Other: ML14009A481, ML15182A175, ML15289A065, ML16014A734, NL-13-1762, First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), NL-15-0239, Fourth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051), NL-15-0243, Fourth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), NL-15-1156, Fifth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)
|
|
|
---|
Category:Letter type:NL
MONTHYEARNL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-23-0295, Reply to a Notice of Violation; EA-22-1012023-05-0101 May 2023 Reply to a Notice of Violation; EA-22-101 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0213, Inservice Inspection Program Owner'S Activity Report for Outage 1R312023-03-21021 March 2023 Inservice Inspection Program Owner'S Activity Report for Outage 1R31 NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0080, Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02023-02-0202 February 2023 Response to Request for Additional Information (RAI) Related to Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-23-0008, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting.2023-01-17017 January 2023 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting. NL-23-0011, Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only2023-01-0505 January 2023 Update to Supporting Documentation Regulatory Conference EA-22-101. Cover Letter Only NL-22-0799, License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52022-12-20020 December 2022 License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 NL-22-0897, Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A,2022-12-0909 December 2022 Supplement to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, NL-22-0887, Cycle 32 Core Operating Limits Report2022-11-21021 November 2022 Cycle 32 Core Operating Limits Report NL-22-0884, Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-1012022-11-17017 November 2022 Response to NRC Inspection Report 05000348/2022440 and 05000364/2022440 EA-22-101 NL-20-0170, Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC2022-10-14014 October 2022 Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC NL-22-0756, Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.02022-09-30030 September 2022 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 NL-22-0289, License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis2022-09-21021 September 2022 License Amendment Request to Revise Technical Specification 4.3 Fuel Storage to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis NL-22-0608, Interim 10 CFR 21.21(a)(2) Report Regarding Framatome Supplied Siemens Medium Voltage Circuit Breakers2022-08-17017 August 2022 Interim 10 CFR 21.21(a)(2) Report Regarding Framatome Supplied Siemens Medium Voltage Circuit Breakers NL-22-0552, Inservice Inspection Program Owner'S Activity Report for Outage 2R282022-07-28028 July 2022 Inservice Inspection Program Owner'S Activity Report for Outage 2R28 NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value2022-06-30030 June 2022 License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value NL-22-0361, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak.2022-06-20020 June 2022 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak. NL-22-0362, Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2022-06-0101 June 2022 Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update NL-22-0388, Cycle 29 Core Operating Limits Report2022-05-31031 May 2022 Cycle 29 Core Operating Limits Report NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-22-0340, Response to Request for Additional Information Related to Request for License Amendment to Relocate Augmented Piping Inspection Program Details from Technical2022-05-10010 May 2022 Response to Request for Additional Information Related to Request for License Amendment to Relocate Augmented Piping Inspection Program Details from Technical NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations 2024-01-11
[Table view] |
Text
B. L. "Pete" Ivey Southern Nuclear Vice President Operating Company, Inc.
Regulatory Affairs 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 Tel 205.992 .7619 Fax 205 .992.521 7 5 August 27, 2013 Docket Nos.: 50-348 NL-13-1762 50-364 U. S. Nuclear Regulatory Commission AnN: Document Control Desk Washington , D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Units 1 and 2 First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strateg ies for 8eyond-Design-8asis External Events (EA-12-049)
References:
- 1. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for 8eyond-Design-8asis External Events, dated March 12, 2012
- 2. NRC Interim Staff Guidance JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for 8eyond-Design-8asis External Events, Revision 0, dated August 29, 2012
- 3. NEI 12-06, Diverse and Flexible Coping Strategies (FLEX)
Implementation Guide, Revision 0, dated August 2012
- 4. Joseph M. Farley Nuclear Plant - Units 1 and 2 Initial Status Report in Response to Commission Order with Regard to Mitigation Strategies for 8eyond-Design-8asis External Events (EA-12-049), dated October 23, 2012
- 5. Joseph M. Farley Nuclear Plant - Units 1 and 2 Overall Integrated Plan in Response to Commission Order with Regard to Mitigation Strategies for 8eyond-Design-8asis External Events (EA-12-049), dated February 27,2013 Ladies and Gentlemen:
On March 12,2012, the Nuclear Regulatory Commission (NRC) issued an order (Reference 1) to Southern Nuclear Operating Company. Reference 1 was immediately effective and directs the Joseph M. Farley Nuclear Plant - Units 1 and 2 (FNP) to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event. Specific requirements are outlined in Attachment 2 of Reference 1.
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an overall integrated plan pursuant to Section IV, Condition C.1.a of Reference 1.
Reference 2 endorses industry guidance document NEI 12-06, Revision 0 (Reference 3) with clarifications and exceptions identified in Reference 2.
U. S: Nuclear Regulatory Commission NL-13-1762 Page 2 Reference 4 provided the Ft\lP initial status report regarding mitigation strategies.
Reference 5 provided the FNP overall integrated plan.
Reference 1 requires submission of a status report at six-month intervals following submittal of the overall integrated plan. Reference 3 provides direction regarding the content of the status reports. The purpose of this letter is to provide the first six-month status report pursuant to Section IV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference 1. The enclosed report provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief and the basis, if any.
This letter contains no NRC commitments. If you have any questions, please contact John Giddens at 205.992.7924.
Mr. B. L. Ivey states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true.
Respectfully submitted, Mr. B. L. Ivey Vice President - Regulatory Affairs BLl/CLN/lac Sworn to and subscribed before me this ~ay of A0j U-7+ ,2013.
1/!lv1Ar~rh'~1-k~u~
N ary Public My commission expires: Ma,)r-c"n '2- ~ 1.J 0JLf
Enclosure:
Joseph M. Farley Nuclear Plant - Units 1 and 2 First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. T. A. Lynch, Vice President - Farley Mr. C. R. Pierce, Regulatory Affairs Director Mr. B. J. Adams, Vice President - Fleet Operations RType: CVC7000
U. S. Nuclear Regulatory Commission NL-13-1762 Page 3 U. S. Nuclear Regulatory Commission Mr. E. Leeds, Director of the Office of Nuclear Reactor Regulations Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager - Farley Mr. P. K. Niebaum, Senior Resident Inspector - Farley Mr. J. R. Sowa, Senior Resident Inspector - Farley Ms. J. A. Kratchman , NRRlJLD/PMB Mr. E. E. Bowman, NRRlDPRlPGCB Alabama Department of Public Health Dr. D. E. Williamson, State Health Officer
Joseph M. Farley Nuclear Plant - Units 1 and 2 First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)
Enclosure Joseph M. Farley Nuclear Plant - Units 1 and 2 First Six-Month Status Report of the Implementation of the .
Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)
Enclosure to NL-13-1762 First Six-Month Status Report of FLEX Implementation Joseph M. Farley Nuclear Plant - Units 1 and 2 First Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049) 1 Introduction Joseph M. Farley Nuclear Plant - Units 1 and 2 developed an Overall Integrated Plan (Reference 1 of this enclosure), documenting the diverse and flexible strategies (FLEX), in response to Reference 2. This attachment provides an update of milestone accomplishments since submittal of the Overall Integrated Plan, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.
2 Milestone Accomplishments In addition to the submittal of status reports, the following milestone(s) directly related to FLEX implementation have been completed since the development of the Overall Integrated Plan (Reference 1), and are current as of June 30, 2013:
- None 3 Milestone Schedule Status The following provides an update to Attachment 2 of the Overall Integrated Plan. It provides the activity status of each item, and whether the expected completion date has changed. The dates are planning dates subject to change as design and implementation details are developed. The revised milestone target completion date does not impact the Order implementation date.
Target Revised Target Activity Milestone Completion Completion Status Date Date Submit 60 Day Status Report Oct 2012 Complete N/A Submit Overall Integrated Plan Feb 2013 Complete N/A Unit 21st RFO May 2013 Complete N/A Complete Submit 6 Month Status Report Aug 2013 (see Sec. 2)
N/A Initiate Phase 2 Equipment Procurement Sep 2013 Started Develop Strategies (Playbook) with RRC Nov 2013 Started Jun 2014 Develop Operational Procedure Changes Dec 2013 Started Develop Modifications Jan 2014 Started Submit 6 Month Status Report Feb 2014 Not Started Develop Training Material Mar 2014 Started Submit 6 Month Status Report Aug 2014 Not Started Issue FSGs Sep 2014 Not Started Implement Training Nov 2014 Not Started Unit 2 Walk-throuQhs or Demonstrations l\Jov 2014 Not Started Unit 2 Implementation Outage
- Nov 2014 Not Started Submit 6 Month Status Report Feb 2015 Not Started Unit 1 Walk-throughs or Demonstrations A~ 2015 Not Started Unit 1 Implementation OutaQe
- Apr 2015 Not Started Submit Completion Report Spring 2015 Not Started
- Full compliance after second listed refueling outage Page 1
Enclosure to NL-13-1762 First Six-Month Status Report of FLEX Implementation 4 Changes to Compliance Method There are no changes to the compliance method as documented in the Overall Integrated Plan (Reference 1 of this enclosure).
5 Need for Relief/Relaxation and Basis for the Relief/Relaxation Joseph M. Farley Nuclear Plant - Units 1 and 2 expects to comply with the order implementation date and no relief/relaxation is required at this time.
6 Open Items from Overall Integrated Plan and Draft Safety Evaluation The following tables provide a summary of the open items documented in the Overall Integrated Plan or the Draft Safety Evaluation (SE) and the status of each item.
Overall Integrated Plan Open Item Status
- 1. Structure, content and details of the Regional SAFER Team developing Pilot Response Center playbook will be determined. Playbook Draft Safety Evaluation Open Item Status None Received to date N/A 7 Potential Draft Safety Evaluation Impacts There are no potential impacts to the Draft Safety Evaluation identified at this time.
8 References The following references support the updates to the Overall Integrated Plan described in this enclosure.
- 1. Joseph M. Farley Nuclear Plant - Units 1 and 2 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)," dated February 27, 2013.
- 2. NRC Order Number EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events,"
dated March 12, 2012.
9 Other Additional Information The following information provides clarity or corrections to the Overall Integrated Plan but do not constitute a change in strategy:
Page 2
Enclosure to NL-13-1762 First Six-Month Status Report of FLEX Implementation
- 1. The following Key Parameters instrument numbers have been changed:
Steam Generator Essential Instrumentation Safety Function AFW Flow to SGs (FEI-3229A, B, & C) Core Cooling Condensate Storage Tank Essential Instrumentation Safety Function CST Level (LI-~ 132A and LI-&ia4132B) Core Cooling
- 2. The Accumulator discharge isolation valves are not required to be powered by FLEX DGs under the strategy.
- 3. The primary borated water source is approximately 11,000 gallons of highly borated water available in the Boric Acid Storage Tanks (BAST/BAT) versus the 2,000 gallons stated in the February 27,2013 Overall Integrated Plan submittal.