RC-08-0083, Mitigation of Alloy 600/82/182 Pressurizer Butt Welds in 2008 (CR-07-00439) - Confirmatory Action Letter Completion
| ML081700649 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 06/16/2008 |
| From: | Archie J South Carolina Electric & Gas Co |
| To: | Leeds E Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RC-08-0083, TAC MD4188 | |
| Download: ML081700649 (2) | |
Text
Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 Eý4&
IJune 16, 2008 A SCANA COMPANY RC-08-0083 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN:
Mr. Eric J. Leeds, Director Office of Nuclear Reactor Regulation
Dear Mr. Leeds:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 MITIGATION OF ALLOY 600/82/182 PRESSURIZER BUTT WELDS IN 2008 (CR-07-00439) - CONFIRMATORY ACTION LETTER COMPLETION
References:
- 1. J. E. Dyer (NRC) Letter to Jeffrey B. Archie (SCE&G), "Confirmatory Action Letter - Virgil C. Summer Nuclear Station (TAC NO. MD4188)," dated March 15, 2007
- 2. Jeffrey B. Archie (SCE&G) letter to Document Control Desk (NRC),
"Inservice Inspection Relief Request RR-III-05, Summary of Ultrasonic Examinations of Preemptive Weld Overlays for Pressurizer Nozzle Locations Containing Alloy 600 Materials," May 23, 2008
- 3. Jeffrey B. Archie (SCE&G) letter to Document Control Desk (NRC),
"Inservice Inspection Relief Request RR-1II-05, Weld Overlay Repair Stress Analysis Summary," May 23, 2008 Confirmatory Action Letter of March 15, 2007 (Reference 1) directed South Carolina Electric &
Gas Company (SCE&G) to report results of the pressurizer butt weld volumetric inspections or mitigation actions to the NRC 60 days after plant start up. This response was provided on May 23, 2008, through Reference 2. An additional response (Reference 3) submitted the stress analysis summary associated with the weld overlay inspections.
Additionally, Reference 1 required SCE&G to notify the Director, Office of Nuclear Reactor Regulation, in writing when the actions and commitments addressed in the Confirmatory Action Letter were complete. This letter serves to inform you that the actions and commitments necessary to comply with the Confirmatory Action Letter of March 15, 2007 are complete and documented in the referenced documents.
tic0 SCE&G I Virgil C. Summer Nuclear Station
- P. 0. Box 88 ° Jenkinsville, South Carolina 29065 -T (803) 345.5209
- www.sceg.com
Document Control Desk CR-07-00439 RC-08-0083 Page 2 of 2 Should you have questions, please call Mr. Bruce Thompson at (803) 931-5042.
JWT/JBA/dr c:
K. B. Marsh S. A. Byrne N. S. Carns J. H. Hamilton R. J. White L. A. Reyes R. E. Martin NRC Resident Inspector K. M. Sutton J. Riley (NEI)
M. N. Browne T. A. McAlister J&H Marsh & McLennan NSRC RTS (CR-07-00439)
File (815.02, IEB 2004-01)
DMS (RC-08-0083)