ULNRC-06052, Supplemental Information Pursuant to 10 CFR 50.54(F) Re the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements

From kanterella
(Redirected from ML13331A572)
Jump to navigation Jump to search

Supplemental Information Pursuant to 10 CFR 50.54(F) Re the Seismic Hazard Walkdowns Conducted to Verify Current Plant Compliance with the Current Licensing Basis (CLB) for Seismic Requirements
ML13331A572
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/26/2013
From: Reasoner C
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML13331A659 List:
References
ULNRC-06052
Download: ML13331A572 (4)


Text

Cleve Reasoner

~~ Vice President Engineering WAmeren Ameren Missouri Callaway Energy Center T 573.676.8241 MISSOURI F 573.676.4056 November 26,2013 ULNRC-06052 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(£)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 SUPPLEMENTAL INFORMATION PURSUANT TO 10 CFR 50.54(f)

REGARDING THE SEISMIC HAZARD W ALKDOWNS CONDUCTED TO VERIFY CURRENT PLANT COMPLIANCE WITH THE CURRENT LICENSING BASIS (CLB) FOR SEISMIC REQUIREMENTS

References:

1. NRC Letter, "Request for Information Pursuant to Title 10 ofthe Code ofFederal Regulations 50.54(£) Regarding Recommendations 2.1, 2.3, and 9.3, ofthe Near-Term Task Force Review oflnsights from the Fukushima Dai-ichi Accident," dated March 12, 2012, ADAMS Accession No. ML12053A340
2. Electrical Power Research Institute (EPRI) Report 1025286, "Seismic Walkdown Guidance: For Resolution ofFukushima Near-Term Task Force Recommendation 2.3:

Seismic," dated 2012, ADAMS Accession No. ML12188A031

3. ULNRC-05935, "Ameren Missouri 180-Day Seismic Walkdown Response to NRC Letter, "Request For Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(£) Regarding Recommendations 2.1, 2.3, and 9.3, ofthe Near-Term Task Force Review of Insights From the Fukushima Dai-ichi Accident," dated November 27,2012, ADAMS Accession No. ML12347A132
4. NRC letter, "Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns," dated November 1, 2013, ADAMS Accession No. ML13304B418
                                                                                                                                                                                                                    • Junction CC & Hwy 0
                                                                                                                                                                                                                    • PO Box 620, MC CA-460 Fulton, MD 65251 AmerenMissouri.com

ULNRC-06052 November 26,2013 Page2 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a request for information (Reference 1). The letter requested licensees to conduct seismic hazard walkdowns to verify current plant configuration with the Current Licensing Basis (CLB). The NRC endorsed an Electric Power Research Institute (EPRI) guidance document (Reference 2), because the NRC staff determined that the use of the guidance, coupled with appropriate training, would meet the objectives and requests of the 50.54(f) letter.

By letter dated November 27, 2012 (Reference 3), Ameren Missouri responded to the information request for the Callaway Plant. On November 1, 2013, the NRC requested Ameren Missouri to provide additional information regarding seismic walkdowns (Reference 4). Enclosure 1 contains Ameren Missouri's response to Reference 4 for Callaway Plant. Please note that the date for Callaway's Refueling Outage 20 has moved from 10/4/2014 to 10/1112014.

This letter contains no new regulatory commitments.

If you have any questions regarding this submittal, please contact Scott Maglio, Regulatory Affairs Manager.

I declare under penalty of perjury that the foregoing is true and correct.

~~

Cleveland 0. Reasoner Vice President, Engineering Executed on:

Enclosure:

Supplemental Report to Support the NRC Review of Seismic Walkdown Inspections

ULNRC-06052 November 26,2013 Page 3 cc: Mr. Steven A. Reynolds Acting Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B I Washington, DC 20555-2738 Mr. Eric Leeds Director, Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-13H16M Washington, DC 20555-0001 Mr. Jack Davis Director, Mitigation Strategies Directorate Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

ULNRC-06052 November 26,2013 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III L. H. Graessle S. A. Maglio T. B. Elwood J. T. Patterson D. M. Stepanovic J. L. Fortman Corporate Communications NSRB Secretary STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission