|
---|
Category:Letter type:L
MONTHYEARL-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-038, Submittal of Revised Pressure and Temperature Limits Report2019-09-19019 September 2019 Submittal of Revised Pressure and Temperature Limits Report L-PI-19-037, Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2019-09-16016 September 2019 Response to Request for Additional Information: 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-19-025, Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP)2019-08-27027 August 2019 Request to Approve Site-Specific Probabilistic Risk Assessment (PRA) Model for Flowserve N-Seal Abeyance Seal and Dynamic Testing for the Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-029, Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For...2019-08-0505 August 2019 Supplement to Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components For... L-PI-19-002, 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 22019-06-13013 June 2019 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals for Prairie Island, Unit 1 and Unit 2 L-PI-19-014, Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2019-04-29029 April 2019 Response to Request for Additional Information: Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-PI-19-003, Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP)2019-02-0404 February 2019 Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule for Prairie Island Nuclear Generating Plant (PINGP) L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-19-005, Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.692019-01-15015 January 2019 Online Reference Portal for NRC Review of License Amendment Request to Implement 10 CFR 50.69 L-PI-18-063, Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 8052018-12-0606 December 2018 Response to Request for Additional Information: Revise License Condition Associated with Implementation of NFPA 805 2024-01-02
[Table view] |
Text
XcelEnergy-September 26, 2008 L-PI-08-085 10 CFR 54 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Submittal of Documents for Public Disclosure as Requested During NRC License Renewal Environmental Audit During the period August 18-22, 2008, the NRC conducted a License Renewal Environmental audit at the Prairie Island Nuclear Generating Plant (PINGP) site. During this audit it was requested that certain documents be submitted for use during the NRC staffs review and preparation of a Supplemental Environmental Impact Statement.
Because of their sensitive nature, archaeological documents will be transmitted by separate letter. Similarly, confidential non-archaeological documents will be transmitted by separate letter. This letter submits the requested non-archaeological documents that may be made available for public inspection. provides the complete index of non-archaeological documents requested by the NRC staff, grouped according to the requests from each staff member. The index indicates which of the documents may be made publicly available (included in this letter), and those which are being transmitted by separate letter because they are confidential. Enclosure 2 contains the documents available for public disclosure.
If you have any questions about these documents, please contact Mr. James Holthaus, Environmental Project Manager, at 651-388-1121 ext. 7268.
Summary of Commitments This letter contains no new commitments or changes to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 26, 2008.
Michael D. Wadley Site Vice President, Prairie Island Nuclear Generating Plant Units 1 and 2 Northern States Power Company - Minnesota 1717 Wakonade Drive East
- Welch, Minnesota 55089-9642 Telephone: 651.388.1121 IS
Document Control Desk Page 2 Enclosures (2) cc (without Enclosure 2):
Administrator, Region III, USNRC License Renewal Environmental Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC Prairie Island Indian Community ATTN: Phil Mahowold Minnesota Department of Commerce
Enclosure 1 Index of Documents Requested During NRC License Renewal Environmental Audit Item Number Document I Disclosure Status Kate Lenning (Environmental Health and Waste Issues)
CONFIDENTIAL - Follow-up to questions from Kate Lenning (typed responses) Trade Secret or 1 - Submitted under separate letter Commercial Information CONFIDENTIAL - Waste Management Program Procedure/Waste Trade Secret or 2 Management Guidance Manual - Submitted under separate letter Commercial Information CONFIDENTIAL - Environmental Management Baseline: Pages 18,22-25, 28- Trade Secret or 3 32, 36 Submitted under separate letter Commercial Information CONFIDENTIAL - Domestic Water and Sewer System, Rev. 7 - Submitted Trade Secret or 4 under separate letter Commercial Information 5 2004 Hazardous Waste License Application Public 6 2005 Hazardous Waste License Application Public 7 2006 Hazardous Waste License Application Public 8 2007 Hazardous Waste License Application Public 9 2008 Hazardous Waste License Application Public CONFIDENTIAL - Regulated Waste Management & Hazardous and Non-Hazardous Materials Storage, Disposal and Labeling Requirements - Submitted Trade Secret or 10 under separate letter Commercial Information Minnesota Emergency Response Commission. Hazardous Chemical Report.
11 2008. (EPA 2007) Public Minnesota Emergency Response Commission. Hazardous Chemical Report.
12 2007. (EPA 2006) Public Minnesota Emergency Response Commission. Hazardous Chemical Report.
13 2006. (EPA 2005) Public 14 Air Emission System Permit 04900030-003 with tables and Appendix B Public CONFIDENTIAL - 2007 MIDAS Data Performance Tracking - Submitted under Trade Secret or 15 separate letter Commercial Information CONFIDENTIAL - 2008 Meteorological Performance Data - Submitted under Trade Secret or 16 separate letter Commercial Information 17 Air Quality Binder #2: Climate of MN Public 18 Air Quality Binder #2: Wind roses Public 19 Air Quality Binder #2: Query results Public CONFIDENTIAL - "Public Exposure Impact" from SGR-Related Additional Trade Secret or 20 Information Binder - Submitted under separate letter Commercial Information CONFIDENTIAL -Projected dose to workers during SGR project - Submitted Trade Secret or 21 under separate letter Commercial Information CONFIDENTIAL - Projected increase in radiological waste during SGR project - Trade Secret or 22 Submitted under separate letter Commercial Information Guidelines for operatingan interim on site low-level radioactive waste storage 23 facility 2/12/08, public version Public CONFIDENTIAL - Interim storage of low and intermediate level wastes:
Guidelines for extended storage. Technical Report, EPRI - Submitted under Trade Secret or 24 separate letter Commercial Information CONFIDENTIAL - Email from J.L. Payton to R.L. Vincent, Subj: REMP Trade Secret or 25 anomalies for last 5 yrs - Submitted under separate letter Commercial Information I
Enclosure 1 Index of Documents Requested During NRC License Renewal Environmental Audit Bree Balsam (Terrestrial Ecology)
CONFIDENTIAL - Table provided at intro meeting giving location of info Trade Secret or 26 requests (Items 31,33-37) - Submitted under separate letter Commercial Information CONFIDENTIAL - Vegetation Management Guidelines for Great River Energy - Trade Secret or 27 Submitted under separate letter Commercial Information CONFIDENTIAL - Vegetation Management Guidelines for Xcel Energy - Trade Secret or 28 Submitted under separate letter Commercial Information 29 Floodplain map (NRG) Public 30 NWI Wetland map (NRG) Public 31 ER, Chapter 3 Ref: Goddard, 1977 Public 32 ER, Chapter 3 Ref: Goddard, 1978 Public 33 ER, Chapter 3 Ref: Goddard 1979 Public CONFIDENTIAL - Documentation of Xcel's procedures for spraying of Trade Secret or 34 herbicides on/near wetlands and streams - Submitted under separate letter Commercial Information CONFIDENTIAL - Draft of Xcel's Avian Protection Plan for Wisconsin &
Preliminary maps and collision ranking data for letter and distribution lines near Prairie Island facility (will be a part of Minnesota's draft APP).- Submitted under Trade Secret or 35 separate letter Commercial Information CONFIDENTIAL - MnDNR Natural Heritage Information (not location specific)
GIS layers on top of a USGS topo map with Xcel letter lines - Submitted under Geophysical &
36 separate letter Geological maps 37 ER, Chapter 3 Ref: NSPCM & FWS, 2002 Public Ali Travers (Groundwater Resources) 38 2005 Tritium Report Public 39 2006 Tritium Report Public 40 2007 Tritium Report Public 41 Water Appropriation Reports (2001-2007)--Hydro Binder Public 42 MDNR Permit 865114 Public 43 MDNR Permit 785153 Public 44 MDNR Permit 690172 Public 45 MDNR Permit 965042 Public 46 MDNR Permit 690171 Public 47 ER Ref: Bergland 2006 Public CONFIDENTIAL - Groundwater Monitoring Map- Location and Elevation, July Geophysical &
48 2008 - Submitted under separate letter Geological maps 49 ER.Ref, MDNR 2005a Public 50 ER Ref Binder #9, TtNUS 2006b Public Geophysical &
Geological maps and CONFIDENTIAL - Storm Water Pollution Prevention Plan - Submitted under Trade Secret or 51 separate letter Commercial Information CONFIDENTIAL - Email and attachment from L. Lenertz regarding dredging Trade Secret or 52 history and future dredging projects - Submitted under separate letter Commercial Information 53 Intake and Recycle Modification Model Study Public 2
Enclosure 1 Index of Documents Requested During NRC License Renewal Environmental Audit CONFIDENTIAL- Some kind of documentation stating that the utility does plan on [preparing a written] groundwater monitoring program in the future - Trade Secret or 54 Submitted under separate letter Commercial Information 55 MNDNR's Pool 3 Drawdown Plan Public 56 MRBDC 2001- "State of the MN River" Public Jeff Rickhoff (Socioeconomics)
Executed Revenue Stabilization Agreement between Xcel Energy and 57 Goodhue County Public CONFIDENTIAL - Results of forthcoming discussion with Red Wing school district regarding revenue stabilization agreement - Submitted under separate Trade Secret or 58 letter Commercial Information CONFIDENTIAL - Written description of payments made by Xcel Energy in addition to property tax payments (Prairie Island Settlement Costs, Pollution Control Tax Exemptions not taken, Land and Health Sunset payments, Trade Secret or 59 radiological/EP payments - Submitted under separate letter Commercial Information 60 Bjornstad, Ken. 2006. "Red Wing Area LOS Data" Public Hove, A. (Goodhue County Auditor/Treasurer's Office). 2006. "Property Tax 61 Revenue Information for Goodhue County." Public Schlichting, K. (City of Red Wing). 2007. "Property Tax Revenue Information for 62 the City of Red Wing." Public Liz Wexler (Surface Water) 63 Bodensteiner, J. 1991 Public 64 ESWQD. 2000. Public 65 ESWQD. 2001. Public 66 ESWQD. 2002. Public 67 ESWQD. 2003. Public 68 ESWQD. 2004. Public 69 ESWQD. 2005. Public Trade Secret or CONFIDENTIAL - Giese, Brad. 2007. Re: Paddlefish location - Submitted Commercial Information; 70 under separate letter Endangered species 71 HDR. 1978. Public 72 NSP. 1981 a. Public 73 NSP. 1981b. Public 74 NSP. 1983. Public 75 Corr Binder: Letter from Matt Langan, MNDNR, Aug 10, 2007 Public 76 Corr Binder: Letter from John Stine, MDH, April 10, 2008 Public 77 Corr Binder: Letter from Gary Wege, USFWS, June 20, 2007 Public Corr Binder: Letter from Terry Birkenstock, ACE, March 11 2008. If possible, 78 include attachment (2002 Clam Chronicle.pdf) Public 79 Corr Binder: Email from Tom Lovejoy, WDNR, Aug 31, 2007 Public 80 Report regarding fish kill in 2000 Public CONFIDENTIAL - Electronic maps showing t-lines - Submitted under separate Geophysical &
81 letter Geological maps Letter to H. Krosch and D. Kriens from W. Jensen, Chlorination of Circ Water 82 System Fish Loss Report, October 14 Public 3
Enclosure 1 Index of Documents Requested During NRC License Renewal Environmental Audit 83 NUS Corporation. 1976. Public 84 Stone and Webster. 1983. Public Xcel Energy, 2007, PINGP Environmental Monitoring and Ecological Studies 85 Program 2006 Annual Report. Public Xcel Energy, 2008, PINGP Environmental Monitoring and Ecological Studies 86 Program 2007 Annual Report. Public 87 NPDES Filing Cooling Data (Binder 14) Public CONFIDENTIAL - From Aquatic Review Binder: Cooling Water System Description and Drawings (blueprints of systems not needed) - Submitted under Trade Secret or 88 separate letter Commercial Information 89 From Aquatic Review Binder: ESE. 1999. Public CONFIDENTIAL - From Aquatic Review Binder: Events Summary Table 1998- Trade Secret or 90 2008 - Submitted under separate letter Commercial Information 91 DMR: 5/21/98 Public 92 DMR: 6/19/98 Public 93 DMR: 10/21/98 Public 94 DMR: 5/21/99 Public 95 DMR: 7/20/01 Public 96 DMR 11/21/01 Public 97 DMR: 8/21/03 Public 98 DMR: 5/20/05 Public CONFIDENTIAL - Zebra Mussel Sampling and Control Procedure - Submitted Trade Secret or 99 under separate letter Commercial Information CONFIDENTIAL - Zebra Mussel Treatment Procedure - Submitted under Trade Secret or 100 separate letter Commercial Information 101 Entire 316(b) Binder (Comprehensive Demonstration Study) Public 102 Plume Modeling of Discharge Canal Discharge Sluice Gate flow into the river Public 4
Enclosure 2 Documents Requested During NRC License Renewal Environmental Audit