St7Lucie, Units 1 and 2, Turkey Point Units 3 and 4, Seabrook, Duane Arnold, Point Beach Units 1 and 2 - Commitment to Maintain Severe Accident Management GuidelinesML15356A209 |
Person / Time |
---|
Site: |
Saint Lucie, Point Beach, Seabrook, Turkey Point, Duane Arnold, 07200061, 07200062 |
---|
Issue date: |
12/17/2015 |
---|
From: |
Larry Nicholson Florida Power & Light Co, NextEra Energy Duane Arnold, Point Beach, NextEra Energy Seabrook |
---|
To: |
Document Control Desk, Office of Nuclear Material Safety and Safeguards |
---|
References |
---|
L-2015-278 |
Download: ML15356A209 (4) |
|
|
---|
Category:Letter type:L
MONTHYEARL-2024-184, Radiological Emergency Plan Revision 772024-11-0505 November 2024 Radiological Emergency Plan Revision 77 L-2024-173, Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-31031 October 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-175, Cycle 34 Core Operating Report2024-10-24024 October 2024 Cycle 34 Core Operating Report L-2024-177, Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis2024-10-22022 October 2024 Revised Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis L-2024-160, Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41)2024-10-21021 October 2024 Core Operating Limits Report (COLR) Unit 2 Reload Cycle 41 (U2C41) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-120, LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization2024-10-0808 October 2024 LAR 301 - Revise Renewed Facility Operating Licenses to Adopt an Alternative Approach for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-145, Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency2024-09-0909 September 2024 Notification of Deviation from EPRI MRP-227, Revision 1-A Baffle Bolt Inspection Frequency L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report L-2024-131, Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-08-0909 August 2024 Response to Request for Additional Information Regarding License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-113, License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections2024-07-24024 July 2024 License Amendment Request 294, Application to Revise Technical Specifications to Adopt TSTF- 577, Revised Frequencies for Steam Generator Tube Inspections L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. L-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-105, License Amendment Request 300, Modify Containment Average Air Temperature Requirements2024-06-26026 June 2024 License Amendment Request 300, Modify Containment Average Air Temperature Requirements L-2024-107, Schedule for Subsequent License Renewal Environmental Review2024-06-25025 June 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations L-2024-093, Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision2024-06-10010 June 2024 Steam Generator Divider Plate Assemblies Bounding Analysis Evaluation for Aging Management Commitment 14 Revision L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld 2024-09-09
[Table view] |
Text
BNBxRaTM December 17, 2015 L-201 5-278
- U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Re: Florida Power & Light Company St7Lucie Units 1 and 2, Docket Nos. 50-335, 50-389 Docket No. 72-61 Florida Power & Light Company Turkey Point Units 3 and 4, Docket Nos. 50-250, 50-251 Docket No. 72-62 NextEra Energy Seabrook, LLC Seabrook Station, Docket No. 50-443 Docket No. 72-63 NextEra Energy Duane Arnold, LLC Duane Arnold Energy Center, Docket No. 50-331 Docket No. 72-32 NextEra Energy Point Beach, LLC Point Beach Units 1 and 2, Docket Nos. 50-266, 50-301 Docket No. 72-05
Subject:
Commitment to Maintain Severe Accident Manaqement Guidelines The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes commitments related to SAMGs for Florida Power & Light Company for itself, the licensee for the St. Lucie Nuclear Plant, Units I and 2, and the Turkey Point Nuclear Plant, Units 3 and 4, and on behalf of NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) the licensee for Seabrook Station; NextEra Energy Duane Arnold, LLC (NextEra Energy Duane Arnold), the licensee for Duane Arnold Energy Center; and NextEra Energy Point Beach, LLC (NextEra Energy Point Beach), the licensee for Point Beach Nuclear Plant, Units 1 and 2 (collectively referred to as NextEra Energy).
NextEra Energy, Inc. ***.
700 Universe Boulevard, Juno Beach, FL 33408
L-201 5-278 Page 2 of 2 These guidelines would be used by emergency response personnel during accident conditions that progress beyond the mitigation capabilities described in Emergency Operating Procedures (EOPs). SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.
The new SAMG commitments are listed in Attachment 1.
It is expected that NRC staff personnel will conduct periodic inspection of our SAMGs and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. We also understand that inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAMGs.
Should you have any questions concerning the content of this letter, please contact Larry Nicholson at 561-691-2798.
Sincerely, Director, Nuclear Licensing and Regulatory Compliance
Attachment:
List of Regulatory Commitments cc: U. S. Nuclear Regulatory Commission Attn: Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region I Regional Administrator, Region II Regional Administrator, Region Ill USNRC Project Manager, Turkey Point and St. Lucie Senior Resident Inspector, USNRC, Turkey Point Senior Resident Inspector, USNRC, St. Lucie USNRC Project Manager, Seabrook Station Senior Resident Inspector, USNRC, Seabrook Station USNRC Project Manager, Duane Arnold Senior Resident Inspector, USNRC, Duane Arnold USNRC Project Manager, Point Beach Senior Resident Inspector, Point Beach
ATTACHMENT 1 List of Regulatory Commitments
Attachment 1 L-201 5-278 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by St. Lucie Nuclear Plant, Turkey Point Nuclear Plant, Seabrook Station, Duane Arnold Energy Center, and Point Beach Nuclear Plant in this document. Any other statements in this submittal are provided for information purposes and are not considered to~be regulatory Commitments.
TYPE (Check One) SCHEDULED COMMITMENT OE CNTUIG COMPLETION TIME COMPLIANCE DT ACTION St. Lucie Nuclear Plant, Turkey Point Nuclear X October 31, 2016 Plant, Seabrook Station, Duane Arnold Energy Center, and Point Beach Nuclear Plant will consider the site SAMGs within plant configuration management processes in order to ensure that the SAMGs reflect, changes to the facility over time.
Duane Arnold Energy Center will update the site X June 30, 2017 SAMGs to revision 3 of the BWROG generic severe accident guidelines (published February, 2013).
St. Lucie Nuclear Plant, Turkey Point Nuclear Plant, Seabrook Station, Duane Arnold Energy XWithin 2 refueling Center, and Point Beach Nuclear Plant will outages or 3 years of update the site SAMGs to future revisions of the the publication date BWROG or PWROG, respectively, generic of the guidelines, severe accident technical guidelines, and the whichever is greater SAMGs will be integrated with other emergency response guideline sets and symptom-based Emergency Operating Procedures, and validated, using the guidance in NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents. 1 1 - Duane Arnold Energy Center - Use of NEI 14-01 guidance begins with the update to revision 4 of the BWROG generic severe accident guidelines.
BNBxRaTM December 17, 2015 L-201 5-278
- U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Re: Florida Power & Light Company St7Lucie Units 1 and 2, Docket Nos. 50-335, 50-389 Docket No. 72-61 Florida Power & Light Company Turkey Point Units 3 and 4, Docket Nos. 50-250, 50-251 Docket No. 72-62 NextEra Energy Seabrook, LLC Seabrook Station, Docket No. 50-443 Docket No. 72-63 NextEra Energy Duane Arnold, LLC Duane Arnold Energy Center, Docket No. 50-331 Docket No. 72-32 NextEra Energy Point Beach, LLC Point Beach Units 1 and 2, Docket Nos. 50-266, 50-301 Docket No. 72-05
Subject:
Commitment to Maintain Severe Accident Manaqement Guidelines The Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC) recently approved an Industry Initiative to implement and maintain Severe Accident Management Guidelines (SAMGs). This letter establishes commitments related to SAMGs for Florida Power & Light Company for itself, the licensee for the St. Lucie Nuclear Plant, Units I and 2, and the Turkey Point Nuclear Plant, Units 3 and 4, and on behalf of NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) the licensee for Seabrook Station; NextEra Energy Duane Arnold, LLC (NextEra Energy Duane Arnold), the licensee for Duane Arnold Energy Center; and NextEra Energy Point Beach, LLC (NextEra Energy Point Beach), the licensee for Point Beach Nuclear Plant, Units 1 and 2 (collectively referred to as NextEra Energy).
NextEra Energy, Inc. ***.
700 Universe Boulevard, Juno Beach, FL 33408
L-201 5-278 Page 2 of 2 These guidelines would be used by emergency response personnel during accident conditions that progress beyond the mitigation capabilities described in Emergency Operating Procedures (EOPs). SAMG strategies are intended to arrest the progression of fuel damage, maintain the capability of the containment as long as possible, and minimize radiological releases.
The new SAMG commitments are listed in Attachment 1.
It is expected that NRC staff personnel will conduct periodic inspection of our SAMGs and performance deficiencies, if any, will be assessed using the Reactor Oversight Process. We also understand that inspection activities will not extend to NRC review and approval of SAMG strategies, or the use of equipment described in the SAMGs.
Should you have any questions concerning the content of this letter, please contact Larry Nicholson at 561-691-2798.
Sincerely, Director, Nuclear Licensing and Regulatory Compliance
Attachment:
List of Regulatory Commitments cc: U. S. Nuclear Regulatory Commission Attn: Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region I Regional Administrator, Region II Regional Administrator, Region Ill USNRC Project Manager, Turkey Point and St. Lucie Senior Resident Inspector, USNRC, Turkey Point Senior Resident Inspector, USNRC, St. Lucie USNRC Project Manager, Seabrook Station Senior Resident Inspector, USNRC, Seabrook Station USNRC Project Manager, Duane Arnold Senior Resident Inspector, USNRC, Duane Arnold USNRC Project Manager, Point Beach Senior Resident Inspector, Point Beach
ATTACHMENT 1 List of Regulatory Commitments
Attachment 1 L-201 5-278 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by St. Lucie Nuclear Plant, Turkey Point Nuclear Plant, Seabrook Station, Duane Arnold Energy Center, and Point Beach Nuclear Plant in this document. Any other statements in this submittal are provided for information purposes and are not considered to~be regulatory Commitments.
TYPE (Check One) SCHEDULED COMMITMENT OE CNTUIG COMPLETION TIME COMPLIANCE DT ACTION St. Lucie Nuclear Plant, Turkey Point Nuclear X October 31, 2016 Plant, Seabrook Station, Duane Arnold Energy Center, and Point Beach Nuclear Plant will consider the site SAMGs within plant configuration management processes in order to ensure that the SAMGs reflect, changes to the facility over time.
Duane Arnold Energy Center will update the site X June 30, 2017 SAMGs to revision 3 of the BWROG generic severe accident guidelines (published February, 2013).
St. Lucie Nuclear Plant, Turkey Point Nuclear Plant, Seabrook Station, Duane Arnold Energy XWithin 2 refueling Center, and Point Beach Nuclear Plant will outages or 3 years of update the site SAMGs to future revisions of the the publication date BWROG or PWROG, respectively, generic of the guidelines, severe accident technical guidelines, and the whichever is greater SAMGs will be integrated with other emergency response guideline sets and symptom-based Emergency Operating Procedures, and validated, using the guidance in NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents. 1 1 - Duane Arnold Energy Center - Use of NEI 14-01 guidance begins with the update to revision 4 of the BWROG generic severe accident guidelines.