0September 30, 2015 I=PLo L-20 15-244 10 CFR 54 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001 St. Lucie Unit 1 Docket No. 50-335 Completion of License Renewal Activities before Period of Extended Operation Phase 2 Inspection Readiness Reference
- 1. NRC Letter from Raj K. Anand to J.A. Stall dated October 2, 2003 Issuance of Renewed Facility Operating License Nos. DPR-67 and NPF-16 for St. Lucie Plant Unit Nos. 1 and 2.
- 2. FPL Letter from D.E. Jernigan to U.S. Nuclear Regulatory Commission dated March 28, 2003 (L-2003-070) St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 License Renewal Safety Evaluation Report Open Item and Confirmatory Item Responses and Revised License Renewal Application Appendix A.
- 3. FPL Letter from William Jefferson, Jr.
to U.S. Nuclear Regulatory Commission dated October 21, 2004 (L-2004-223) St. Lucie Unit 1 Docket No. 50-335 Updated Final Safety Analysis Report Amendment 20.
- 4. Safety Evaluation Report Related to the License Renewal of St. Lucie Nuclear Plant, Units 1 and 2, NUREG-1779, September 2003.
- 5. FPL Letter from Joseph Jensen to U.S. Nuclear Regulatory Commission (L-2014-192) dated June 25, 2014 "St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389, Reactor Vessel Internals Inspection Program Plans and Inspection Dates."
The purpose of this letter is to inform the NRC of the status of an obligation in License Condition 3.C for St. Lucie Unit 1 from Reference 1 and to provide notification of the plant's readiness for the License Renewal Implementation Phase 2 Inspection.
Reference 1 contains the following obligation in the first paragraph of License Condition 3.C for St. Lucie Unit 1 as stated below:
"Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d),
as revised on March 28, 2003, describes certain future activities to be completed before the period of extended operation [PEO]. FPL shall complete these activities no later than March 1, 2016, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection."
Reference 2, Attachment 3, Appendix Al contains the St. Lucie Unit 1 UFSAR Supplement to the License Renewal Application required by 10 CFR 54.21(d) discussed in License Condition/ZO C
3.C above. Appendix Al contains (New) UFSAR Chapter 18 "Aging Management Programs and Florida Power & Light Comnpany
/
6501 S. Ocean Drive, Jensen Beach, FL 34957
- L C*
L-201 5-244 Page 2 of 2 Time-Limited Aging Analyses Activities," which includes the future activities to be completed no later than March 1, 2016. This new Chapter 18 was initially incorporated into the UFSAR via the update submittal made in Reference 3. The described activities in the current revision of St.
Lucie Unit 1 UFSAR Chapter 18 have been completed, with the exception of the inspection of Reactor Vessel Internals (RVI), which in accordance with commitment item 5, in Appendix D of Reference 4, will be performed during the PEO. Reference 5 discussed and reaffirmed FPL's adoption of MRP-227-A which requires the implementation of periodic RVI inspections for both St. Lucie Unit 1 and 2, and supersedes the prior commitment for a one-time inspection. As also discussed in Reference 5, the first inspection of St. Lucie Unit 1 RVl is currently scheduled for the Spring Outage of 2018.
Should you have any questions, please contact Mr. Eric Katzman, Licensing Manager, at 772-467-7734.
Vetruly yours, f
/
Christopher Costanzo
(
Site Vice President St. Lucie Plant
0September 30, 2015 I=PLo L-20 15-244 10 CFR 54 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001 St. Lucie Unit 1 Docket No. 50-335 Completion of License Renewal Activities before Period of Extended Operation Phase 2 Inspection Readiness Reference
- 1. NRC Letter from Raj K. Anand to J.A. Stall dated October 2, 2003 Issuance of Renewed Facility Operating License Nos. DPR-67 and NPF-16 for St. Lucie Plant Unit Nos. 1 and 2.
- 2. FPL Letter from D.E. Jernigan to U.S. Nuclear Regulatory Commission dated March 28, 2003 (L-2003-070) St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 License Renewal Safety Evaluation Report Open Item and Confirmatory Item Responses and Revised License Renewal Application Appendix A.
- 3. FPL Letter from William Jefferson, Jr.
to U.S. Nuclear Regulatory Commission dated October 21, 2004 (L-2004-223) St. Lucie Unit 1 Docket No. 50-335 Updated Final Safety Analysis Report Amendment 20.
- 4. Safety Evaluation Report Related to the License Renewal of St. Lucie Nuclear Plant, Units 1 and 2, NUREG-1779, September 2003.
- 5. FPL Letter from Joseph Jensen to U.S. Nuclear Regulatory Commission (L-2014-192) dated June 25, 2014 "St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389, Reactor Vessel Internals Inspection Program Plans and Inspection Dates."
The purpose of this letter is to inform the NRC of the status of an obligation in License Condition 3.C for St. Lucie Unit 1 from Reference 1 and to provide notification of the plant's readiness for the License Renewal Implementation Phase 2 Inspection.
Reference 1 contains the following obligation in the first paragraph of License Condition 3.C for St. Lucie Unit 1 as stated below:
"Updated Final Safety Analysis Report The Updated Final Safety Analysis Report supplement submitted pursuant to 10 CFR 54.21(d),
as revised on March 28, 2003, describes certain future activities to be completed before the period of extended operation [PEO]. FPL shall complete these activities no later than March 1, 2016, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection."
Reference 2, Attachment 3, Appendix Al contains the St. Lucie Unit 1 UFSAR Supplement to the License Renewal Application required by 10 CFR 54.21(d) discussed in License Condition/ZO C
3.C above. Appendix Al contains (New) UFSAR Chapter 18 "Aging Management Programs and Florida Power & Light Comnpany
/
6501 S. Ocean Drive, Jensen Beach, FL 34957
- L C*
L-201 5-244 Page 2 of 2 Time-Limited Aging Analyses Activities," which includes the future activities to be completed no later than March 1, 2016. This new Chapter 18 was initially incorporated into the UFSAR via the update submittal made in Reference 3. The described activities in the current revision of St.
Lucie Unit 1 UFSAR Chapter 18 have been completed, with the exception of the inspection of Reactor Vessel Internals (RVI), which in accordance with commitment item 5, in Appendix D of Reference 4, will be performed during the PEO. Reference 5 discussed and reaffirmed FPL's adoption of MRP-227-A which requires the implementation of periodic RVI inspections for both St. Lucie Unit 1 and 2, and supersedes the prior commitment for a one-time inspection. As also discussed in Reference 5, the first inspection of St. Lucie Unit 1 RVl is currently scheduled for the Spring Outage of 2018.
Should you have any questions, please contact Mr. Eric Katzman, Licensing Manager, at 772-467-7734.
Vetruly yours, f
/
Christopher Costanzo
(
Site Vice President St. Lucie Plant