L-97-276, Forwards Rev 0 to PCM 97055, St Lucie Unit 1,Cycle 15 Colr. Refueling Overhaul Activities Currently in Progress & Reactor Operations for Cycle 15 Scheduled to Commence in Jan 1998

From kanterella
(Redirected from ML17229A512)
Jump to navigation Jump to search
Forwards Rev 0 to PCM 97055, St Lucie Unit 1,Cycle 15 Colr. Refueling Overhaul Activities Currently in Progress & Reactor Operations for Cycle 15 Scheduled to Commence in Jan 1998
ML17229A512
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/03/1997
From: Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17229A513 List:
References
L-97-276, NUDOCS 9711100090
Download: ML17229A512 (4)


Text

CATEGORY 1 J

REGULATOZNEORMATZON DZSTRZBUTZON %TEM (RZDS)

ACCERSIOQ NBR: 9711100090 DOC. DATE: 97/ll/03 NOTARIZED: NO FACIL:50~335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

AU)H.NiVIE AUTHOR AFFILIATION STALLEJ.A.

Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000335

SUBJECT:

Forwards Rev 0 to PCM 97055, "St Lucie Unit 1,Cycle 15 COLR." Refueling overhaul activities currently in progress 6

reactor operations for cycle 15 scheduled to commence in Jan 1998.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:

~

A i ~

T E

RECIPIENT ID CODE/NAME PD2-3 LA WIENS,L.

INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

0 1

1 RECIPIENT ID CODE/NAME PD2-3 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

l.

1 1

1 1

0 D

0

,C U

NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 r

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 13

()

I ~

f74 i

Florida Power &Light Company, 635't S. Ocean Drive, Jensen Beach, FL 34957 PPII November 3, 1997 L-97-276 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

St. Lucie Unit 1 Docket No. 50-335 CYCLE 15 CORE OPERATING LIMITSREPORT Pursuant to Florida Power 8 Light Company (FPL) Facility Operating License DPR-67 for St. Lucie Unit 1, the Core Operating Limits Report (COLR) for operating cycle 15 is submitted herewith.

Specifically, Technical Specification 6.9.1.11.d requires the COLR to be provided upon issuance for each reload cycle to the NRC.

Refueling overhaul activities are currently in progress and reactor operations for cycle 15 are scheduled to commence in January, 1998.

Attachment 1 to this letter is a copy of the ST. LUCIE UNIT 1, CYCLE 15 CORE OPERATING LIMITSREPORT, Revision 0. The header identifies the attachment number and revision level of the issuing reload Plant Change/Modification (PCM) document No. 97055. There have been no changes to the core operating limits or the list of approved analytical methods from those previously reported in the COLR for cycle 14.

Please contact us ifthere are any questions about this submittal.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/RLD Attachment cc:

Regional Administrator, Region II, USNRC.

Senior Resident Inspector, USNRC, St. Lucie Plant.

~ i"t3f' 1

'P7iii000'ri0 9'7ii03'DR ADQCK 05000335 P

PDR an FPL Group company Illlllllllilllillllllllllllllillliilllll'