Third Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML14240A249
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/26/2014
From: Jamila Perry
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-051, LR-N14-0186
Download: ML14240A249 (7)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 PSEG Order EA-12-051 LR-N14-0186 AUG 2 6 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311

Subject:

PSEG Nuclear LLC's Third Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

References:

1. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012
2. PSEG Letter LR-N13-0020, "PSEG Nuclear LLC's Overall Integrated Plan for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051 ) , " dated February 28, 2013
3. PSEG Letter LR-N13-0176, "PSEG Nuclear LLC's First Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051 )," dated August 25, 2013
4. PSEG Letter LR-N14-0033, "PSEG Nuclear LLC's Second Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), " dated February 25, 2014

AUG 2 6 2014 Order EA-12-051 LR-N14-0186 Page 2 On March 12, 2012, the Nuclear Regulatory Commission (NRG) issued Order EA-12-051 (Reference 1) to PSEG Nuclear LLC (PSEG). Reference 1 was immediately effective and required submission of an Overall Integrated Plan (OIP) pursuant to Condition IV.C.1.a of the Order. Reference 2 provided the Salem Generating Station (SGS) Units 1 and 2 spent fuel level instrumentation OIP. Condition IV.C.2 of NRG Order EA-12-051 requires six-month status reports to delineate progress made in implementing the requirements of the Order. References 3 and 4 provided the first and second six-month status reports, respectively, for SGS. Enclosure 1 to this letter provides the third six-month status report of progress made in implementing the requirements of NRG Order EA-12-051 at SGS as of July 31, 2014. There are no changes in compliance method or issues requiring relief identified in Enclosure 1.

There are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please do not hesitate to contact Mr. Brian Thomas at 856-339-2022.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on -=- /-;;. G /

<'?- - 1 _..._

d-t'/t(

(D ate)

Sincerely, C,e;:;

ln F. Perry (/

Vice President - Salem Enclosure 1 - Salem Generating Station Third Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation cc: Director of Office of Nuclear Reactor Regulation Administrator, Region I, NRG Project Manager, NRG NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Manager IV, NJBNE Salem Commitment Tracking Coordinator PSEG Corporate Commitment Coordinator

AUG 2 6 2014 Order EA-12-051 LR-N14-0186 Page 3 (The bee list should not be submitted as part of the DCD submittal - remove this page prior to submittal and make the bee distribution accordingly) bee: President and Chief Nuclear Officer Senior Vice President and Chief Operating Officer Vice President - Salem Vice President, Operations Support Director - Nuclear Oversight Director - Regulatory Affairs Plant Manager - Salem Manager - Regulatory Assurance - Salem Senior Project Manager - Fukushima Site Improvements Project Manager - Licensing Document Control

ENCLOSURE 1 LR-N14-0186 Salem Generating Station Third Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation Salem Generating Station Units 1 and 2 PSEG Nuclear LLC

ENCLOSURE 1 LR-N14-0186

1. Introduction PSEG developed an Overall Integrated Plan (OIP) (Reference 1) for Salem Generating Station (SGS) Units 1 and 2, documenting the plan to meet the requirements to install reliable spent fuel pool instrumentation (SFPI) in response to NRC Order EA-12-051 (Reference 2). In References 3 and 4, respectively, PSEG provided the first and second six-month status reports associated with implementation of the requirements of NRC Order EA-12-051. This report is the third six month status report, which provides implementation status as of July 31, 2014. This status report follows the guidance in Appendix A to Nuclear Energy Institute (NEI) Report 12-02, Revision 1 (Reference 5),

which states that the six-month status reports should include any changes to the compliance method, schedule, and the need for relief and the basis for relief, if applicable. Sections 2 and 3 of this status report include milestone accomplishments and milestone schedule status, respectively. There are no changes to compliance method or requests for relief associated with this report.

2. Milestone Accomplishments As of July 31, 2014, the following milestones have been completed since the development of the SGS SFPI OIP.
  • Submit Integrated Plan: PSEG submitted the SGS SFPI OIP to the NRC.
  • Issue SFPI Equipment Purchase Order: PSEG issued a material purchase order to the SFPI vendor.
  • Begin Installation -SFPI installation activities have begun at Salem Units 1 and 2.
3. Milestone Schedule Status The following table provides an update of the milestone schedule provided in Section 3 of the SGS SFPI OIP, as well as additional milestones (e.g., six-month status reports, procedures, training and a completion report) that have been included for completeness. The table provides the activity status of each item, and the expected completion date noting any changes. The dates are planning dates subject to change as design and implementation details are finalized. Activities apply to both SGS Units 1 and 2, unless indicated otherwise.

Page 1 of 3

ENCLOSURE 1 LR-N14-0186 Revised Target Activity Target Milestone Completion Status Completion Date Date Conceptual Design Dec 2012 Complete Submit Overall Integrated Plan Feb 2013 Complete Aug 2013 Complete Feb 2014 Complete Six-Month Status Updates Aug 2014 Complete Feb 2015 Not Started Aug 2015 Not Started Issue SFPI Equipment Purchase 202013 Complete Order Design Change Package Complete Detailed Design - SGS Unit 1 102014 Started 302014 (Note 1)

Complete Detailed Design - SGS Unit 2 102015 Started 302014 (Note 1)

Begin Installation - SGS Unit 1 202014 Complete Begin Installation - SGS Unit 2 202015 Complete Installation Complete, SFPI 402014 Not Started Channels Fully Functional - Unit 1 Installation Complete, SFPI 402015 Not Started Channels Fully Functional - Unit 2 Implementation Outage - Unit 1 402014 Not Started Implementation Outage - Unit 2 402015 Not Started Procedures Issue Procedures - Unit 1 Nov 2014 Not Started Issue Procedures - Unit 2 Nov 2015 Not Started Training Complete Training - Unit 1 Nov 2014 Started Complete Training - Unit 2 Nov 2015 Started Submit Final Completion Report -

Feb 2016 Not Started Feb 2015 Unit 1 Submit Final Completion Report -

Feb 2016 Not Started Unit 2 Section 3 Table Notes:

1) The design change package for SGS Units 1 and 2 has been issued and is being revised pending finalization and PSEG approval of vendor documentation.

Page 2 of 3

ENCLOSURE 1 LR-N14-0186

4. Changes to Compliance Method There are no changes to the compliance method as documented in the SGS SFPI OIP.
5. Need for Relief/Relaxation and Basis for the Relief/Relaxation PSEG expects to fully comply with the order implementation date and no relief or relaxation is requested at this time.
6. Open Items from Overall Integrated Plan and Draft Safety Evaluation Open items from the NRC's Interim Staff Evaluation (Reference 6) are being addressed as part of the NRC audit process.
7. Potential Draft Safety Evaluation Impacts There are no potential draft safety evaluation impacts at this time.
8. References
1. PSEG Letter LR-N13-0020, "PSEG Nuclear LLC's Overall Integrated Plan for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051),"dated February 28, 2013
2. NRC Order Number EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," dated March 12, 2012
3. PSEG Letter LR-N13-0176, "PSEG Nuclear LLC's First Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051),"dated August 25, 2013
4. PSEG Letter LR-N14-0033, "PSEG Nuclear LLC's Second Six-Month Status Report for the Salem Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051 ),"dated February 25, 2014
5. NEI 12-02, "Industry Guidance for Compliance with NRC Order EA-12-051, 'To Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,"'

Revision 1, August 2012

6. NRC Letter to PSEG, "Salem Nuclear Generating Station, Units 1 and 2 - Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation (TAC NOS. MF0913 and MF0914),"dated October 17, 2013 Page 3 of 3