NL-15-007, Unit Numbers 1, 2, and 3 - Consent to Confirmatory Orders EA-14-135 and EA-14-136 and Hearing Waiver Form

From kanterella
(Redirected from ML15030A031)
Jump to navigation Jump to search

Unit Numbers 1, 2, and 3 - Consent to Confirmatory Orders EA-14-135 and EA-14-136 and Hearing Waiver Form
ML15030A031
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/16/2015
From: Coyle L
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
EA-14-135, EA-14-136, NL-15-007, TAC MF2603, TAC MF2604, TAC MF2605
Download: ML15030A031 (4)


Text

Entergy Nuclear Northeast Indian Point Energy Center Entergy-- 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-024 Tel 914 254 6700 Lawrence Coyle Site Vice President January 16, 2015 NL-15-007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11545 Rockville Pike, TWFN-2 F1 Rockville, MD 20852-2738

SUBJECT:

Consent to Confirmatory Orders EA-14-135 and EA-14-136 and Hearing Waiver Form (TAC Nos. MF2603, MF2604 and MF2605)

Indian Point Unit Numbers 1, 2, and 3 Docket Nos.50-003, 50-247 and 50-286 License Nos. DPR-5, DPR-26 and DPR-64

Dear Sir or Madam:

On January 12, 2015, the Nuclear Regulatory Commission (NRC) forwarded a draft Confirmatory Order with regard to the Entergy Nuclear Operations, Inc. (Entergy) request that the Commission permit the transfer, receipt, possession, transport, import, and use of certain weapons and mass capacity ammunition feeding devices under Section 161A of the Atomic Energy Act of 1954, as amended. The NRC requested Entergy consent to the proposed order and waiver of the right to a hearing.

Entergy consents to the issuance of Confirmatory Orders EA-14-135 and EA-14-136, effective immediately upon issuance. In consenting to Confirmatory Orders EA-14-135 and EA-14-136, Entergy agrees to waive the right to request a hearing on all or any part of the confirmatory orders. This consent and waiver is formalized in the Enclosure to this letter.

On January 12, 2015, the NRC also sent proposed a proposed License Condition associated with the conforming amendment for approval of the request for preemption. Entergy finds this proposed License Condition acceptable. The License condition is:

ENO has been granted Commission authorization to use "stand alone preemption authority" under Section 161A of the Atomic Energy Act, 42 U.S.C. 2201a with respect to the weapons described in Section II supplemented with Section III of

~(D) jjc-2,0

NL-15-007 Docket Nos.50-003, 50-247 and 50-286 Page 2 of 2 Attachment 1 to its application submitted by letter dated August 20, 2013, as supplemented by letters dated November 21, 2013, and July 24, 2014, and citing letters dated April 27, 2011, and January 4, 2012. ENO shall fully implement and maintain in effect the provisions of the Commission approved authorization.

No new regulatory commitments are contained in this letter. Should you have any questions concerning this letter, or require additional information, please contact Robert Walpole, Manager, Regulatory Assurance at (914) 254-6710.

Sincerely, LC/sp*--

Enclosure:

Consent and Hearing Waiver Form cc: Mr. Douglas Picket, Senior Project Manager, NRC NRR DORL Mr. Stephen Giebel, Project Manager, NRC FSME DWMEP DURLD Mr. Daniel H. Dorman, Regional Administrator, NRC Region 1 NRC Resident Inspector Office Mr. John B. Rhodes, President and CEO, NYSERDA Ms. Bridget Frymire, New York State Dept. of Public Service

ENCLOSURE TO NL-15-007 CONSENT AND HEARING WAIVER FORM ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNITS NO. 1, 2 and 3 DOCKET NOs.50-003, 50-247, and 50-286

CONSENT AND HEARING WAIVER FORM Entergy Nuclear Operations, Inc., hereby agrees to comply with the terms and conditions of the Confirmatory Orders arising out of the Indian Point Units 1, 2, and 3, submittal dated August 20, 2013, as supplemented by letters dated November 21, 2013, and July 24, 2014, and citing letters dated April 27, 2011, and January 4, 2012. By signing below, Entergy Nuclear Operations, Inc., consents to the issuance of Confirmatory Orders EA-14-135 and EA-14-136, and by doing so, agrees to waive the right to request a hearing on all or any part of the Confirmatory Order.

LfawrenceA . Covie Date Site-Vic6 President Entergy Nuclear Operations, Inc.