ML12305A423

From kanterella
Jump to navigation Jump to search
Readiness for 95001 Supplemental Inspection
ML12305A423
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 10/30/2012
From: Enright D
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
BW120108
Download: ML12305A423 (1)


Text

Exelon Generation Company, LLC ww.exeloncorp.com Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407*9619 October 30,2012 BW120108 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Unit 2 Facility Operating License No. NPF-77 NRC Docket No. STN 50-457

Subject:

Braidwood Station Readiness for 95001 Supplemental Inspection

Reference:

Letter from Gary L. Shear (U.S. NRC) to Michael J. Pacilio (Exelon Generation Company, LLC), "Assessment Follow-Up Letter for Braidwood Station Unit 2," dated August 6, 2012 On July 18, 2012, the Mitigating System Performance Index (MSPI) for the Cooling Water Support System for Braidwood Unit 2 had crossed the Green-to-White threshold.

This was due to probabilistic risk assessment model change errors, operating restrictions on the cooling water support system and equipment failures. A root cause investigation has been completed.

In the referenced letter, the NRC requested that Exelon Generation Company (EGG) provide notification of readiness for a 95001 supplemental inspection. This letter provides notification to the NRC that EGC is prepared for this inspection. EGC understands this inspection will take place the week of November 26, 2012.

There are no regulatory commitments contained in this letter.

Should you have any questions concerning this letter, please contact Mr. Chris VanDenburgh, Regulatory Assurance Manager, at (815) 417-2800.

Respectfully, Daniel J. Enr;9 hl2J '----I "if Site Vice President Braidwood Station cc: NRC Regional Administrator, Region III NRC Project Manager, NRR - Braidwood Station NRC Senior Resident Inspector - Braidwood Station