LR-N12-0371, Response to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident

From kanterella
(Redirected from ML12334A353)
Jump to navigation Jump to search
Response to Recommendation 2.3: Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident
ML12334A353
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/26/2012
From: Jamila Perry
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N12-0371
Download: ML12334A353 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 SECURITY-RELATED INFORMATION -

WITHHOLD UNDER 10 CFR 2.390 0 PSEG Nuclear LLC NOV 26 2012 10 CFR 50.54(f)

LR-N12-0371 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354

Subject:

Hope Creek Generating Station Response to Recommendation 2.3:

Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident

References:

(1)

US Nuclear Regulatory Commission (NRC) letter dated March 12, 2012, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident" (2)

PSEG Letter LR-N12-0204 dated July 9, 2012, "PSEG Nuclear LLC's 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident" (3)

NRC letter dated May 31, 2012, "Endorsement of Electric Power Research Institute (EPRI) Draft Report 1025286, 'Seismic Walkdown Guidance"'

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a request for information (Reference 1) to PSEG Nuclear LLC (PSEG). Reference 1 includes a request for PSEG to perform seismic walkdowns using NRC-endorsed walkdown methodology. By letter dated July 9, 2012 (Reference 2) PSEG confirmed that it would use the seismic walkdown guidance in EPRI 1025286, "Seismic Walkdown Guidance:

For Resolution of Fukushima Near-Term Task Force Recommendation, 2.3: Seismic," as L(

0

SECURITY-RELATED INFORMATION -- WITHHOLD UNDER 10 CFR 2.390 LR-N12-0371 10 CFR 50.54(f)

Page 2 endorsed by the NRC in Reference 3. Enclosure 1 provides the requested seismic walkdown report for the Hope Creek Generating Station. Enclosure 2 contains the PSEG regulatory commitments associated with this transmittal. Any other statements in this transmittal are provided for information and are not regulatory commitments. to Enclosure 1 is considered sensitive, unclassified (non-safeguard) information in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding." As such, PSEG requests that the information contained in the attachment be withheld from public disclosure.

If you have any questions or require additional information, please do not hesitate to contact Mrs. Emily Bauer at 856-339-1023.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on z

-e

- /,,2-(Date)

Sincerely, John F. Perry Site Vice President Hope Creek Generating Station Enclosures (2) cc:

Mr. E. Leeds, Director of Office of Nuclear Reactor Regulation Mr. W. Dean, Administrator, Region I, NRC Mr. J. Hughey, Project Manager, NRC NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Manager IV, NJBNE Hope Creek Commitment Tracking Coordinator PSEG Commitment Coordinator - Corporate LR-N12-0371 PSEG NUCLEAR (PSEG)

Hope Creek Nuclear Generating Station Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Report SL-011553 Revision 1 The signatures below document PSEG Nuclear LLC management review of this document:

PSERsponse Manager DAte Date C/ectrcjiet A4plrovl ?O~e-?7/V3-OaOS Hope Creek Mechanical / Structural Design Engineering Manager to Enclosure 1 is considered sensitive, unclassified (non-safeguard) information in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding." As such, PSEG requests that the information contained in the attachments be withheld from public disclosure.