RC-13-0134, License Amendment Request (LAR-13-01414) Change of the Completion Date of Implementation Milestone 8
| ML13281A193 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 10/03/2013 |
| From: | Gatlin T South Carolina Electric & Gas Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RC-13-0134, TAC ME4553 | |
| Download: ML13281A193 (6) | |
Text
Security - Related Information -
Thomas D. Gatlin Withhold Under 10 CFR 2.390 Vice President, Nuclear Operations "Cyber Sensitive" 803.345.4342 October 3, 2013 RC-1 3-0134 A SCANA COMPANY U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 LICENSE AMENDMENT REQUEST (LAR-13-01414)
CHANGE OF THE COMPLETION DATE OF IMPLEMENTATION MILESTONE 8
References:
- 1. Thomas D. Gatlin, SCE&G, Letter to the Document Control Desk, "Withdrawal and Resubmittal of License Amendment Request to Facility Operating License to Incorporate the Requirements of 10 CFR 73.54" dated August 5, 2010 (RC-10-0091) [ML102210197]
- 2. Thomas D. Gatlin, SCE&G, letter to the Document Control Desk, "Response to NRC Request for Additional Information Regarding License Amendment Request to Implement a Cyber Security Plan at Virgil C. Summer Nuclear Plant Station Unit 1" (TAC NO. ME4553) dated March 28, 2011 (RC-11-0035) (ML110880321]
- 3. Robert E. Martin, NRC, Letter to Thomas D. Gatlin, SCE&G, "Virgil C. Summer Nuclear Station, Unit No. 1, Issuance of Amendment Regarding Cyber Security Plan" dated August 24, 2011 [TAC NO. ME4553]
- Robert E. Martin, NRC, Letter to Thomas D. Gatlin, SCE&G, "Virgil C. Summer Nuclear Station, Unit No. 1, Correction of Safety Evaluation Regarding Cyber Security Plan License Amendment" dated July 12, 2012 [ML12184A130]
South Carolina Electric & Gas Company (SCE&G), acting for itself and as an agent for South Carolina Public Service Authority pursuant to 10 CFR 50.4 and 10 CFR 50.90, hereby submits a request to change the Cyber Security Plan. The VCSNS Cyber Security Plan, Revision 0 was previously provided. in Reference 1 and was approved by the NRC in Reference 3.
SCE&G considers the Enclosure and Attachment 3 to be sensitive information and requests that it be withheld from public disclosure pursuant to 10 CFR 2.390. The proposed change is a request to revise the scheduled completion date of the Cyber Security Plan (CSP).
Enclosure and Attachment 3 transmitted herewith contains security related Information to be Withheld Under 10 CFR 2.390. When Separated from this Enclosure and Attachment 3, this transmittal Document is decontrolled.
Virgil C. Summer Station
- Post Office Box 88.Jenkinsville, SC - 29065 -F (803) 941-9776 0 1
Document Control Desk CR-13-01414 RC-1 3-0134 Page 2 of 2 The proposed changes have been evaluated in accordance with 10 CFR 50.91 (a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that the changes involve no significant hazards consideration.
Approval of the proposed amendment is requested by October 3, 2014. Once approved, the amendment shall be implemented within 60 days.
In accordance with 10 CFR 50.91, SCE&G is notifying the State of South Carolina of this LAR by transmitting a copy of this letter and enclosure to the designated State Official. The proposed change has been reviewed and approved by both the VCSNS Plant Safety Review Committee and the VCSNS Nuclear Safety Review Committee.
There are no new commitments made by this letter. If there are any questions or if additional information is needed, please contact Mr. Bruce L. Thompson at (803) 931-5042.
I certify under penalty of perjury that the foregoing is correct and true.
Exc,/3 tdo Exeecuted on Thomas D. Gatlin RP/TDG/bq
Enclosure:
Evaluation of the Proposed Change (Contains SRI)
Attachments:
- 1. Proposed VCSNS Operating License Changes (Mark-up)
- 2. Revised VCSNS Operating License Page
- 3. Revised Cyber Security Plan Implementation Schedule (Contains SRI) c:
Without 2.390 Attachment unless noted K. B. Marsh S. A. Byrne J. B. Archie N. S. Cams J. H. Hamilton J. W. Williams W. M. Cherry V. M. McCree (with Attachment)
S. A. Williams (with Attachment)
NRC Resident Inspector S. E. Jenkins Paulette Ledbetter K. M. Sutton INPO Records Center NSRC RTS (CR-13-01414)
File (813.20)
PRSF (RC-13-0134) (with Attachment)
Document Control Desk CR-13-01414 RC-1 3-0134 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit I DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT I Proposed VCSNS Operating License Changes (Mark-Up)
Document Control Desk CR-13-01414 RC-13-0134 Page 2 of 2 11a-D.
An exemption to the requirements of Paragraph 1t1.8.4 of Appendix G to 10 CFR Part 50 is described in Section 5.3.1 of Supplement No. 1 to the Office of Nuclear Reactor Regulation's Safety Evaluation Report. A limited exemption to the equiremerft of Section WV.F. I(b) of Appendix E to 10 CFR Part 50 Is des:ibed In a letter from B.J.
Youngblood, NRC to O.W. Dixon. Jr. dated November 2,1982. Thesm exemptions are authorized by taw and will not endainger Fie or property or the connon dfnse and security and are otherwise in the public interest. The faciiy will operate, to the extert authorized heren In confmrlty with the application, as amrened. the provisions of the Act, and the nulas and regulaborns of the Commission.
E.
SCE&G shal fuly implement and maintain in effect all provisions of the Con.mrssa$-proved physical seCurity, rairdng and quaication. and safeguards conoruency plans incul nerg amencirmnts made pursuant to piovisions of the Misceltaneous Amendments and Search Requkemerits revsions to 10 CFR 73-55 (51 FR 278a17 and 27822) and to the
'uthotlty of 10 CFR 50.90 and 10 CFR 50.54(p).
The combined W of pians, which contaln Safeguards Information protected unxter 10 CFR 7321. Is enti*led- "Virl C-Summer Nuclear Station Securtty Plan, as updated through May 15, 2006. This document includes the Sectuity Training and Quaitfcation Plan as Appendix B and the Safeguards Contingency Plan asAppendix C.
SCE&G shati fully Implemren and maiitain in effect all provisona of th, Co slon-approved cybe, secury plan (CSP). ircluding change made pursuant to the &Athorlty of 10 CFR 50.90 and 10 CFR 50.54(p). The SCE&G CSP was approved by License Amerdnxwa No. 4.s-Renrwd Facility Operating License NPF-12 License Amendmert No. 9e-
Document Control Desk CR-1 3-01414 RC-1 3-0134 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit I DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT 2 Revised VCSNS Operating License Page
-11a-D.
An exemption to the requirements of Paragraph III.B.4 of Appendix G to 10 CFR Part 50 is described in Section 5.3.1 of Supplement No. 1 to the Office of Nuclear Reactor Regulation's Safety Evaluation Report. A limited exemption to the requirements of Section IV.F.1(b) of Appendix E to 10 CFR Part 50 is described in a letter from B. J. Youngblood, NRC to 0. W. Dixon, Jr., dated November 2, 1982. These exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. The facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E.
SCE&G shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Virgil C.
Summer Nuclear Station Security Plan," as updated through May 15, 2006. This document includes the Security Training and Qualification Plan as Appendix B and the Safeguards Contingency Plan as Appendix C.
SCE&G shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The SCE&G CSP was approved by License Amendment No.
Renewed Facility Operating License No. NPF-12 License Amendment No.