LR-N14-0009, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Conducted During the Fall 2012 Nineteenth Refueling Outage
(Redirected from ML14010A428)
Jump to navigation
Jump to search
| ML14010A428 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 01/10/2014 |
| From: | Jamila Perry Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N14-0009 | |
| Download: ML14010A428 (9) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 JAN *1 0 2014 LR-N14-0009 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington DC 20555-001 Salem Nuclear Generating Station Unit 2 Renewed Facility Operating License No. DPR-75 NRC Docket No. 50-311 PS39%, which also removed the TSP wear indications in those tubes from service.
lndic 1901 26 1927 348 2
350 1553 24 1577