Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 0 PSEG1 Nu clear [i. C NOV 2 6 2012 10 CFR 50.54(f)
LR-N 12-0370 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Salem Generating Station, Units I and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311
Subject:
Salem Generating Station Response to Recommendation 2.3: Flooding Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident
References:
(1)
US Nuclear Regulatory Commission (NRC) letter dated March 12, 2012, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident" (2)
PSEG Letter LR-N12-0170 dated June 7, 2012, "PSEG Nuclear LLC's Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident" (3)
NEI 12-07 Revision 0-A dated May 2012, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features" On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a request for information (Reference 1) to PSEG Nuclear LLC (PSEG). Reference 1 includes a request for PSEG to perform flooding walkdowns using NRC-endorsed walkdown methodology. By letter dated June 7, 2012 (Reference 2) PSEG confirmed that it would use the NRC-endorsed flooding walkdown guidance in NEI 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features" (Reference 3).
V 0
LR-N12-0370 10 CFR 50.54(f)
Page 2 provides the requested flooding walkdown report for the Salem Generating Station, Units 1 and 2.
There are no regulatory commitments contained in this transmittal. If you have any questions or require additional information, please do not hesitate to contact Mrs. Emily Bauer at 856-339-1023.
I declare under penalty f perjury that the foregoing is true and correct.
Executed on
"(Date)
S inc re o
a rricker Sit Vice President Salem Generating Station Enclosure (1) cc:
Mr. E. Leeds, Director of Office of Nuclear Reactor Regulation Mr. W. Dean, Administrator, Region I, NRC Mr. J. Hughey, Project Manager, NRC NRC Senior Resident Inspector, Salem Mr. P. Mulligan, Manager IV, NJBNE Salem Commitment Tracking Coordinator PSEG Commitment Coordinator-Corporate LR-N 12-0370 0 PSEG NUCLEAR LLC Salem Generating Station Units 1 & 2 SGS Flood Walkdown Report 10 CFR 50.54(f) Section 2.3 (Flood) Response