Text
FENOC 76 South Main Sfreef Akron. Ohio 44308 Samuel L. Belcher President and Chief Nuclear Officer October 25,2016 L-16-304 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Supplement to Request License Amendment Approval Delav (CAC Nos. MF7771, MF7772, MF7773, MF7774, MF7780, MF7781
, MF7782. and MF7783\\
By letter dated May 24,2016 (Accession Number ML16148A047),
and supplemented by letter dated August 29,2016 (Accession Number ML16245A081),
FirstEnergy Nuclear Operating Company (FENOC) requested an amendment to revise Technical Specifications (TS) for Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant, consistent with TSTF-545, Revision 3, "TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing,"
and to use American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code Case OMN-20, "lnservice Test Frequency."
As requested in a September 27, 2016 e-mail from the Nuclear Regulatory Commission Licensing Project Manager for FENOC, this letter supplements the May 24,2016 letter by requesting specific dates for approval of the proposed license amendment request.
As stated in the letterdated May 24,2016, FENOC requested approval by May 31,2017 with a 150-day implementation period to allow implementation activities to align with the inservice testing 10-year interval update at BeaverValley Power Station.
In order to ensure approval of the license amendment is not issued too early, approval is requested no earlier than April 23,2017. Approval of ASME OM Code Case OMN-20 is requested at the time the license amendment is approved or earlier, since enforcement discretion will continue to be in place only until the license amendment is approved.
10 cFR 50.90 10 CFR 50.55a
Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Perry Nuclear Power Plant L-16-304 Page 2 of 2 There are no regulatory commitments contained in this submittal. lf there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager
- Fleet Licensing, at 330-315-6810.
I declare under penalty of perjury that the foregoing is true and correct. Executed on october L{, iorc.
Sincerely, Samuel L. Belcher cc:
NRC Region I Administrator NRC Region lll Administrator NRC Resident Inspector
- Beaver Valley NRC Resident lnspector
- Davis-Besse NRC Resident Inspector
- Perry NRC Project Manager
- FENOC Fleet Director BRP/DEP Site BRP/DEP Representative Utility Radiological Safety Board Executive
- Director, OEMA, State of Ohio