address; aovannooraennenftenerovsolLJbons COfTl jedd@obbel.com App~nl's Phone NO$ w/area code Applicant's Phone Nos. w/area ~ Ag&nt's Phone Noa w/area code Bustness 224-789-4025 Business: Busi11ess: 847.S23-0500 Residence: Residence Residence:

Cell* 86().452..g707 Cell Cell: 847-343-7a18 Fax* 224-789-4008 Fax Fax- 847-823-0520 STATEMENT OF AUTHORIZA 110N I hereby auttx>nze, Jedd Anderson to act in my behalf as my agent in the processing of th* application and to fumtSh, upon request, supple~1ntal information in gvpport of this permit appbcation

,,i1 ( -. -~ /.) .,/1f-. Gerard van Noordennen May 26, 2016

// ldi~icant'S SfOrt.alllftj Date

5. ADJOJNn'llG PROPERTY O'IJNERS {Upstream and DownstTeam of the water body and within Visual Reach of Project)

Name Marling Address Phone No wt-area code

a. Available upon Request b.

c.

d.

6. PROJECT TITLE:

Zion Solutions Stator-Rotor Transfer 7 PROJECT LOCATION*

101 Shiloh Bllld , Z10.1, IL 60099 UTMs LATITUDE.

42.44957 ON Norttung*

LONGITUDE. -87.800*15 ow Easting:

STREET, ROAD, OP. OTHER DESCRIPTIVE LOCATION LEGAL QUARTER SECTION TOWNSHIP NO. RANGE DESCRIPT 101 Shiloh Blvd .* Zion, IL 60099 SW 23 46N 12E 181 IN OR U NEAR CITY OF TOWN (check appropriate box) WATERWAY RIVER MILE Municipality Name (If appllCSble)

Zion Lake Michigan NIA COUNTY STATE ZIP CODE ake IL 60099

~2010

] Corps ot Engineers 0 IL Dep't of Natural Resources D IL Environmental Protection D App~cant's Copy Agency

8. PR AIP110N ( m al faaUes): *** =

......, ...... to ..--..1w~

.................. nol......

............. 1n . . . . ,_,.....-. ........ °""'..............

ZlolltillDN. UOll ......... UIAC& ............ b' * ......,,._.11111.....-llllldl* .... .tllleZlan...._ ... IDIMlllllr*81mr(llt.....,lllllbdmnlllcldo Of . . 8111DOAD1Dr(>1--.-....0IDl'tllllllia n...-.a ........ d11111H1111 ..... 111 . ..._lllllm.,__ ftaalMltllllllllll .... '*""'1111411 _ _..., . . . . ........._"" . . . .""*ID*.,i.m

....., ***l)llllllh ... "*-illllrwelhl.,...,lfFWilllrMllllof............. (OHWMI...,. .................. " . ,... M ..........Gf.IHllC-*ad*

fWCA ................................ tl .......................,. . . . . . . . . . UAllld_CQHMI). "lllt* I ll'lab_.lllln .. l'allld1111D ...... ....

1Ngltllllhtlllr~

ND~Ol- ...... OHWlolll.-,. llla .... ll........ llldlt....,_,Cllll'-....... lllMG*--~=---..

.._._,tollllll'~...ihllllg._ ........

n....._.*G'IMlil*(llllll'"'*"plln'911Wllld* ...............

A ...... dllellllllto ........ fle.._Ml_IGllDllw--dllala..-.ai-s.

.... cir . . . _n<<llt ltle..._ll'lftaloca..,,..... ,___...ll*Mllllanol. ..._111. . ....,_llldCJIHMl

8. PU NEED OF PROJECT:

Transfer stator-Rotor to another generating staUon for future use.

11. TVPE(S) OF MATERJAL BEING DISCHARGED AND THE TYPE: Not Applicable AMOUNT IN CUBIC YARDS:

Not Apptlcable

12. SURFACE NACRES OFVETI.AND8 OR OTHER WATERS Fil.ED (8ee No ftJI proposed within OHWM or weU&nda 88BOcfa:ted with Lake Michigan 3 OF AVODANCE, M (8118 ~

No ftll propQSed within OHWM or wetlands associated wJth Lake Michigan. The OHWM wll be spamed by a barge ramp from upland to barge.

11i. lnny parlan of llCIMty llDrMllGtu II Va IOUllhl nowoamplll87 Monlh and Yearthe~wu NIA hloldelledaf.lrVworkond~

11. Uat ..-~;:C9lllcalon mddali8ll reottWd '-1 Cllf9 Fed11'111, hdllrlllda, llabt, orbit......... b 1trut*lr91, CGnllndan, dldagel ar o111er ...... dwrbld 1n au ..,,....on.
17. CON&EHT TO NTER PROFERTY Corpe Of Englnura L nvfromnll1llll Prutactlon Revised 2010 ~

SEE INSTRUCTIONS FOR ADDRESS

-- 1 ATTACHMENT2 IDNR EcoCAT Consultation, Initial Review

Eco~CAT Ecofoaicgl Complicmct Asleument Tool I Applicant: Christopher B. Burke Egineering, Ltd. - Rosemont IDNR Project Number: 1610258

Contact:

Jedd Anderson Date: 05/03/2016 Address: 9575 W. Higgins Road, #600 Rosemont, IL 60018 Project: Zion Solutions Address: 101 Shiloh Blvd., Zion

Description:

The project consist of beaching a barge on the shore of Lake Michigan and loading material on it, for transport to another site.

Natural Resource Review Results The Illinois Natural Heritage Database shows the following protected resources may be in the vicinity of the project location:

Illinois Beach INAI Site Illinois Dunes North INAI Site North Dunes Nature Preserve Bearberry (Arctostaphylos uva-ursi)

Blanding's Turtle (Emydoidea blandingii)

Common Bog Arrow Grass (Triglochin maritima)

Downy Yellow Painted Cup (Castilleja sessi/iflora)

Dune Willow (Salix syrtico/a)

False Asphodel (Tofieldia glutinosa)

Few-Flowered Spikerush (Eleocharis pauciflora)

Kalm 's St. John's Wort (Hypericum kalmianum)

Least Bittern (lxobrychus exilis)

Little Green Sedge (Carex viridu/a)

Marram Grass (Ammophila breviligulata) .

Pale False Foxglove (Agalinis skinneriana)

Redveined Prairie Leafhopper (Aflexia rubranura)

Richardson's Rush (Juncus alpinoarticulatus)

Sea Rocket (Cakile edentula)

Seaside Spurge (Chamaesyce po/ygonifolia)

Trailing Juniper (Juniperus horizontalis)

Tubercled Orchid (Platanthera flava var. herbiola)

An IDNR staff member will evaluate this information and contact you to request addltlonal information or to terminate consultation if adverse effects are unlikely.

Location The applicant is responsible for the accuracy of the location submitted for the project.

County: Lake Township, Range, Section:

46N, 12E, 23 Page 1 of 2

/DNR Project Number: 1610258 IL Department of Natural Resources Government Jurisdiction Contact U.S. Army Corps of Engineers Nathan Grider 217-785-5500 Division of Ecosystems & Environment Disclaimer The Illinois Natural Heritage Database cannot provide a conclusive statement on the presence, absence, or condition of natural resources in Illinois. This review reflects the information existing in the Database at the time of this inquiry, and should not be regarded as a final statement on the site being considered, nor should it be a substitute for detailed site surveys or field surveys required for environmental assessments. If additional protected resources are encountered during the project's implementation, compliance with applicable statutes and regulations is required.

Terms of Use By using this website, you acknowledge that you have read and agree to these terms. These terms may be revised by IDNR as necessary. If you continue to use the EcoCAT application after we post changes to these terms, it will mean that you accept such changes. If at any time you do not accept the Terms of Use, you may not continue to use the website.

1. The IDNR EcoCAT website was developed so that units of local government, state agencies and the public could request information or begin natural resource consultations on-line for the Illinois Endangered Species Protection Act, Illinois Natural Areas Preservation Act, and Illinois lnteragency Wetland Policy Act. EcoCAT uses databases, Geographic Information System mapping, and a set of programmed decision rules to determine if proposed actions are in the vicinity of protected natural resources. By indicating your agreement to the Terms of Use for this application, you warrant that you will not use this web site for any other purpose.
2. Unauthorized attempts to upload, download, or change information on this website are strictly prohibited and may be punishable under the Computer Fraud and Abuse Act of 1986 and/or the National Information Infrastructure Protection Act.
3. IDNR reserves the right to enhance, modify, alter, or suspend the website at any time without notice, or to terminate or restrict access.

Security EcoCAT operates on a state. of Illinois computer system. We may use software to monitor traffic and to identify unauthorized attempts to upload, download, or change information, to cause harm or otherwise to damage this site. Unauthorized attempts to upload, download, or change information on this server is strictly prohibited by law.

Unauthorized use, tampering with or modification of this system, including supporting hardware or software, may subject the violator to criminal and civil penalties. In the event of unauthorized intrusion, all relevant information regarding possible violation of law may be provided to law enforcement officials.

Privacy EcoCAT generates a public record subject to disclosure under the Freedom of Information Act. Otherwise, IDNR uses the information submitted to EcoCAT solely for internal tracking purposes.

Page 2 of 2

ATTACHMENT 3 Completed USFWS Section 7 Review by CBBEL

MEMORANDUM May 9, 2016 TO: Project File FROM: Jedd Anderson

SUBJECT:

USFWS Threatened and Endangered Species Evaluation - Zion Solutions, Zion, Lake County, Illinois (CBBEL Project No. 110016.00018)

We have completed an evaluation of the proposed project in regards to federal listed threatened and endangered species based on the current USFWS process. The USFWS has implemented an Online Process for the completion of threatened and endangered species reviews for projects. Based on review and completion of their new process and the findings of IDNR regarding the potential impact to threatened or endangered species, in our opinion this project will have "no effect" and consultation is concluded.

Li sted S;oec1es Northern long-eared bat Proposed as Hibernates in caves and mines -swarming i n Myotis septentrionalls Endangered surrounding wooded areas in autumn. Roosts and forages in upland forests and woods.

Piping plover Endangered Wide, open, sandy beaches with very little grass or other Charadrius melodus veRetation Piping plover Critical Habitat Wide, open, sandy beaches with very liWe grass or other Charadrius melodus vegetation Rufa Red knot Threatened Only actions that occur along coastal areas or large Calidris canutus rufa wetland complexes during migratory window of May 1 -

Seotember 30 Eastern massasauga Sistrurus Candidate Graminoid dominated pl ant communities (fens, sedge catenatus meadows, pea ti ands, wet prairies, open woodlands , and shrublands)

Karner blue butterfly Endangered Pine barrens and oak savannas on sandy soils and Lycaeides melis sa samuelis ) containing wi ld lupines (Lupinus perennis ), the only known food plant of the larvae Eastern prairie fringed orchid Threatened Moderate to high quality wetlands, sedge meadow, Platanthera leuccphaeo marsh, and mesic to wet prairie Pitcher's thistle Threatened Lakeshore dunes Cirsium pitcheri Species Listing and Evaluatlon Northern Long Eared Bat- No suitable habitat exists at this site.

Piping Plover - This project is located on the beach of Lake Michigan outside of the critical habitat area of the Plover. The area of temporary impact to the beach is minimal and covers a very small surface area of +/- 0.2 acres. The project will be completed well outside the CHRISTOPHER B. BURKE ENGINEERING, LTD.

  • N:IZION\110016.00018\Env\Docs\USFWS T&E No Effect 050916 jma.docx

MEMORANDUM Plovers nesting season, and being a mobile species live heathy individuals will be able to avoid the temporary work site.

Rufa Red Knot - This project is located on the beach of Lake Michigan. The area of temporary impact to the beach is minimal and covers a very small surface area of +/- 0.2 acres. The project will be completed well outside the Red Knots migration through Illinois, and being a mobile species live heathy individuals will be able to avoid the temporary work site.

Eastern Massasauga - This project does not contain suitable habitat for this species and is not known to occur within this area of Lake County.

Karner Blue Butterfly - This project site does not contain pine barrens and oak savannas on sandy soils that contain wild lupines (Lupinus perennis), and therefore this species is unlikely to occur on this property.

Eastern prairie fringed orchid - The locations of the Eastern prairie fringed orchid are well known in the region, there have been none identified within these isolated study areas based on several detailed botanical surveys completed and none of the onsite habitat currently, therefore this species is not expected to be present or affected.

Pitcher's Thistle - According to the USFWS website Pitcher's thistle "was extirpated from Illinois but has been reintroduced in Lake County". A floristic inventory of the site found no thistles within the 0.4 acre study area.

Conclusion Given that the impact is temporary, limited in area, and located in a area significant disturbed by human activity, and based on our field visits to the site, and intent to assess the area prior to commence of work, we have determined that the project will have "no effect" on listed or candidate species, their habitats, or proposed or designated critical habitat.

CHRISTOPHER B. BURKE ENGINEERING, LTD.

N:IZION\110016.00018\Env\Docs\USFWS T&E No Effect 050916 jma.docx

ATTACHMENT 4 Engineering Plans with Construction Sequencing

STA. 10+00 IS LOCATED a.. 3'-

AT THE EAST FACE OF THE SHEET PILING CAP BCF I wr.

B/f L 18C 2'-7" I I \

I I SHORELINE

\ _ (MAY 3, 2*

9+70 9+80 9+90 10+00 1o+1 o 10+20 1o+3o 10+40 1o+5o 10+60 1o+10 10+80 10+90 111+00 11+10 OCTOBER :

EDGE WATER THIS ELEV1 STA. 10+96 FILL AREA AS SHOWN USING WELL -

CONFORMING TO ASTM 0-1241, TYF r

STA. 10+00 IS LOCATED PLACE AND COMPACT IN 6" LIFTS.

r AT THE EAST FACE OF REMOVE 4'H x 30'W THE SHEET PILING CAP MATERIAL TO BE INSTALLED OVER GI EXISTING PROFILE AT PROPOSED TEMP. PURPOSES.

SECTION FROM SHEET PILE RETAINING WALL I TEMP ROADWAY ROADWAY PROFILE TOP OF FINISHED PAD EL.: 584.21' ESTIMATED FILL REQ'D: 20 CY OT 7.4 EL. 587.0' I - - (46' - 10") - -

I 1

9+50 9+60 9+70 9+80 9+90 10lao 10+10 EST. CUT: 100 CY 10+2~°J 10+30 10+60 10+70 10+80 1 10+90 111+00

r: ~ lf) 0::: <.O

(.')O::: CO WO"l 5 SHOWN ARE TO BE s:~ + ':;;(+

0 3: ~

I.REA WILL BE RESTORED TO ITS ci 0:::

o:::w. w .

>N UPON PROJECT QI-~ (.')~

~ (/) 8 (fJ l._IREV_f"-'-1_ _ _ _ _ _R _EV1S

_ 1o_Ns_ _ _ _ ___.__0,t;_n:__.j.._REV_.ev___..lc_H_K_BY__,:lj THIS oocullENI' tS 1llE PROPERTY"' - CIW4!: NG RIClGINIO. lltS DOC1ME11T jTITlE: _. -~~

ATTACHMENTS Wetland I Water Assessment

Cl

  • Bl*

CHRISTOPHER B. BURKE ENGINEERING, LTD.

9575 West Higgins Road Suite 600 Rosemont, llllnols 60018 TEL (847) 823-0500 FAX (847) 823-0520 May 9, 2016 Zion Solutions, LLC 101 Shiloh Boulevard Zion, Illinois 60099 Attention: Darlene Murphy

Subject:

Wetland/Waters Assessment of the Zion Solutions, LLC Stator-Rotor Roll-On Site, Zion, Lake County, Illinois (CBBEL Project No. 110016.00018)

Dear Ms. Murphy:

As requested, on May 5, 2016 Christopher B. Burke Engineering, Ltd. (CBBEL) completed a weUand assessment of the Stator-Rotor Roll-on site. This report was prepared to document our findings.

The study area is located east of Shiloh Boulevard within the Zion Solutions property in Zion, Lake County, Illinois, as shown on the attached Exhibits. Within the study area Lake Michigan was delineated as a waters of the United States. No wetlands were identified adjacent to the lake within the study area. The delineation was completed in accordance with the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Midwest Region (October 2010). The waters limits are shown on Exhibit 7. Information collected on site is listed In the attached data forms.

METHODOLOGY The Regional Supplement to the Corps of Engineers Wetland Delineation Manual:

Midwest Region (October 2010), identifies the mandatory technical criteria for wetland Identification. The three essential characteristics of a jurisdictional wetland are hydrophytic vegetation, hydrlc soils and wetland hydrology as described below:*

Hydrophvtic Vegetation: The hydrophytic vegetation criterion Is based on a separation of plants into five basic groups:

1. Obligate wetland plants (OBL) almost always occur (estimated probability >99%)

in wetlands under natural conditions; Christopher B. Burke Engineering, Ltd . Zion Solutions, LLC 1

2. Facultatlve wetland plants (FACW) usually occur in wetlands (estimated probability 67-99%), but occasionally are found in non-wetlands;
3. Facultatlve plants (FAC) are equally likely to occur in wetlands or non-wetlands (estimated probability 34-66%);
4. Facultative upland plants (FACU) usually occur in non-wetlands {estimated probability 67-99%), but occasionally are found in wetlands: and
5. Obligate upland plants (UPL) almost always occur (estimated probability >99%)

in non-wetlands under natural conditions.

Three procedures completed in the following order are used to determine if hydrophytic vegetation Is present:

1. Rapid Test: The Rapid Test for hydrophytic vegetation is met if all dominant species across all strata are OBL or FACW, or a combination of the two based on a visual assessment.
2. Dominance Test: Using the 50/20 Rule, if greater than 50% of the plants present are FAC, FACW, or OBL, the subject area meets the hydrophytic vegetation criterion.
3. Prevalence Index: Each plant species in a sampling plot Is assigned a numeric value (OBL=1; FACW=2; FAC=3; FACU=4; UPL=5). Based on the sampling data, the absolute cover is calculated for each species In each stratum and using the specified formula, if the Prevalence Index Is 3 or less, hydrophytlc vegetation is present.
4. Mnrphnlonical Adaptations: Various species may develop physical characteristic$

after growing in wetland areas such as multi-stemmed trunks, shallow roots and buttressed stems. Hydrophytic vegetation is present if an adaptation is observed in more than 50% of FACU species growing in an area that contains hydric soil and wetland hydrology.

Hvdrlc Soils: Hydric soils are defined in the manual as 11soils that are saturated, flooded or ponded long enough during the growing season to develop anaerobic conditions in the upper part." Field indicators of hydrlc soil are found in the NTCHS Field Indicators of Hydric Soils in the United States (USDA Natural Resources Conservation Service 2006b or current version).

Wetland Hydrology: The wetland hydrology criterion is often the most difficult to determine. Typically, the presence of water for a portion of the growing season creates anaerobic conditions. Anaerobic conditions lead to the prevalence of wetland plants.

Morphological adaptations of plants, driftlines and watermarks are examples of wetland hydrology field indicators.

Christopher B. Burke Engineering, Ltd. Zion Solutions, LLC 2

RESULTS AND DISCUSSION STUDY AREA The study area contains an existing gravel parking lot and a portion of the beach of Lake Michigan, as shown on the attached Exhibits. The study area, characterized at data points 1B and 28, is east of the Shiloh Blvd terminus. No *A" points were taken as no wetlands exist within the study area. Two data points were taken because a sheet pile bulkhead wall separates the beach from the east side of the parking lot.

The vegetated portion of the study area adjacent to Lake Michigan was dominated by beach grass (Ammophlla brevlllgulata). A few specimens of wormwood {Artemisia vulgaris), sand dune willow (Salix cordata), Queen Anne's lace (Daucus carota), Panic grass (Panicum vlrgatum) and cottonwood saplings (Populus deltoides) were found within the study area. The substrate in the vegetated areas consisted of beach sand.

No wetland areas were identified within the study area. The Corps of Engineers identifies the Lake Michigan Ordinary High Water Mark/jurisdictional limit to be at elevation 581.5.

REFERENCE MATERJALS The following reference materials were reviewed and used to assist in the wetland field reconnaissance. They are included as Exhibits 1-6.

LOCATION The study area is located east of Shiloh Boulevard terminus in Zion, Lake County, Illinois (Exhibit 1). Geographically, the study area is located In Section 23, Township 46 North, Range 12, and East of the Third Principal Meridian. The latitude and longitude for the project site Is 42.449565"N; -87.800148°W. Study area boundaries were established during a field walk down, with Zion Solutions staff.

NATIONAL WETLAND INVENTORY The National Wetland Inventory map (NWI), Zion Quadrangle (1983), indicates no wetlands are mapped within the study area (Exhibit 2). The NWI serves only as a large-scale guide and actual wetland locations and types often vary from that mapped. The following was mapped within the Study Area:

L1UBH - Lacustrine, Unconsolidated Bottom, Permanently Flooded LAKE COUNTY WETLAND INVENTORY The Lake County Wetland Inventory map (LCWI) and Advanced Identification map (ADID), Benton and Zion Townships {1993), indicates mapped wetland within the project Christopher B. Burke Engineering, Ltd. Zion Solutions, LLC 3

area (Exhibit 3). The LCWI serves as a large-scale guide and actual wetland locations often vary from that mapped.

SOIL SURVEY The Soil Survey of Lake County, Illinois (2001), was reviewed to determine the location of hydric soils within the study area (Exhibit 4). Mapped hydric soil can be indicative of wetland conditions. The following soil was mapped within the study area:

367 - Beach Sand UNITED STATES GEOLOGICAL SURVEY The United States Geological Survey (USGS), Zion Quadrangle (1993), was reviewed to determine historic local drainage patterns (Exhibit 5). The USGS indicates that the study area drains to Lake Michigan.

FLOOD INSURANCE RATE MAP The Flood Insurance Rate Map (FIRM) for Lake County, Illinois and Incorporated Areas, Map Numbers 17097C0085K (effective September 18, 2013), was reviewed to determine the location of regulatory floodplain on the site (Exhibit 6). The presence of floodplain can be indicative of wetland hydrology. The FIRM indicates that there is mapped 100-year regulatory floodplain located within the study area associated with Lake Michigan.

Any questions regarding this report should be directed to Jedd Anderson.

Sincerely,

~~~~

Jedd Anderson, PWS, LC-CWS, CPESC, DECI Vice President Head, Environmental Resources Department N:IZION\110016.000161Env\Docs\Wet0el050916.doc Christopher 8. Burke Engineering, Ltd. Zion Solutions, LLC 4

  • .___._~.___,___....'"~m~.___,___..____~"*

e -*

1 Inch= 1,000 feet STUDY AREA

"" 11 t ~* h'~ r Sources Esn. HERE. Delorme. USGS , lntermap , increment P Corp, lllRCAN, Esr1 Japan. MET! . Esn Ch111a (Hong Kong). Esn (Tha~and) . Mapmylndla, Cl OpenStreetMap contnbutors , and the GIS User Communty CLIENT: TITLE :

CBBEL t 11-0015.00011 ZION SOLUTIONS LOCATION MAP DATE: 412111&

le CHRISTOPHER 8. BURKE ENGINEERING, LTD.

9575 W. Higgins Road, Suite 600

  • Rosemont, Jlllnols 60018 * (847) 823-0500 OWN .

D KEK MA SCALE:

PLOT DATI! :

1100" .0GO 11 LOC 1 **1 .000 .

5111201&

EXH 1

NOTE: TAKEN FROM THE NATIONAL WE TLAND INVENTORY(NWI), ZION QUADRANGLE(1983) wmtQ L1UBH - LACUSTRINE, UMNETIC, UNCONSOLIDATED BOTTOM, PERMANENTLY FLOODED 1 Inch

= 150 feet CDpynght near"!ap 2015' CLIENT: TITLE:

NATIONAL C:BBEL t 11-0011.00011 ZION SOLUTIONS WETLAND INVENTORY DATE: 4121111 le CHRISTOPHER B. BURKE ENGINEERING, LTD. SCALE: 1 "= 150 '

9575 W. Higgins Road, Suite 600

  • Rosemont. Illinois 60018 * (847) 823-0500 1-'c=iJ.Ql~-+-:!!!.O....l'-----L.:.:..:PL:::::o.:.;T0:::;A~TE:.:..:....1...__::51912:::::.::0.:::11_-1 EXH2

NOTE: TAKEN FRO~ THE LAKE COUNTY WETLAND INVENTORY(LCWI), BENTON TOWNSHIP(2001)

Legend WETLAND CLIENT: TITLE :

LAKE COUNTY CBBEL t 11*0011.00018 ZION SOLUTIONS ~TE : 4121/1e WETLAND INVENTORY le CHRISTOPHER B. BURKE ENGINEERING. LTD.

9575 W. Higgins Road, Suite 600 *Rosemont, Illinois 60018 * (847) 823-0500 D'o\fl .

i.;CH=Ko"'" . _

KEK

"~ ..1..

.~

SCALE: 1"= 150 '

-"-**-'*...:.:.;;:~~:.:..T.=~;:.::TE;.;.:_._--=-51912=01:.::.e_ - 1 EXH3

NOTE: TAKEN FROM THE SOIL SURVEY OF LAKE COUNTY, LLINOIS(2001)

~

e a'----'--___.____.___'..____,_'"___.__.____,*

1 inch '"'

1 50 feet 367 - BEACH SAND 8398- UDIPSAMMENTS COMPLEX, UNDUALTING Copyn_9ht nearm.a p_2015*

CLIENT: TITLE:

CBBEL t 1HXJ 18.00011 ZION SOLUTIONS SOIL SURVEY DATE: .i21111 le EXH4

NOTE: TAKEN FROM THE UNITED STATES GEOLOGICAL SURVEY (USGS), ZION QUADRANGLE(1993) e

  • ~_..___._ __ _.__'~*" _.___.'--_.__--1 1 Inch
  • 1,000 feet

~"

STUDY AREA nt TITLE:

UNITED STATES CSBEL

  • 11*0011.00018 ZION SOLUTIONS OA lE: 4121111 GEOLOGICAL SURVEY CHRISTOPHER B. BURKE ENGINEERING, LTD. 1 *
  • 1 .000
  • EXH 5 9575 W. Hl99lns Road, Suite 600 *Rosemont, Illinois 60018 * (847) 823-0500 l-kll~---+..i!illJ.U....-J...!:!~~c:......JL.-~ .:::"~o1:.:.*_~

5111

NOTE: TAKEN FROM THE FLOOD INSURANCE RATE MAP(FIRM), LAKE COUNTY ANO INCORPORATED AREAS, ILLINOIS, MAP NUMBER 17097C0085K, EFFECTIVE DATE : SEPTEMBER 18, 2013 1 inch

  • -*=150 feet Legend 100 YEAR FLOODPLAIN Copyright nearQ:lllp 2015 CLIENT: TITLE:

CBBEL # 11*0011.00011 ZION SOLUTIONS FLOOD INSURANCE RATE MAP [)lo.TE: 4121110 le CHRISTOPHER B. BURKE ENGINEERING, LTD.

9575 W. Higgins Road. Suite 600

  • Rosemont, IUlnols 60018 * (84 7) 823-<1500 SCALE:

1-c,..H=---t-=l...L--....:..:Pl:=.oT""'[)lo.=TE"'-

1*- 150*

_.___.::M.:::112::..:co1:..:;e_--1 EXH6

110 NOTE: AERIAL PHOTOGRAPH TAKEN FROM NEARMAP, DATED : FEBRUARY 4, 2016 1 inch = 1 50 feet APPROXIMATE ORDINARY HIGH WATER TITLE:

APPROXIMATE CBBEL # 11-0018.00011 ZION SOLUTIONS DATE: 4121111 WETLAND DELINEATION CHRISTOPHER B. BURKE ENGINEERING. LTD. OWN . KEK SCALE: 1'= 150 ' EXH 7

. --1-""'.M~A..1-----1...:..P::,::LO;.:...T:;;°":.:.:TE:.:..

9575 W. Higgins Road, Sulle 600

  • Rosemont. Illinois 60018 * (847) 823-0500 1-'c..,,H,..KD"-  : ....1..........:::.s11112=01:::,e-~

r1<.E NA I/le: 110010." 1!J.\llD

WETLAND DETERMINATION DATA FORM - Midwest Region Project/Site: Stator Rotor Roll on City/County: _ _ _ _ _ L_ak_e____ Sampling Date: _ _ _ 05_1_0_51_2_0_1s___

Applicant/Owner: _Z_io_n_s_oi_u_u_on_s_._L_L_c_ _ _ _ _ _ _ _ _ _ _ _ State: _____1_L_ _ _ _ Sampling Point: 1B lnvestigator{s): _J_e_dd_A_n_de_rs_on_________ _ _ _ _ _ Section, Township, Range: _ _ _ _ s_e_c._2_3_._T_4_6_N_._R_1_2_E_ _ __

Landform (hillslope, terrace, etc.): Slope Local relief (concave, convex, none): Convex SI ope(%): 0% Lat:


42.449565 Long: -87.800148 So ii Map Unit Name: _B_e_a_c_h_S_a_nd_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NWI Classification: ______N_o_t_A...

Datum:


WGS84 p"""pl_ica_b_le_ _ __

Are ciimatic/hydrologic conditions of the site typical for this time of the year? Y (If no, explain in remarks)

Are vegetation , soil , or hydrology significantly disturbed?

Are vegetation

  • soil
  • or hydrology naturally problematic? Are "normal circumstances" present? No

SUMMARY

OF FINDINGS (If needed, explain any answers in remarks.)

Hydrophytic vegetation present? N Hydric soil present?

---N Is the sampled area within a wetland? N Wetland hydrology present?

N If yes, optional wetland site ID:

Remarks: (Explain alternative procedures here or in a separate report.)

VEGETATION - Use scientific names of plants.

Absolute Dominant Indicator Dominance Test Worksheet T!ll!il Stratum (Plot size: )  % Cover Species Sta us Number of Dominant Species 1 that are OBL, FACW, or FAC: 0 (A) 2 Total Number of Dominant 3 Species Across all Strata: 1 (8) 4 Percent of Dominant Species 5 that are OBL, FACW, or FAC: 0.00% (NB) 0 =Total Cover Sa12ling/Shrub stratum (Plot size: 15 ) Prevalence Index Worksheet 1 Salix e-0rdata 1 FAC Total% Cover of:

08L species 0 x1 = 0 2

3 FACW species

--- 0 x2=

--- 0 FAC species

--- 1 x3 =

--- 3 4

FACU species

--- 0 x4=


0 5

1 =Total Cover UPL species


91 x5=

--- 455 (Plot size: 5 ) Column totals 92

--- 458 (8)

Herb stratum 1 Ammophila brevHigulata 90 y UPL Prevalence Index = BIA =

(A) 4.98 2 Daucus carota 1 N UPL 3 Hydrophytic Vegetation Indicators:

4

-- Rapid test for hydrophytic vegetation Dominance test is >50%

5

- - Prevalence index is S3.0*

6 7

8 Morphogical adaptations* (provide supporting 9 data in Remarks or on a separate sheet) 10

=Total Cover Problematic hydrophytic vegetation* (explain)

Wood'i. 'i.iOi! ~!ratum (Plot size: 30 )

91

--*indicators of hydric soil and wetiand hydrology must be 1 present, unless disturbed or problematic 2 Hydrophytic 0 =Total Cover vegetation present? N Remarks: (Include photo numbers here or on a separate sheet)

Beach grass is dominate vegetation US Amy Corps of Engineers Midwest Region

SOIL Sampling Point: 1B Profile

Description:

(Describe to the depth needed to document the indicator or confirm the absence of Indicators.)

Depth Matrix Redox Features (Inches) Color (moist)  % Color (moist)  % Type* Loe** Texture Remarks 0-21 NIA Beach Sand Beach Sand

  • Type: C =Concentration, D = Depletion, RM = Reduced Matrix, MS = Masked Sand Grains. =
    • Location: PL Pore Lining, M = Matrix Hydrlc Soll Indicators: Indicators for Problematic Hydric Soils:

Histisol (A1) Sandy Gleyed Matrix (S4) Coast Prairie Redox (A16) (LRR K, L, R)

-- Histic Epipedon (A2) -- Sandy Redox (SS) -- Dark Surface (S7) (LRR K, L)

Black Histic (A3)

Hydrogen Sulfide (A4) --

Stripped Matrix (S6)

Loamy Mucky Mineral (F1) - 5 cm Mucky Peat or Peat (S3) (LRR K, L, R)

Iron-Manganese Masses (F12) (LRR K, L, R)

-- Stratified Layers (AS) Loamy Gleyed Matrix (F2) -- Very Shallow Dark Surface (TF12)

-- 2 cm Muck (A10) -- Depleted Matrix (F3) -- Other (explain in remarks)

-- Depleted Below Dark Surface (A 11) -- Redox Dari<: Surface (F6) --

-- Thick Dark Surface (A12) -- Depleted Dark Surface (F7)

-- Sandy Mucky Mineral (S1) -- Redox Depressions (FB)

  • Indicators of hydrophytic vegetation and weltand

-- 5 cm Mucky Peat or Peat (S3) -- hydrology must be present, unless disturbed or problematic Restrictive Layer (If observed):

Type: None Hydric soil present? N Depth (inches):

Remarks:

Beach Sand HYDROLOGY Wetland Hydrology Indicators:

Prima!Y Indicators (minimum of one is reguired; check all that ai;ii;il~) Seconda!)'. Indicators (minimum of two reguiredl Surface Water (A 1) Aquatic Fauna (813) Surface Soil Cracks (86)

- High Water Table (A2) - True Aquatic Plants (814)

- Drainage Patterns (810)

- Saturation (A3) -- Hydrogen Sulfide Odor (C1) - Dry-Season Water Table (C2)

-water Marks (81) -- Oxidized Rhizospheres on Living Roots -- Crayfish Burrows {CS)

(C3)

Sediment Deposits (82)

Drift Deposits (83)

-- Presence of Reduced Iron (C4) -- Saturation Visible on Aerial Imagery (C9)

Stunted or Stressed Plants {D1)

- Algal Mat or Crust (84) -- Recent Iron Reduction in Tilled Soils

- Geomorphic Position (02)

(C6) - FAG-Neutral Test (DS)

Iron Deposits (85)

Inundation Visible on Aerial Imagery (67) -- Thin Muck Surface (C7) --

- Sparsely Vegetated Concave Surface (68) -- Gauge or Well Data {D9)

=Water-Stained leaves (89) -- Other (Explain in Remarks)

Field Observations:

Surface water present? Yes No x Depth (inches): Wetland Water table present? Yes No x Depth (inches): hydrology Saturation present? Yes No :x Depth (inches): 21 1* present? N (includes capillary fringe)

Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:

None available Remarks:

Depressional wet prairie/emergent wetland US Army Corps of Engineers Midwest Region

WETLAND DETERMINATION DATA FORM - Midwest Region ProjecVSite: Stator Rotor Roll on ApplicanVOwner: _z_io_n_s_o_l_ut_io_n_s_,_LL_c_ _ _ _ _ _ _ _ _ __

City/County:


~

St ate:

Lake Sampling Date:

_ _ _ _l_L_ _ _ _ Sampling Point: ---------

05/05/2016 2B lnvestigator(s): _J_e_dd_A_nd_e_rs_o_n_ _ _ _ _ _ _ _ _ _ _ _ __ Section, Township, Range: Sec. 23, T 46N, R12 E Landform (hillslope, terrace, etc.): Slope Local relief (concave, convex, none):


Convex SI ope(%): 0% Lat:


42.449565 Long: -87.800148 So ii Map Unit Name: _B_e_a_ch_S_an_d_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NWI Classification : ______N_o_t_A_P_Pl_ica_b_le_ _ __

Datum:


WGS84 Are climatic/hydrologic conditions of the site typical for this time of the year? Y (If no, explain in remarks)

Are vegetation , soil , or hydrology significantly disturbed?

Are vegetation , soil , or hydrology naturally problematic? Are "normal circumstances" present? No

SUMMARY

OF FINDINGS (If needed, explain any answers in remarks.)

Hydrophytic vegetation present? N

---N Hydric soil present?

Wetland hydrology present?

---N Is the sampled area within a wetland?

tf yes, optional wetland site ID:

N Remarks: (Explain alternative procedures here or in a separate report.)

VEGETATION - Use scientific names of plants.

Absolute Dominant Indicator Dominance Test Worksheet Tr~~ §tratum (Plot size: )  % Cover Species Sta us Number of Dominant Species 1 that are OBL, FACW, or FAC: 0 (A) 2 Total Number of Dominant 3 Species Across all Strata: 1 (8) 4 Percent of Dominant Species 5 that are OBL, FACW, or FAC: 0.00% (A/B) 0 =Total Cover Sa12ling/Shrub stratum (Plot size: 15 ) Prevalence Index Worksheet 1 Sa/Ix cordata 1 FAC Total % Cover of:

2 OBL species 0 x1= 0 FACW species x2 = 0 4

3 FAC species 0

1 x3=

--- 3 5 FACU species

--- 0 x4 =

--- 0 1 =Total Cover (Plot size: 5 )

UPL species Column totals

--- 90 x5=

(A)

---450 453 (B)

Herb stratum 1 Ammophi/a breviligulata 90 y UPL Prevalence Index = 8/A =

91 4.98 2

3 Hydrophytlc Vegetation Indicators:

4 Rapid test for hydrophytic vegetation 5

- Dominance test is >50%

6

- Prevalence index is S3.o*

7 8 Morphogical adaptations* (provide supporting data in Remarks or on a separate sheet) 10 9

WoQg~ vine §!rat1im (Plot size: 30 )

90 =Total Cover

--- Problematic hydrophytic vegetation* (explain)

  • 1ndlcators of hydric soil end wetland hydrology must be 1 present, unless disturbed or problematic 2 Hydrophytlc 0 =Total Cover vegetation present?

Remarks: (Include photo numbers here or on a separate sheet)

--- N Beach of Lake Michigan US Amy Corps of Engineers Midwest Region

SOIL Sampling Point: 2B Profile

Description:

(Describe to the depth needed to document the Indicator or confirm the absence of Indicators.)

Depth Matrix Redox Features (Inches) Color (moist)  % Color (moist)  % Type* Loe** Texture Remarks 0-21 NIA Beach Sand Beach Sand

=

  • Type: C Concentration, D = Depletion, RM =Reduced Matrix, MS =Masked Sand Grains. **Location: PL = Pore Lining, M =Matrix Hydrlc Soil Indicators: Indicators for Problematic Hydric Soils:

- Histisol (A1)

-- Sandy Gleyed Matrix (S4)

Sandy Redox (SS) -- Coast Prairie Redox (A16) (LRR K, L, R)

Dark Surface (S7) (LRR K, L)

- Histic Epipedon (A2)

-- Stripped Matrix (S6) -- 5 cm Mucky Peat or Peat (S3) (LRR K, L, R)

- Black Histic (A3)

Hydrogen Sulfide (A4) -- Loamy Mucky Mineral (F1) - Iron-Manganese Masses (F12) (LRR K, L, R)

- Stratified Layers (AS)

-- Loamy Gleyed Matrix (F2) -- Very Shallow Dark Surface (TF12)

- -- Depleted Matrix (F3)

- Other (explain in remarks) 2 cm Muck (A 10)

-- Redox Dark Surface (F6) --

Depleted Below Dark Surface (A 11)

Thick Dark Surface (A 12)

-- Depleted Dark Surface (F7)

- -- *Indicators of hydrophytic vegetation and weltand Sandy Mucky Mineral (S1) 5 cm Mucky Peat or Peat (S3) -- Redox Depressions (F8) hydrology must be present, unless disturbed or problematic Restrictive Layer (If observed}:

Type: None Hydric soil present? N Depth (inches):

Remarks:

Beach Sand HYDROLOGY Wetland Hydrology Indicators:

Primai:y Indicators {minimum of one is reguired; check all that aggl~l Secondaiy Indicators (minimum of two reguired)

Aquatic Fauna (B13) Surface Soil Cracks (B6)

Surface Water (A 1)

.__High Water Table (A2) -- True Aquatic Plants (B14) -- Drainage Patterns (B10)

,__ Saturation (A3) - Hydrogen Sulfide Odor (C1) -- Dry-Season Water Table (C2)

-water Marks (B1)

- Oxidized Rhizospheres on Living Roots -- Crayfish Burrows (CB)

(C3) -- Saturation Visible on Aerial Imagery (C9)

,__Sediment Deposits (B2)

-- Presence of Reduced Iron (C4) -- Stu.nted or Stressed Plants (D1)

Drift Deposits (83)

Algal Mat or Crust (84) -- Recent Iron Reduction in Tilled Soils -- Geomorphic Position (D2)

(C6) --

Iron Deposits (85)

Inundation Visible on Aerial Imagery (87) -- Thin Muck Surface (C7) -- FAG-Neutral Test (05)

- Sparsely Vegetated Concave Surface (BB) -- Gauge or Well Data (D9)

=Water-Stained Leaves (B9)

-- Other (Explain in Remarks)

Field Observations:

Surface water present? Yes No x Depth (inches) : WeUand Water table present? Yes No x Depth (inches):

--x-hydrology No 21" present?

Saturation present?

(includes capillary fringe)

Yes

--- Depth (inches): N Describe recorded data (stream gauge, monitoring well, aerial photos, previous inspections), if available:

None available Remarks:

Beach of Lake Michigan - Beach Sand US Army Corps of Engineers Midwest Region

Pl - West of bulkhead looking south P2 - South end of bulkhead looking north P3 - South side of study area looking NW at bu lkhead from .

beach area. P4 - Looking south at vegetated beach area.

1

PS - Looking north from south side of study area. P6 - Looking north at beach vegetation interface.

P7 - Looking north at study area beach. P8 - Looking south at study area beach.

2

P9 - Looking south at beach vegetation Interface in study area. PlO - Looking east at beach vegetation east of bulkhead wall.

Pll - Looking SE at beach vegetation east of bulkhead wall.

3