PLA-7605, Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A

From kanterella
(Redirected from ML17137A128)
Jump to navigation Jump to search

Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A
ML17137A128
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/17/2017
From: Berryman B
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7605
Download: ML17137A128 (8)


Text

MAY l 7* 2017 Brad Berryman Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Brad.Berryman @TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION CHANGE TO SUBMITTAL REGARDING LICENSE AMENDMENT REQUEST FOR ADOPTION OF TECHNICAL SPECIFICATION TASK FORCE TRAVELER TSTF -522-A PLA-7605 TALEN~

ENERGY 10 CFR 50.90 Docket Nos. 50-387 and 50-388 Reference 1:

Technical Specification Task Force Traveler TSTF-522-A, Revision 0, "Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. "

Reference 2:

Susquehanna Steam Electric Station, "Proposed Amendment Requests to License No.

NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, 'Revise Ventilation System Surveillance Requirements to Operate for 10 Hours per Month' using the Consolidated Line Item Improvement Process," dated February 1, 2017 (PLA-7444).

Reference 3:

NUREG-1433, Standard Technical Specifications, General Electric Plants, BWR/4, Revision 1, dated Apri/1995.

By a letter dated February 1, 2017 (Reference 2) Susquehanna Steam Electric Station (SSES) submitted a proposed License Amendment Request to SSES Units 1 and 2 Operating Licenses NPF-14 and NPF-22 to adopt Technical Specification Task Force Traveler TSTF-522-A, Revision 0 "Revise Ventilation System Surveillance Requirements to Operate for 10 Hours per Month." This amendment would modify the Technical Specifications (TS) by changing the run time of monthly Surveillance Requirements (SR) for the Standby Gas Treatment and Control Room Emergency Outside Air Supply Systems from 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> to 15 minutes.

Subsequent to submitting the amendment request, an administrative change was identified in the Unit 1 and 2 TS mark ups. Specifically, TS 3.7.3 Control Room Emergency Outside Air Supply (CREOAS) Systems SR 3. 7.3.1 states, "... with the heaters operable." The surveillance should state,"... with the heaters operating." This administrative language change aligns TS 3.7.3, SR 3.7.3.1 with the existing language in TS 3.6.4.3 Standby Gas Treatment (SGTS) System, SR 3.6.4.3.1. Additionally, this change aligns with the language within NUREG-1433 Rev 1 (Reference 3) and TSTF-522-A, Rev 0 (Reference 1). of this letter provides replacement pages for the associated TS mark-ups provided under Attachment 1 ofPLA-7444 (Reference 2). These pages replace Page 3 and 4 ofthe of Reference 2.

Document Control Desk PLA-7605 of this letter provides replacement pages for the associated TS revised pages provided under Attachment 3 ofPLA-7444 (Reference 2). These pages replace Page 3 and 4 of the Attachment 3 of Reference 2.

The administrative change identified within this letter does not impact or alter the conclusions reached under the No Significant Hazards Review and Environmental Evaluation completed under License Amendment Request submitted under Reference 2. This letter contains no new regulatory commitments.

Should you have any questions regarding this submittal, please contact Mr. Jason Jennings, Manager

-Nuclear Regulatory Affairs at (570) 542-3155.

I declare under penalty of pe1jury that the foregoing is true and correct.

Executed on: (i/f!lt /1/ J..or7 Sincerely, B. Benyman : Replacement Pages for Markups of Existing Technical Specifications : Replacement Pages for Revised Technical Specifications Copy:

NRC Region I Ms. T. E. Hood, NRC Project Manager Ms. L. Micewski, NRC Sr. Resident Inspector Mr. M. Shields, PA DEP/BRP to PLA-7605 Replacement Pages for Markups of Existing Technical Specifications

ACTIONS (continued)

CONDITION REQUIRED ACTION CREOAS System 3.7.3 COMPLETION TIME F. Two CREOAS subsystems


NOTE--------------------

inoperable during movement LCO 3.0.3 is not applicable.

of irradiated fuel assemblies in the secondary containment; during CORE F.1 Suspend movement of Immediately ALTERATIONS, or during irradiated fuel assemblies in OPDRVs.

the secondary containment.

OR AND One or more CREOAS F.2 Suspend CORE Immediately subsystems inoperable due ALTERATIONS.

to an inoperable CRE boundary during movement of irradiated fuel assemblies AND in the secondary containment, during CORE F.3 Initiate action to suspend ALTERATIONS, or during Immediately OPDRVs.

OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3. 7.3.1 Operate each CREOAS filter train for ;;::.W 15 continuous OOt/fS minutes with the heaters operableoperating.

SR 3.7.3.2 Perform required CREOAS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

SR 3.7.3.3 Verify each CREOAS subsystem actuates on an actual or simulated initiation signal.

I SUSQUEHANNA-UNIT 1 TS I 3.7-8 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program (continued)

Amendment 2-GJ, ~. 266, _

ACTIONS (continued)

CONDITION REQUIRED ACTION CREOAS System 3.7.3 COMPLETION TIME F. Two CREOAS subsystems


-----------~OTE---- --- ------ - -------

inoperable during movement LCO 3.0.3 is not applicable.

of irradiated fuel assemblies in the secondary containment, during CORE F.1 Suspend movement of Immediately ALTERATIONS, or during irradiated fuel assemblies in OPDRVs.

the secondary containment.

OR AND One or more CREOAS F.2 Suspend CORE subsystems inoperable due ALTERATIONS.

to an inoperable CRE boundary during movement of irradiated fuel AND assemblies in the secondary containment, during CORE F.3 Initiate action to suspend ALTERATIONS, or during OPDRVs.

OPDRVs.

SURVEILLA~CE REQUIREME~TS SURVEILLANCE SR 3. 7.3.1 Operate each CREOAS filter train for ~ 4.Q 15 continuous Aoof6 minutes with the heaters operable operating.

SR 3.7.3.2 Perform required CREOAS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

SR 3.7.3.3 Verify each CREOAS subsystem actuates on an actual or simulated initiation signal.

SUSQUEHA~A-UNIT 2 TS /3.7-9 Immediately Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program (continued)

Amendment 4--84, ~. _

to PLA-7605 Replacement Pages for Revised Technical Specifications

ACTIONS (continued)

CONDITION REQUIRED ACTION CREOAS System 3.7.3 COMPLETION TIME F. Two CREOAS subsystems


N()TE--------------------

inoperable during movement LC() 3.0.3 is not applicable.

of irradiated fuel assemblies in the secondary containment, during CORE F.1 Suspend movement of Immediately ALTERATIONS, or during irradiated fuel assemblies in OPDRVs.

the secondary containment.

OR AND One or more CREOAS F.2 Suspend CORE Immediately subsystems inoperable due ALTERATIONS.

to an inoperable CRE boundary during movement of irradiated fuel assemblies AND in the secondary containment, during CORE F.3 Initiate action to suspend ALTERATIONS, or during Immediately OPDRVs.

OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3. 7.3.1

()perate each CREOAS filter train for 2: 15 continuous minutes with the heaters operating.

SR 3.7.3.2 Perform required CRE()AS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

SR 3.7.3.3 Verify each CREOAS subsystem actuates on an actual or simulated initiation signal.

SUSQUEHANNA-UNIT 1 TS I 3.7-8 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program (continued)

Amendment~,~, ~, _

ACTIONS (continued)

CONDITION REQUIRED ACTION CREOAS System 3.7.3 COMPLETION TIME F. Two CREOAS subsystems


NOTE---------------------

inoperable during movement LCO 3.0.3 is not applicable.

of irradiated fuel assemblies in the secondary containment, during CORE F.1 Suspend movement of Immediately ALTERATIONS, or during irradiated fuel assemblies in OPDRVs.

the secondary containment.

OR AND One or more CREOAS F.2 Suspend CORE subsystems inoperable due ALTERATIONS.

to an inoperable CRE boundary during movement of irradiated fuel AND assemblies in the secondary containment, during CORE F.3 Initiate action to suspend ALTERATIONS, or during OPDRVs.

OPDRVs.

SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.3.1 Operate each CREOAS filter train for;::: 15 continuous minutes with the heaters operating.

SR 3.7.3.2 Perform required CREOAS filter testing in accordance with the Ventilation Filter Testing Program (VFTP).

SR 3.7.3.3 Verify each CREOAS subsystem actuates on an actual or simulated initiation signal.

SUSQUEHANA-UNIT 2 TS I 3.7-9 Immediately Immediately FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the VFTP In accordance with the Surveillance Frequency Control Program (continued)

Amendment 4M, ~. _