Site: Salem  PSEG icon.png
Issue date: 02/03/2016
From: Jamila Perry
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CAC MF6065, CAC MF6066, LAR S15-02, LR-N16-0016
Download: ML16034A277 (2)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 Ps:<i Nuclear FEB 3 2016 10 CFR 50.90 LR-N16-0016 LAR S15-02 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Nuclear Generating Station Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and 75 NRC Docket Nos. 50-272 and 50-311

Subject:

Implementation Schedule Change for License Amendment Request Regarding Replacement Of Source Range And Intermediate Range Neutron Monitoring Systems (CAC NOS. MF6065 AND MF6066)

References 1. PSEG letter to NRC, "License Amendment Request Regarding Replacement of Source Range and Intermediate Range Neutron Monitoring Systems,"

dated April 3, 2015 (ADAMS Accession No. ML15093A291)

In the Reference 1 letter, PSEG Nuclear LLC (PSEG) submitted a license amendment request (LAR) for Salem Nuclear Generating Station (Salem), Units 1 and 2. The proposed amendment would revise Technical Specifications (TS) 3/4.3.1, Reactor Trip System, to support the replacement of the existing source range (SR) and intermediate range (IR) nuclear instrumentation.

PSEG requested NRC approval of the proposed LAR by April 3, 2016, to support planned modifications to replace the existing SR and IR nuclear instrumentation. PSEG also requested a staggered implementation with the Salem Unit 1 implementation during the spring 2016 refueling outage (1R24) and the Salem Unit 2 implementation during the spring 2017 refueling outage (2R22).

PSEG has re-assessed the work scope for the Salem 1R24 outage and determined that the replacement of the source range and intermediate detectors is going to be moved from the 1 R24 outage to the fall 2017 (1R25) refueling outage. Based on this decision PSEG is updating the implementation schedule requested in Reference 1.

PSEG is requesting a staggered implementation with the Salem Unit 1 implementation during the fall 2017 refueling outage (1R25) and the Salem Unit 2 implementation during the spring 2017 refueling outage (2R22).

10 CFR 50.90 Page 2 LR-N16-0016

}here are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please contact Mr. Brian Thomas at 856-339-2022.

I declare under penalty of perjury that the foregoing is true and correct.

FEB S 2016 Executed on (date)

Respectfully, r1Lr:

?o h F. Perry . U Site Vice President Salem Nuclear Generating Station cc: Mr. D. Dorman, Administrator, Region I, NRC Ms. C. Parker, NRC Project Manager, Salem NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Chief, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator