L-92-247, Forwards Rev 2 to JNS-PSL-204, First Ten-Year Inservice Inspection Interval Inservice Testing Program for Pumps & Valves,St Lucie Nuclear Power Plant,Unit 2.Rev Incorporates Recommendations of GL 89-04 & NRC SE

From kanterella
(Redirected from ML17227A597)
Jump to navigation Jump to search
Forwards Rev 2 to JNS-PSL-204, First Ten-Year Inservice Inspection Interval Inservice Testing Program for Pumps & Valves,St Lucie Nuclear Power Plant,Unit 2.Rev Incorporates Recommendations of GL 89-04 & NRC SE
ML17227A597
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/15/1992
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17227A598 List:
References
GL-89-04, GL-89-4, L-92-247, NUDOCS 9209240290
Download: ML17227A597 (4)


Text

XCCECm~rED D~Srjuam.row DEMoz ra~nor SvSrEM REGULAT INFORMATION DISTRIBUTION STEM (RIDE)

ACCESSION NBR:9209240290 DOC.DATE: 92/09/15 NOTARIZED: NO FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power

& Light AUTH.NAME AUTHOR AFFILIATION "SAGER.D.A.

Florida --Power

& Light Co.

IRECIP'."'NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000389

SUBJECT:

Forwards Rev"2 to JNS-PSL-204, "First Ten-Year Inservice Inspection Interval Inservice Testing Program for Pumps Valves,St Lucie Nuclear Power Plant, Unit 2.Rev incorporates recommendations of GL 89-04

& NRC SE dtd 911205.

DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR I ENCL 2 SIZE:

+ /

TITLE: OR Submittal: Inservice Inspection/Testing/Relief from ASME Code NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA

,4 NORRIS, J INTERNAL: ACRS NRR/DET/EMEB 7E OC LFMB REG F 01 ESfD EXTERNAL EG&G. BROWN F B NRC PDR COPIES LTTR ENCL 1

0 2

2 6

6 1

1 1

0 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS3 RES MILLMANFG EG&G RANSOMEFC NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

0 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-'2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 19

A ~t lj d

~ 1

P.O. Box 128, Ft. Pierce, FL 34954-0120 September 15, 1992 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.

C.

20555 L-92-247 10 CFR 50.55a 10 CFR 50.4 Gentlemen:

RE:

St. Lucie Unit 2 Docket No. 50-389 Generic Letter 89-04 Initial Ten-Year Inservice Inspection Interval Inservice Testin Pro ram Revision 2

Florida Power and Light Company (FPL) has completely revised the St. Lucie IST Program to incorporate the recommendations of GL 89-04 and the NRC safety evaluation (SE) dated December 5,

1991.

FPL requests approval of the revised program by June 30,

1993, to support testing during the next Unit 2 refueling outage.

Attachment 1 provides a summary of the relief requests to the IST Program.

Attachment 2 provides the revised St. Lucie Unit 2 IST Program.

Pursuant to 10 CFR 50.55a(a)(3),

FPL requests that interim relief be granted on the requests identified in Attachment 1 until the NRC completes its review.

Generic Letter (GL) 89-04 "Guidance on Developing Acceptable Inservice Testing Programs,"

was issued by the NRC on April 3, 1989.

The GL did not require a response for Unit 2 because the Unit 2 program revision 1 was under review by the NRC at that time.

The NRC SE dated December 5,

1991, denied certain relief requests related to pump and valve testing.

By letter (L-92-38) dated February 25,

1992, FPL submitted a response to the SE.

NRC letter dated April 16,

1992, accepted the FPL proposed resolution of the open items and requested the revised program to be submitted by April 16, 1993.

Please contact us if there are any questions about this submittal.

Very truly yours, Qi Vice P St ~ L ger sident ie Plant DAS/GRM/kw P

cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant DAS/PSL 8630-92

'. 9209240290,9209l6 PDR.<. <ADOCK 05000286 PDR P.

an FPL Group company

41

~ V

,S I

'1r 88%0.~,"='