|
---|
Category:Letter type:NL
MONTHYEARNL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0351, – ISFSI - Registration of Spent Fuel Cask Use2024-09-13013 September 2024 – ISFSI - Registration of Spent Fuel Cask Use NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0199, Request for Specific Exemption2024-06-25025 June 2024 Request for Specific Exemption NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0003, Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R312024-02-16016 February 2024 Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31 2024-09-09
[Table view] |
Text
SOllthern Nuclear Operating Company, InL January 25,2010 SOUTHERN A.
COMPANY Docket Nos.: 50-321 50-348 NL-10-0015 50-366 50-364 72-36 72-42 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Follow-up Actions - NRC Enforcement Discretion Letter EA-09-190, Holtec Elimination of MPC Shop Helium Leak Rate Test Ladies and Gentlemen:
The Nuclear Regulatory Commission (NRC) notified Holtec International (Holtec) regarding a violation of NRC requirements by letter dated August 6,2006.
Specifically, Holtec eliminated shop helium leak testing of the multi-purpose canister (MPC) during fabrication without prior NRC approval. By letter dated September 2, 2009, Holtec provided a response to the violation which included analysis that supports continued use of loaded MPCs that were not tested during fa brication.
Southern Nuclear Operating Company (SNC) is the licensed operator of the Edwin I. Hatch Nuclear Plant (Hatch) and the Joseph M. Farley Nuclear Plant (Farley) and is the general licensee for the independent spent fuel storage installations (ISFSls) at these facilities. SNC currently has loaded MPCs in storage in both the Hatch and Farley ISFSls that were not helium leak tested during fabrication.
A teleconference was held on December 1, 2009, with NRC, Holtec, and affected licensees participating in the call. In this call, the NRC requested that general licensees with MPCs that were not helium leak tested during fabrication provide information related to their site-specific determinations that the MPCs could remain in service. Accordingly, the requested information is provided in and 2 for Hatch and Farley, respectively.
U. S. Nuclear Regulatory Commission NL-10-0015 Page 2 This letter contains no NRC commitments. If you have any questions, please advise.
Sincerely,
~~~
Mark J. Ajluni Manager - Nuclear Licensing MJAITWSllac
Enclosure:
cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Mr. D. R. Madison, Vice President - Hatch Ms. P. M. Marino, Vice President - Engineering RType: CFA04.054; CHA02.004 U. S. Nuclear Regulatory Commission Mr. LA. Reyes, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Farley Ms. D. N. Wright, NRR Project Manager - Hatch Mr. E. L Crowe, Senior Resident Inspector - Farley Mr. J. A. Hickey, Senior Resident Inspector - Hatch
Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Follow-up Actions - NRC Enforcement Discretion Letter EA-09-190, Holtec Elimination of MPC Shop Helium Leak Rate Test Enclosure 1 NRC Requested Information - Hatch
Enclosure 1 NRC Requested Information - Hatch A teleconference was held by the NRC with Holtec and general licensees with loaded MPCs that were not subjected to helium leak testing during fabrication for the purpose of discussing continued use of the affected MPCs. The following list, taken from the NRC Conversation Record (ML09351000082), identifies the information requested by the NRC. The requested information for Hatch is provided immediately following the NRC requested information below.
- 1. NRC Request:
Information that the thermal heat load for the spent fuel and internal helium conditions that had been loaded into the MPCs was bounded by the thermal and over pressure helium analyses provided by Holtec in their corrective action response to the NRC Enforcement Discretion letter dated August 6, 2009; for MPCs loaded above 21 kilowatts (kW) the NRC requested that the site provide information regarding the length of time that would elapse before the spent fuel heat load would decay below 21 kW.
SNC Response:
Hatch currently has eight MPCs loaded with spent fuel in the ISFSI that were not helium leak tested during fabrication. Four of these casks were loaded during the summer 2007 campaign in accordance with the requirements of CoC 1014, Amendment 2, and four were loaded during the summer 2008 campaign to CoC Amendment 3. The maximum heat load for these MPCs is 19.1 kW. Accordingly, these casks are bounded by the thermal and over pressure helium analyses provided by Holtec letter to the NRC dated September 2, 2009.
- 2. NRC Request:
Information that the site radiological monitoring programs had not detected any adverse effluent conditions associated with the use of the MPCs, and that all measured site radiological parameters were within the limits provided in 10 CFR 72.104.
SNC Response:
SNC has reviewed the results of the Annual Radiological Environmental Operating Reports since the beginning of ISFSI storage operations in 2000. The results of this review determined that there is no discernable increase in dose to the public as the result of storage of casks that were not helium leak tested. Results contained in the Annual Radiological Environmental Operating Report for this period were within the limits specified in 10 CFR 72.104. Based on: (1) absence of identified leakage from MPCs that have been previously tested; and (2) use of the same stringent fabrication requirements; leakage 'from these casks is not E1-1
Enclosure 1 NRC Requested Information - Hatch considered credible. Accordingly, these casks are bounded by the existing SNC analysis for compliance with 10 CFR 72.104.
- 3. NRC Request:
Information that the sites dispositioned the deficiency through their non conforming and corrective action process and determined that continued use of the MPCs was found to be acceptable.
SNC Response:
Condition Report 2009107859 was entered for Holtec failure to perform the required helium leak test during fabrication. A prompt determination of operability was prepared in conjunction with this CR and a determination made that the affected MPCs would perform their intended safety function. This determination was based on the analysis contained in Holtec Report HI-2094407, summarized in the Holtec response to the violation dated September 2, 2009.
E1-2
Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Follow-up Actions - NRC Enforcement Discretion Letter EA-09-190, Holtec Elimination of MPC Shop Helium Leak Rate Test Enclosure 2 NRC Requested Information - Farley
Enclosure 2 NRC Requested Information - Farley A teleconference was held by the NRC with Holtec and general licensees with loaded MPCs that were not subjected to helium leak testing during fabrication for the purpose of discussing continued use of the affected MPCs. The following list, taken from the NRC Conversation Record (ML09351000082), identifies the information requested by the NRC. The requested information for Farley is provided immediately following the NRC requested information below.
- 1. NRC Request:
Information that the thermal heat load for the spent fuel and internal helium conditions that had been loaded into the MPCs was bounded by the thermal and over pressure helium analyses provided by Holtec in their corrective action response to the NRC Enforcement Discretion letter dated August 6, 2009; for MPCs loaded above 21 kilowatts (kW) the NRC requested that the site provide information regarding the length of time that would elapse before the spent fuel heat load would decay below 21 kW.
SNC Response:
Farley currently has four MPCs loaded with spent fuel in the ISFSI that were not helium leak tested during fabrication that were loaded during the summer 2007 campaign in accordance with the requirements of CoC 1014, Amendment 3. The maximum heat load for these MPCs is 26.5 kW. Accordingly, these casks are bounded by the thermal and over pressure helium analyses provided by Holtec letter to the NRC dated September 2, 2009. The heat load for these casks is projected to be less than 21 kW by December 31,2014.
- 2. NRC Request:
Information that the site radiological monitoring programs had not detected any adverse effluent conditions associated with the use of the MPCs, and that all measured site radiological parameters were within the limits provided in 10 CFR 72.104.
SNC Response:
SNC has reviewed the results of the Annual Radiological Environmental Operating Reports since the beginning of ISFSI storage operations in 2005. The results of this review determined that there is no discernable increase in dose to the public as the result of storage of casks that were not helium leak tested. Results contained in the Annual Radiological Environmental Operating Report for this period were within the limits specified in 10 CFR 72.104. Based on: (1) absence of identified leakage from MPCs that have been previously tested; and (2) use of the same stringent fabrication requirements; leakage from these casks is not E2-1
Enclosure 2 NRC Requested Information Farley considered credible. Accordingly, these casks are bounded by the existing SNC analysis for compliance with 10 CFR 72.104.
- 3. NRC Request:
Information that the sites dispositioned the deficiency through their non conforming and corrective action process and determined that continued use of the MPCs was found to be acceptable.
SNC Response:
Condition Report 2009109653 was entered for Holtec failure to perform the required helium leak test during fabrication. A prompt determination of operability was prepared in conjunction with this CR and a determination made that the affected MPCs would perform their intended safety function. This determination was based on the analysis contained in Holtec Report HI-2094407, summarized in the Holtec response to the violation dated September 2, 2009.
E2-2