NL-13-071, Entergy, Actions Required Prior to Entry Into Period of Extended Operation Associated with License Renewal Application (LRA) for Indian Point Energy Center Unit 2

From kanterella
(Redirected from ML13142A203)
Jump to navigation Jump to search
Entergy, Actions Required Prior to Entry Into Period of Extended Operation Associated with License Renewal Application (LRA) for Indian Point Energy Center Unit 2
ML13142A203
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/01/2013
From: Dacimo F
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-13-071
Download: ML13142A203 (4)


Text

vEn tergy Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, N.Y. 10511-0249 Tel (914) 254-2055 Fred Dacimo Vice President License Renewal NL-13-071 May 1, 2013 Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-P1-17 Washington, D.C. 20555-0001

Subject:

Enterfly Actions Required Prior to Entry into Period of Extended Operation Associated with License Renewal Application (LRA) for Indian Point Energy Center Unit 2 Indian Point Nuclear Generating Unit No. 2 Docket No. 50-247 License No. DPR-26

References:

1) Entergy Letter dated April 23, 2007, F. R. Dacimo to Document Control Desk, "License Renewal Application" (NL-07-039)
2) Entergy Letter dated April 23, 2007, F. R. Dacimo to Document Control Desk, "License Renewal Application Boundary Drawings" (NL-07-040)
3) Entergy Letter dated April 23, 2007, F. R. Dacimo to Document Control Desk, "License Renewal Application Environmental Report References" (NL-07-041)

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. ("Entergy") applied for renewal of the Indian Point Nuclear Generating Unit Nos. 2 and 3 operating licenses in April 2007 (References).

The Unit 2 operating license expires on September 28, 2013. The license renewal application ("Application") for both Units 2 and 3 is currently under review by the Nuclear Regulatory Commission ("NRC") Staff.

As NRC's review and approval of the Application will not be completed prior to the expiration of the Unit 2 Operating License, Entergy will take the following two actions to ensure full implementation of its license renewal commitments, as documented in the Application, prior to entering the Unit 2 period of extended operation ("PEO").

A

NL-13-071 Docket Nos. 50-247 Page 2 of 2 Action By the end of August 2013, Entergy will submit a letter to the NRC confirming implementation of Unit 2 license renewal commitments required to be implemented prior to entry into the PEO i.e., by September 28, 2013. Entergy will reference the list of commitments included in the second Safety Evaluation Report ("SER") supplement scheduled for July 2013. In the event that the NRC does not issue the second SER supplement on schedule, Entergy will reference an alternate document containing the most current list of commitments.

Action By September 28, 2013, Entergy will submit a letter to the NRC confirming that the Unit 2 Updated Final Safety Analysis Report ("UFSAR") has been updated to implement the Unit 2 aging management programs into the licensing basis.

The attachment to this letter summarizes the commitments made in this response. If you have any questions concerning this submittal, or require additional information, please contact Mr. Robert Walpole at 914-254-6710.

Sinc eY, FRD/aas cc: Mr. William Dean, Regional Administrator, NRC Region 1 Mr. David Wrona, NRC Branch Chief, Division of License Renewal Ms. Lois James, NRC Environmental Project Manager, IPEC License Renewal Mr. Nathaniel Ferrer, NRC Project Manager, Division of License Renewal Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Mr. Douglas Pickett, Senior Project Manager, NRC NRR DORL Ms. Bridget Frymire, New York State Dept. of Public Service Mr. Francis J. Murray, Jr., President & CEO, NYSERDA NRC Resident Inspectors

ATTACHMENT TO NL-13-071 LIST OF REGULATORY COMMITMENTS ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO. 50-247

NL-13-071 Docket No. 50-247 Attachment Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document.

Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check one) SCHEDULED ONE-TIME CONTINUING COMPLETION DATE COMMITMENT ACTION COMPLIANCE (if Required)

Submit a letter to the NRC confirming complete implementation of Unit 2 license X August 2013 renewal commitments required to be implemented prior to entry into the PEO.

Modify the Unit 2 Updated Final Safety Analysis Report ("UFSAR"). Incorporate X September 28, Unit 2 material set forth in Appendix A of 2013 the Application into both a new appendix to the Unit 2 UFSAR, as well as updating corresponding sections of the USFAR with new or modified information and programs.

Transmit a letter to the NRC confirming that this has been completed.