MONTHYEARNL-21-034, Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals2021-05-26026 May 2021 Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary NL-21-033, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2021-05-11011 May 2021 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-21-032, Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center2021-05-11011 May 2021 Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center NL-21-005, Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions2021-05-11011 May 2021 Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions NL-21-030, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NL-21-027, Registration of Spent Fuel Cask Use2021-04-20020 April 2021 Registration of Spent Fuel Cask Use NL-21-021, Registration of Spent Fuel Cask Use2021-04-19019 April 2021 Registration of Spent Fuel Cask Use NL-21-017, Pre-Notice of Disbursement from Decommissioning Trusts2021-04-0808 April 2021 Pre-Notice of Disbursement from Decommissioning Trusts NL-21-010, Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2021-02-17017 February 2021 Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-082, Notice of Planned Transfer of Decommissioning Funds2020-12-14014 December 2020 Notice of Planned Transfer of Decommissioning Funds NL-20-081, Pre-Notice of Disbursement from Decommissioning Trusts2020-12-0909 December 2020 Pre-Notice of Disbursement from Decommissioning Trusts NL-20-080, Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-93212020-11-19019 November 2020 Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-9321 NL-20-079, (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-12012 November 2020 (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NL-20-077, Submittal of Quality Assurance Program Manual Revision 22020-11-0909 November 2020 Submittal of Quality Assurance Program Manual Revision 2 NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-076, Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal2020-11-0202 November 2020 Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal NL-20-069, One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-10-0808 October 2020 One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-067, Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-09-16016 September 2020 Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-064, 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2020-09-0101 September 2020 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments NL-20-060, Status of Remaining Actions for Generic Letter 2004-022020-08-11011 August 2020 Status of Remaining Actions for Generic Letter 2004-02 NL-20-057, Cancellation of Commitment Related to Large Break LOCA Reanalysis2020-07-30030 July 2020 Cancellation of Commitment Related to Large Break LOCA Reanalysis NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-07-22022 July 2020 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center2020-07-0707 July 2020 Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center NL-20-052, Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results2020-07-0707 July 2020 Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-041, Registration of Unit 3 Spent Fuel Cask Use2020-05-13013 May 2020 Registration of Unit 3 Spent Fuel Cask Use NL-20-042, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2020-05-12012 May 2020 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-20-038, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-04-23023 April 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-035, Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-16016 April 2020 Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-034, Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-13013 April 2020 Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-03-24024 March 2020 Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-020, Submittal of 2019 Annual Fitness for Duty Performance Data Report Update2020-02-26026 February 2020 Submittal of 2019 Annual Fitness for Duty Performance Data Report Update NL-20-015, Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2020-02-10010 February 2020 Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane NL-19-094, 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2019-12-16016 December 2019 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-092, Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-11-20020 November 2019 Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-043, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122019-10-22022 October 2019 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-091, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use2019-10-17017 October 2019 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use NL-19-090, Registration of Unit 2 Spent Fuel Cask Use2019-10-0909 October 2019 Registration of Unit 2 Spent Fuel Cask Use NL-19-079, 50.59(d)(2) Summary Report of Changes, Tests and Experiments2019-09-26026 September 2019 50.59(d)(2) Summary Report of Changes, Tests and Experiments 2021-05-06
[Table view] |
Text
Enteray Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 254 6710 Robert Walpole Manager Regulatory Assurance NL-14-005 January 13, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Relief Request IP3-1SI-RR-07 for Code Case N-770-1 Weld Inspection Frequency Extension Indian Point Unit Number 3 Docket No. 50-286 License No. DPR-64
Dear Sir or Madam:
Entergy Nuclear Operations, Inc., (Entergy) is submitting Relief Request No. IP3-1SI-RR-07 (Attachment) for Indian Point Unit No. 3 (IP3). This relief request is for the Fourth 10-year Inservice Inspection Interval (ISI).
The purpose of this relief request is to extend the inspection of the reactor vessel cold leg nozzle to safe-end welds (1-4100-16(DM), 1-4200-16(DM), 1-4300-16(DM), 1-4400-16(DM)), which are Alloy 600 welds covered by Code Case N-770-1, Table 1, Inspection Item B. Baseline ultrasonic inspections of these welds were performed in March 2009 and met the Section XI, Appendix VIII requirements, including examination volume of essentially 100%. Table 1 of Code Case N-770-1 requires volumetric examination of essentially 100% of Inspection Item B pressure retaining welds once every second inspection period not to exceed 7 years. Additional circumstances have arisen affecting the scheduling for this request.
The requested extension is until Refueling Outage 20 (3R20) which is scheduled for Spring 2019.
This request is made in accordance with 10 CFR 50.55a(a)(3)(i), an alternative provides an acceptable level of quality and safety.
Entergy requests approval of the relief request by August 2014. Performance of this inspection in 3R18 would require planning to start at that time.
Ao-7
NL-14-005 Docket 50-286 Page 2 of 2 There are no new commitments being made in this submittal. If you have any questions or require additional information, please contact me at (914) 254-6710.
Sincerely, RW/ai
Attachment:
Relief Request IP3-ISI-RR- 07: Code Case N-770-1 Weld Inspection Frequency Extension cc: Mr. Douglas Pickett, Senior Project Manager, NRC NRR DORL Mr. William Dean, Regional Administrator, NRC Region 1 NRC Resident Inspectors Mr. Francis J. Murray, Jr., President and CEO, NYSERDA Ms. Bridget Frymire, New York State Dept. of Public Service C
ATTACHMENT TO NL-14-005 RELIEF REQUEST IP3-ISI-RR-07:
CODE CASE N-770-1 WELD INSPECTION FREQUENCY EXTENSION ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 DOCKET NO. 50-286
Attachment NL-14-005 Docket No. 50-286 Page 1 of 4 Indian Point Unit 3 Fourth 10-year ISI Interval Relief Request No: IP3-ISI-RR-07 Code Case N-770-1 Weld Inspection Frequency Extension Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(i)
-Alternative Provides Acceptable Level of Quality and Safety-
- 1. ASME Code Component(s) Affected The affected component is the Indian Point Unit 3 (IP3) reactor vessel cold leg nozzle to safe-end welds (1-4100-16(DM), 1-4200-16(DM), 1-4300-16(DM), 1-4400-16(DM)) which are Alloy 600 welds covered by Code Case N-770-1, Table 1, Inspection Item B.
These welds had an Alloy 600 inside diameter (ID) onlay installed during original fabrication and do not join any cast stainless steel materials.
Examination Cateaorv Item No. Description CC N-770-1 B Weld 1-4100-16(DM) Loop 31 cold leg nozzle to safe-end weld CC N-770-1 B Weld 1-4200-16(DM) Loop 32 cold leg nozzle to safe-end weld CC N-770-1 B Weld 1-4300-16(DM) Loop 33 cold leg nozzle to safe-end weld CC N-770-1 B Weld 1-4400-16(DM) Loop 34 cold leg nozzle to safe-end weld
2. Applicable Code Edition and Addenda
Code Case N-770-1 as referenced in 10CFR50.55a(g)(6)(ii)(F).
3. Applicable Code Requirement
Table 1 of Code Case N-770-1 requires volumetric examination of essentially 100% of Inspection Item B pressure retaining welds once every second inspection period not to exceed 7 years.
4. Reason for Request
Relief is being requested at this time to extend the cold leg weld inspections until Refueling Outage 20 (3R20) scheduled for Spring 2019 to allow for this inspection to coincide with the MRP-227-A reactor vessel internals inspections.
Attachment NL-14-005 Docket No. 50-286 Page 2 of 4 Examination of Item A-2 (Hotleg) and Item B (Coldleg) welds are performed from the inside surface of the pipe (ID) at IP3 due to limited access provisions from the outside surface of the pipe. The IP3 Item A-2 and Item B welds are located inside a "sandbox" which was installed during original plant construction after all welding was completed. As a result of physical interferences, the ultrasonic examinations of the welds cannot be performed from the outside diameter (OD). The inspection of the Item A-2 (Hotleg) welds from the ID does not require the removal of the reactor vessel core barrel, while the inspection of the Item B (Coldleg) welds from the ID does require removal of the reactor vessel core barrel.
Baseline inspections of Code Case N-770-1 Inspection Item B welds 1-4100-16(DM), 1-4200-16(DM), 1-4300-16(DM) and 1-4400-16(DM) were performed in March 2009. The ultrasonic examinations performed in 2009 met the Section Xl, Appendix VIII requirements, including examination volume of essentially 100%.
Welds 1-4100-16(DM), 1-4200-16(DM), and 1-4300-16(DM) had no recordable indications.
Weld 1-4400-16(DM) had a recordable circumferential indication in the vicinity of the Alloy 600 and stainless steel cladding interface near the dissimilar metal weld. The indication was determined to be entirely embedded in the Alloy 600 clad material and therefore not in the ASME Xl Code required examination volume. Since the indication was in the MRP-139 examination volume, a conservative approach was used and the indication was assessed in terms of the criteria in the ASME Code Section Xl, 1989 Edition, no Addenda, Article IWB-3000, Paragraph IWB-3500 (the code used at the time of inspection). The indication was found to be within the allowable limits specified in IWB-3500 with no further evaluation required.
Since inspection of these welds requires that the core barrel be removed from the reactor vessel, performing these inspections concurrently with the vessel shell weld inspections and the vessel internals inspections required by MRP-227-A during refuel outage in 2019 will result in personnel dose savings. A separate IP3 Relief Request IP3-1SI-RR-06 has been submitted to the NRC staff to allow deferral of the vessel shell weld inspections from 2015 to 2019.
IP3 is currently planning to perform the MRP-227-A (i.e. Vessel Internals) inspections in 3R20 (2019) since the actual inspection scope has not yet been finalized (i.e. Entergy is still performing internals evaluations in response to NRC RAIs and these evaluations have the potential to impact the MRP-227-A inspection scope). In addition, a significant pre-outage effort will be required to finalize inspection tooling and acceptance criteria which cannot be completed prior to 3R1 8 which is currently scheduled to begin in March 2015.
- 5. Proposed Alternative and Basis for Use 10 CFR 50.55a(a)(3) states:
"Proposed alternatives to the requirements of (c), (d), (e), (f), (g), and (h) of this section or portions thereof may be used when authorized by the Director of Nuclear Reactor Regulation. The applicant shall demonstrate that:
Attachment NL-14-005 Docket No. 50-286 Page 3 of 4 (i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety."
Entergy believes that the proposed alternatives of this request provide an acceptable level of quality and safety.
Indian Point Unit 3 proposes a one time extension to the Code Case N-770-1, Table 1, Inspection Item B, volumetric examinations from a period of 7 years to a period of 10 years. The inspections which are currently required to be performed will be performed not later than March 2019 refueling outage.
Based on the Primary Water Stress Corrosion Cracking (PWSCC) crack growth analysis results from Reference 2, the maximum allowable undetected flaw sizes for the reactor vessel inlet nozzle DM welds are tabulated below. These allowable undetected axial and circumferential flaw sizes have been shown to be acceptable in accordance with the ASME Section XI IWB-3640 acceptance criteria through the Spring 2019 RFO taking into account of potential PWSCC crack growth since the last volumetric examination during the Spring 2009 RFO. In accordance with the detection and sizing requirements in Supplement 10 of ASME Section Xl Appendix VIII pertaining to the qualification of inspection procedures, the minimum required detectable flaw depth is 10% of the wall thickness (i.e.0.25"). Therefore, based on the current inspection detection capability, these maximum allowable undetected flaw sizes are larger than the flaw sizes that could have been reasonably missed during the last volumetric examination of the RV inlet nozzle DM welds in Spring 2009 RFO. As a result, deferring the volumetric examination for the RV inlet nozzle DM welds from 7 years allowed by Code Case N-770-1 to 10 years is technically justified. This is because the maximum allowable undetected flaw sizes that have been shown to be acceptable for a service life of 10 years from the Spring 2009 RFO to Spring 2019 RFO in accordance with the ASME Section Xl IWB-3640 acceptance criteria are larger than the flaw sizes that might have been reasonably missed during the Spring 2009 RFO.
Maximum Allowable Undetected Flaw Sizes Axial Flaw Circumferential Flaw (Aspect Ratio = 2) (Aspect Ratio = 10)
Percent through wall (a/t) 0.38 0.41 Flaw Depth (inches) 0.95 1.025 Flaw Length (inches) 1.90 10.25 Minimum Detection 0.25 0.25 Capability (inches)
Attachment NL-14-005 Docket No. 50-286 Page 4 of 4
- 6. Duration of Proposed Alternative This request is applicable to Entergy's inservice inspection program for the fourth interval for Indian Point Unit 3. The proposed alternative is until March 2019.
- 7. References
- 1. Code Case N-770-1, Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of listed Mitigation ActivitiesSection XI, Division 1.
- 2. Westinghouse LTR-PAFM-1 3-115-P Rev. 0, "Technical justification to Support Extended Volumetric Examination Interval for Indian Point Generating Station Unit 3 Reactor Inlet Nozzle to Safe End Dissimilar Metal Welds," dated November, 2013.