L-90-397, Forwards Monthly Operating Repts for Oct 1990 for St Lucie Units 1 & 2 & Revised Data Rept for June 1990 for Unit 1

From kanterella
(Redirected from ML17223B005)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Oct 1990 for St Lucie Units 1 & 2 & Revised Data Rept for June 1990 for Unit 1
ML17223B005
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/14/1990
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17223B006 List:
References
L-90-397, NUDOCS 9011210138
Download: ML17223B005 (3)


Text

ACCELERATED D TRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9011210138 DOC. DATE: 90/11/14 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards monthly operating repts for Oct 1990 for St Lucie Units '1

& 2

& revised data rept for June 1990 for Unit 1.

DOCKET g

05000335 05000389 DXSTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR t

ENCL Q SIZE:

+ 47 TITLE: Monthly Operating Report (per Tech Spec9)

NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J XNTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 RGN2 EXTERNAL EG&G BRYCE iJ ~ H NSIC COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 RECIPIENT XD CODE/NAME PD2-2 PD AEOD/DOA IBH 'CECH~D

-z NRC PDR COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 S

D NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 25 ENCL 25

4 P.O.Box14000,Juno Beach,FL 33408-0420 NOV i 4,1SSl L-90-397 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 Gentlemen:

Re:

St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Monthl 0 eratin Re ort Attached are the October 1990 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Also included is the revised operating data report for Unit 1 for the month of June; there was a calculation error in line N16 that has been corrected.

Very truly yours,

+. g. Wgd"~W

/ ~/D. A.Ahager Vice President St. Lucie Plant DAS:JJB kw cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Attachments DAS/PSL N281 PDp~ lPl 0lg@

>Oll R

@DOCH'Ol 03l

~~OOOO w p

@~9 C

t/

"alt;FPL Group company