Person / Time | |
---|---|
Site: | Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, Big Rock Point, FitzPatrick File:Consumers Energy icon.png |
Issue date: | 11/04/2013 |
From: | Mccann J Entergy Nuclear Operations, Entergy Operations |
To: | Zimmerman R NRC/OE |
Arrighi R | |
References | |
EA-11-096, ENOC-13-00029 | |
Download: ML14002A120 (5) | |
Similar Documents at Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, Big Rock Point, FitzPatrick | |
---|---|
Category:Letter type:ENOC
MONTHYEARENOC-17-00005, ISFSI - Financial Test for Decommissioning Funding Parent Guarantee for the Year Ending December 31, 2016 Per 10 CFR Part 30 App. a2017-03-30030 March 2017
[Table view]ISFSI - Financial Test for Decommissioning Funding Parent Guarantee for the Year Ending December 31, 2016 Per 10 CFR Part 30 App. a ENOC-17-00006, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii)2017-03-30030 March 2017 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2016 - 10 CFR 50.82(a)(8)(vii) ENOC-16-00007, ISFSI - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2015, Per 10 CFR Part 30 App. a2016-03-30030 March 2016 ISFSI - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2015, Per 10 CFR Part 30 App. a ENOC-16-00008, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2015, Per 10 CFR 50.82(a)(8)(vii)2016-03-30030 March 2016 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2015, Per 10 CFR 50.82(a)(8)(vii) ENOC-15-00005, Decommissioning Funding Status Report Entergy Nuclear Operations, Inc2015-03-30030 March 2015 Decommissioning Funding Status Report Entergy Nuclear Operations, Inc ENOC-15-00006, ISFSI and Vermont Yankee - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2014 Per 10 CFR Part 30 App. a2015-03-27027 March 2015 ISFSI and Vermont Yankee - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2014 Per 10 CFR Part 30 App. a ENOC-15-00007, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 20142015-03-27027 March 2015 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2014 ENOC-14-00015, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Nuclear Operations, Inc. Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Nuclear Operations, Inc. Independent Spent Fuel Storage Installations ENOC-14-00016, Response to Request for Voluntary Response to 2.206 Petition Regarding Financial Qualifications,2014-07-24024 July 2014 Response to Request for Voluntary Response to 2.206 Petition Regarding Financial Qualifications, ENOC-14-00006, Entergy Nuclear Operations, Inc. - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2013 - 10 CFR 50.82(a)(8)(vii)2014-03-28028 March 2014 Entergy Nuclear Operations, Inc. - Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2013 - 10 CFR 50.82(a)(8)(vii) ENOC-14-00008, Entergy Nuclear Operations, Inc. - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2013 Per 10 CFR Part 30 App. a2014-03-28028 March 2014 Entergy Nuclear Operations, Inc. - Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2013 Per 10 CFR Part 30 App. a ENOC-14-00009, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2014-03-28028 March 2014 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ENOC-14-00004, Completion of Change to the Entergy Quality Assurance Manual Per Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Manual Per Confirmatory Order EA-11-096 ENOC-13-00028, Vermont, Notice of Change in Corporate Form of Energy Nuclear Holding Company2013-11-19019 November 2013 Vermont, Notice of Change in Corporate Form of Energy Nuclear Holding Company ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)2013-11-0404 November 2013 Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) ENOC-13-00023, Response to Request for Additional Information, 2013 Decommissioning Fund Status Report - Entergy Nuclear Operations, Inc2013-07-23023 July 2013 Response to Request for Additional Information, 2013 Decommissioning Fund Status Report - Entergy Nuclear Operations, Inc ENOC-13-00016, Response to Request for Additional Information Regarding 10 CFR 50.33 Financial Qualification Review2013-05-0606 May 2013 Response to Request for Additional Information Regarding 10 CFR 50.33 Financial Qualification Review ENOC-13-00007, Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report Per 10 CFR Section 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) - Entergy Nuclear Operations, Inc ENOC-13-00009, ISFSI Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 20122013-03-29029 March 2013 ISFSI Financial Test for Decommissioning Funding Parent Guarantees for the Year Ending December 31, 2012 ENOC-13-00011, Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii)2013-03-29029 March 2013 Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2012 - 10 CFR 50.82(a)(8)(vii) ENOC-13-00001, ISFSI Decommissioning Funding Plans (10 CFR 72.30) - Correction Notice2013-01-0808 January 2013 ISFSI Decommissioning Funding Plans (10 CFR 72.30) - Correction Notice ENOC-12-00039, ISFSI Decommissioning Funding Plans (10 CFR 72.30)2012-12-13013 December 2012 ISFSI Decommissioning Funding Plans (10 CFR 72.30) ENOC-12-00024, Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106 Section V. D. Review and Revision of EN-QV-1362012-08-0303 August 2012 Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106 Section V. D. Review and Revision of EN-QV-136 ENOC-12-00021, Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106, Section V.F. Assessment Plan Available for Review2012-06-21021 June 2012 Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106, Section V.F. Assessment Plan Available for Review ENOC-12-00018, Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106 Section V. B. Case Study Available for Review2012-05-23023 May 2012 Entergy Nuclear Operations, Inc., NRC Confirmatory Order EA-10-090, EA-10-248, EA-11-106 Section V. B. Case Study Available for Review ENOC-12-00017, Entergy Letter Dated May 22, 2012 Re EA-10-090, EA-10-248, EA-11-1062012-05-22022 May 2012 Entergy Letter Dated May 22, 2012 Re EA-10-090, EA-10-248, EA-11-106 ENOC-11-00021, Entergy Operations, Inc., Entergy Nuclear Operations, Inc., Submittal of Planned Reorganization of Quality Control Reporting Relationship2011-11-14014 November 2011 Entergy Operations, Inc., Entergy Nuclear Operations, Inc., Submittal of Planned Reorganization of Quality Control Reporting Relationship ENOC-11-00012, Entergy Nuclear Operations, Inc. - Response to Request for Additional Information to Support the Review of 2011 Decommissioning Funding Status Report2011-06-24024 June 2011 Entergy Nuclear Operations, Inc. - Response to Request for Additional Information to Support the Review of 2011 Decommissioning Funding Status Report ENOC-11-00010, Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark I Primary Containment Systems and Without Dedicated Class E1 Power for Cooling Elevated Irradiated Used Fuel Sto2011-05-24024 May 2011 Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark I Primary Containment Systems and Without Dedicated Class E1 Power for Cooling Elevated Irradiated Used Fuel Storage ENOC-11-00005, Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1)2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc., for Year Ending December 31, 2010 - 10 CFR 50.75(f)(1) ENOC-10-00040, Entergy Response for Action 3 of Confirmatory Order EA-09-0602010-11-0909 November 2010 Entergy Response for Action 3 of Confirmatory Order EA-09-060 ENOC-10-00034, Entergy Operations, Inc., and Entergy Nuclear Operations, Inc., Follow-up Action to NRC Enforcement Discretion Letter EA-09-190, Holtec Elimination of Multi-Purpose Canister (MPC) Shop Helium Leak Rate Test2010-11-0202 November 2010 Entergy Operations, Inc., and Entergy Nuclear Operations, Inc., Follow-up Action to NRC Enforcement Discretion Letter EA-09-190, Holtec Elimination of Multi-Purpose Canister (MPC) Shop Helium Leak Rate Test ENOC-10-00035, Entergy - Request for Withdrawal of Administrative License Amendments Relating to Application for Order Approving Indirect Transfer of Control of Licenses2010-10-14014 October 2010 Entergy - Request for Withdrawal of Administrative License Amendments Relating to Application for Order Approving Indirect Transfer of Control of Licenses ENOC-10-00030, Entergy Response for Action 6 of Confirmatory Order EA-09-0602010-09-0808 September 2010 Entergy Response for Action 6 of Confirmatory Order EA-09-060 ENOC-10-00018, Response to Confirmatory Order EA-09-060 from Entergy Operations, Inc2010-05-20020 May 2010 Response to Confirmatory Order EA-09-060 from Entergy Operations, Inc ENOC-10-00015, Response to NRC Confirmatory Order EA-09-060 from Entergy Nuclear Operations, Inc2010-04-22022 April 2010 Response to NRC Confirmatory Order EA-09-060 from Entergy Nuclear Operations, Inc ENOC-10-00010, Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 20092010-03-31031 March 2010 Entergy Nuclear Operations, Inc. - Status of Decommissioning Funding for Year Ending December 31, 2009 ENOC-10-00006, Submittal of Fitness-for-Duty Program Performance Report for January 2009 - December 20092010-03-0101 March 2010 Submittal of Fitness-for-Duty Program Performance Report for January 2009 - December 2009 ENOC-09-00038, Entergy Nuclear Operations, Inc. - Supplemental Information in Support of Request for Further Extension of Orders Approving Transfer of Control of Licenses and for Review of Trust Agreement Amendments2009-12-10010 December 2009 Entergy Nuclear Operations, Inc. - Supplemental Information in Support of Request for Further Extension of Orders Approving Transfer of Control of Licenses and for Review of Trust Agreement Amendments ENOC-09-00029, Entergy - Request for Further Extension of Orders Approving Transfer of Licenses and for Review of Trust Agreement Amendments for Pilgrim, Indian Point, FitzPatrick, Vermont Yankee, Palisades and Big Rock Point2009-11-0303 November 2009 Entergy - Request for Further Extension of Orders Approving Transfer of Licenses and for Review of Trust Agreement Amendments for Pilgrim, Indian Point, FitzPatrick, Vermont Yankee, Palisades and Big Rock Point ENOC-09-00034, Revised Decommissioning Funding Assurance Plan2009-10-29029 October 2009 Revised Decommissioning Funding Assurance Plan ENOC-09-00025, Entergy Nuclear Operations, Inc., Update Regarding Status and Request for Threshold Determination Under 10 CFR 50.802009-08-18018 August 2009 Entergy Nuclear Operations, Inc., Update Regarding Status and Request for Threshold Determination Under 10 CFR 50.80 ENOC-09-00024, Decommissioning Funding Assurance Plans2009-08-13013 August 2009 Decommissioning Funding Assurance Plans ENOC-09-00022, Entergy - Status of Decommissioning Funding Assurance2009-07-0606 July 2009 Entergy - Status of Decommissioning Funding Assurance ENOC-09-00021, Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses2009-05-29029 May 2009 Units 1, 2 & 3; James A. FitzPatrick; Vermont Yankee; Palisades; and Big Rock Point - Request for Extension of Orders Approving Transfer of Control of Licenses ENOC-09-00015, Request for Extension of Orders Approving Transfer of Control of Licenses2009-05-15015 May 2009 Request for Extension of Orders Approving Transfer of Control of Licenses ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions ENOC-09-00007, Status Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc. for Year Ending December 31, 2008 - 10 CFR 50.75(f)(1)2009-03-30030 March 2009 Status Decommissioning Funding for Plants Operated by Entergy Nuclear Operations, Inc. for Year Ending December 31, 2008 - 10 CFR 50.75(f)(1) ENOC-09-00005, Fitness-for-Duty Program Performance Report for the Period July 2008 - December 20082009-02-23023 February 2009 Fitness-for-Duty Program Performance Report for the Period July 2008 - December 2008 ENOC-08-00042, Entergy Operations, Inc. - Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 8052008-08-28028 August 2008 Entergy Operations, Inc. - Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 805 2017-03-30 Category:Manual MONTHYEARBVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024
[Table view]Biennial Update of Quality Assurance Program Manual ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 ML23095A3722023-04-0505 April 2023 2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal ML23095A3762023-04-0505 April 2023 Enclosure 4: Technical Requirements Manual (TRM) Revision 109 ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment ML22182A0762022-07-0101 July 2022 Resubmittal of the 2021 Annual Radioactive Effluent Release Report ML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G BVY 22-012, Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d)2022-04-12012 April 2022 Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) JAFP-21-0022, Technical Requirements Manual Specifications - Redacted2022-03-29029 March 2022 Technical Requirements Manual Specifications - Redacted W3F1-2021-0035, Technical Requirements Manual Update2021-05-18018 May 2021 Technical Requirements Manual Update 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description NL-21-029, Offsite Dose Calculation Manual (Odcm), Revision 52021-04-30030 April 2021 Offsite Dose Calculation Manual (Odcm), Revision 5 NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement NL-20-077, Submittal of Quality Assurance Program Manual Revision 22020-11-0909 November 2020 Submittal of Quality Assurance Program Manual Revision 2 ML20259A2132020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix B, Technical Requirements Manual (TRM) NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center2020-07-0707 July 2020 Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center ML20079J0952020-01-22022 January 2020 Emergency Implementation Procedure 2-001 Revision 28 NL-19-062, Registration of Spent Fuel Cask Use2019-07-0202 July 2019 Registration of Spent Fuel Cask Use ML19120A2152019-04-30030 April 2019 Submittal of the Entergy Pilgrim Quality Assurance Program Manual (QAPM) Pilgrim Nuclear Power Station (PNPS) 1CAN111802, ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2018-11-12012 November 2018 ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report PNP 2018-020, Offsite Dose Calculation Manual and Big Rock Point ISFSI - Attachment 2, 2017 Radioactive Effluent Release Report2017-12-18018 December 2017 Offsite Dose Calculation Manual and Big Rock Point ISFSI - Attachment 2, 2017 Radioactive Effluent Release Report W3F1-2017-0080, Submittal of Technical Requirements Manual Update2017-12-0606 December 2017 Submittal of Technical Requirements Manual Update ML17341A6652017-12-0606 December 2017 Technical Requirements Manual Update to the NRC ML18113A2472017-10-31031 October 2017 Enclosure 1 to Pnp 2018-020, Offsite Dose Calculation Manual, Revision 28 and Revision 29 ML17109A4872017-04-10010 April 2017 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G W3F1-2016-0040, Technical Requirements Manual Update to the NRC2016-06-0202 June 2016 Technical Requirements Manual Update to the NRC JAFP-16-0003, Transmittal of Emergency Plan Updates, Including Revision 28 to Section 1, Revision 27 to Section 27 and Revision 27 to Section 42016-01-12012 January 2016 Transmittal of Emergency Plan Updates, Including Revision 28 to Section 1, Revision 27 to Section 27 and Revision 27 to Section 4 ML16132A5102015-10-15015 October 2015 3 to EN-RW-102, Radioactive Shipping Procedure. ML16132A5072015-08-27027 August 2015 to EN-RW-105, Process Control Program. RBG-47603, Revisions to the Technical Requirements Manual and the Technical Specifications Bases2015-08-11011 August 2015 Revisions to the Technical Requirements Manual and the Technical Specifications Bases ML16132A5082015-04-0808 April 2015 to EN-RW-106, Integrated Transportation Security Plan. ML16132A5062015-04-0202 April 2015 2 to EN-RW-104, Scaling Factors. W3F1-2016-0038, UNT-005-014, Rev. 306, Offsite Dose Calculation Manual.2015-03-12012 March 2015 UNT-005-014, Rev. 306, Offsite Dose Calculation Manual. ML15086A1872015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm341 ML15086A1862015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm340 ML15086A1812015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/SEC2.0 ML15086A1822015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/SEC5.0 W3F1-2015-0023, Technical Requirements Manual/Trm Revision 128/Trm34122015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm3412 ML15086A2112015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm3411 ML15086A1882015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm343 ML15086A1892015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm344 ML15086A2032015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm346 ML15086A2042015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm347 ML15086A2052015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm348 ML15086A1832015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/SEC6.0 ML15086A2062015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trm349 ML15086A2082015-03-10010 March 2015 Technical Requirements Manual/Trm Revision 128/Trmbases 2024-05-22 |