ULNRC-06136, Third Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

From kanterella
(Redirected from ML14241A669)
Jump to navigation Jump to search
Third Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML14241A669
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/28/2014
From: Mclachlan M
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14241A667 List:
References
EA-12-051, ULNRC-06136
Download: ML14241A669 (4)


Text

~~

'WAmeren Callaway Plant MISSOURI August 28, 2014 ULNRC-06136 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR2.202 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 THIRD SIX MONTH STATUS REPORT IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO RELIABLE SPENT FUEL POOL INSTRUMENTATION (ORDER NUMBER EA-12-051)

References:

1. Letter dated March 12, 2012 from E. J. Leeds and M. R. Johnson, USNRC, to Adam C. Heflin, Callaway Plant, Union Electric Company, "Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation" (ADAMS Accession No. ML12056A044)
2. NRC Interim Staff Guidance JLD-ISG-2012-03, "Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation," Revision 0, August 29, 2012 (ADAMS Accession No. ML12221A339)
3. ULNRC-05925, "Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation," dated October 29, 2012
4. ULNRC-05960, "Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation," dated February 28, 2013
5. ULNRC-06026, "First Six-Month Status Report In Response to March 12, 2012 Commission Order Modifying Licenses With Regard To Reliable Spent Fuel Pool Instrumentation," dated August 29, 2013
                                                                                                                                                                                                                                                      • PO Box 620 Fulton, MO 65251 AmerenMi ssouri.com **************

STARS

  • Alliance

ULNRC-06136 August 28, 2014 Page2

6. ULNRC-06088, "Second Six-Month Status Report In Response to March 12, 2012 Commission Order Modifying Licenses With Regard To Reliable Spent Fuel Pool Instrumentation," dated February 26, 2014 On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued an order identified above as Reference 1 to Union Electric Company (dba Ameren Missouri) for Callaway Plant. Reference 1 was immediately effective and directs Ameren Missouri to have a reliable indication of water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 required submission of an initial status report 60 days following issuance of final interim staff guidance from the NRC (Reference 2) and an overall integrated plan pursuant to Section IV, Condition C. Reference 3 provided Ameren Missouri's initial status report regarding reliable spent fuel pool instrumentation. Reference 4 provided Ameren Missouri's Overall Integrated Plan.

Section IV, Condition C.2 of Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. NEI 12-02, "Industry Guidance for Compliance with NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation," provides direction regarding the content of the status reports. References 5 and 6 provided Ameren Missouri's first and second six-month status reports. The enclosure to this letter provides Ameren Missouri's third six-month status report pursuant to Section IV, Condition C.2 of Reference 1.

This letter does not contain new commitments.

If you have any questions concerning the content ofthis letter, please contact Scott Maglio, Regulatory Affairs Manager, at 573-676-8719.

I declare under penalty of perjury that the foregoing is true and correct.

Sincerely, Executed on:th.k<.....l--"£--=-+-'-d-+--r_

~J:.~

Sr. Director, Engineering

Enclosure:

Ameren Missouri's Third Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation

ULNRC-06136 August 28, 2014 Page 3 cc: Mr. Marc L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Eric Leeds Director, Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-13H16M Washington, DC 20555-0001 Mr. Jack Davis Director, Mitigation Strategies Directorate Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

ULNRC-06136 August 28, 2014 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F. M. Diya D.W. Neterer L. H. Graessle B. L. Cox S. A. Maglio T. B. Elwood J.T. Patterson J. L. Fortman D.M. Stepanovic E. M. Ptasznik D. R. Waller C. Fessler T. D. Jones Corporate Communications NSRB Secretary STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission