NRC 2013-0034, Notification of Readiness for NRC 95001 Inspection

From kanterella
(Redirected from ML13108A121)
Jump to navigation Jump to search
Notification of Readiness for NRC 95001 Inspection
ML13108A121
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/16/2013
From: Meyer L
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2013-0034
Download: ML13108A121 (1)


Text

NExTera ENERGY Q BEACH April 16, 2013 NRC 2013-0034 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Notification of Readiness for NRC 95001 Inspection

Reference:

NRC letter to NextEra Energy Point Beach, LLC, dated January 2, 2013, Final Significance Determination of a White Finding with Assessment Followup and Notice of Violation; NRC Inspection Report No. 05000266/2012010; Point Beach Nuclear Plant, Unit 1 (ML13004A280)

By letter dated January 2, 2013 (Reference), the Nuclear Regulatory Commission (NRC) informed NextEra Energy Point Beach, LLC (NextEra) of plans for a future inspection of Point Beach Nuclear Plant (PBNP), in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. The associated finding involved the failure to have work instructions and procedures appropriate to the circumstances to ensure that, following the final alignment of the turbine to the Unit 1 turbine-driven auxiliary feedwater pump during a refueling outage in November 2011, no additional work was performed on the turbine that would affect the overall final alignment. This ultimately resulted in failure of the turbine-to-pump coupling.

This letter is to notify the NRC that PBNP is ready for the IP 95001 supplemental inspection.

Accordingly, NextEra requests the NRC to commence the 95001 inspection on August 5, 2013.

This letter contains no new Regulatory Commitments and no revisions to existing Regulatory Commitments.

Very truly yours, NextEra Energy Point Beach, LLC

ý:Meyer Site Vice President cc: Administrator, Region III, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Branch Chief, Engineering Branch 2, Region III, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Branch Chief, Reactor Projects Branch 5, Region Ill, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241