MONTHYEARRS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-038, Response to Request for Additional Information for the Byron Proposal to Reinsert an Accident Tolerant Fuel Lead Test Assembly2023-02-27027 February 2023 Response to Request for Additional Information for the Byron Proposal to Reinsert an Accident Tolerant Fuel Lead Test Assembly RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request.2022-09-20020 September 2022 Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. RS-22-097, License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly2022-08-31031 August 2022 License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.2022-08-10010 August 2022 R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. RS-22-084, Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator .2022-06-17017 June 2022 Response to Request for Additional Information Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator . RS-22-074, Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds .2022-05-20020 May 2022 Response to Request for Additional Information - Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds . RS-22-073, Supplemental Information Regarding License Amendment Request -Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube.2022-05-19019 May 2022 Supplemental Information Regarding License Amendment Request -Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube. RS-22-057, Constellation Radiological Emergency Plan Addendum Revision2022-04-21021 April 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-037, License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control2022-04-21021 April 2022 License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-050, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2022-04-0808 April 2022 Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-22-047, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-04-0808 April 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-014, Application to Adopt TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time2022-03-24024 March 2022 Application to Adopt TSTF-246, RTS Instrumentation, 3.3.1 Condition F Completion Time RS-22-041, Withdrawal of License Amendment Request to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) to Add References to NRC Approved Topical Report with Administrative Changes2022-03-22022 March 2022 Withdrawal of License Amendment Request to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) to Add References to NRC Approved Topical Report with Administrative Changes RS-22-036, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2022-03-10010 March 2022 Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-008, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report to Add References to NRC-Approved Topical Report with Admin2022-01-24024 January 2022 Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report to Add References to NRC-Approved Topical Report with Admin RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-112, Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-22022 October 2021 Updated 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-103, Updated Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations for Byron Station and Dresden Nuclear Power Station2021-09-28028 September 2021 Updated Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations for Byron Station and Dresden Nuclear Power Station RS-21-096, Withdrawal of Certification of Permanent Cessation of Power Operations for Byron Station, Units 1 and 2, and Previously Submitted Licensing Actions in Support of Decommissioning2021-09-15015 September 2021 Withdrawal of Certification of Permanent Cessation of Power Operations for Byron Station, Units 1 and 2, and Previously Submitted Licensing Actions in Support of Decommissioning RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2021-09-0101 September 2021 R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections 2023-09-29
[Table view] |
Text
Exelein.
Exelon Generation 4300 Winfield Road www_exeloncorp com Nuclear Warrenville, II_ 60555 RS-07-128 September 17, 2007 U . S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos . STN 50-454 and STN 50-455 Subject : Additional Information Supporting Second Ten-Year Interval Inservice Inspection Relief Requests References : 1 . Letter from D . M. Hoots (Exelon Generation Company, LLC) to U . S. NRC, "Inservice Inspection Program Second Interval Relief Requests 12R-21, 12R-22,12R-23,12R-25 and 12R-53," dated January 12, 2007
- 2. Letter from R. F. Kuntz (U . S. NRC) to C. M. Crane (Exelon Generation Company, LLC), "Byron Station, Unit Nos. 1 and 2 - Request for Additional Information Related to Second Ten-Year Interval Relief Requests (TAC Nos.
MD4097, MD4098, MD4099, MD4100, MD4101, MD4102, MD4103, MD4104, MD4105, and MD4106)," dated August 17, 2007 In Reference 1, Exelon Generation Company, LLC (EGC) submitted requests for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," for the second inservice inspection interval for Byron Station, Units 1 and 2 . The NRC requested additional information to complete review of the requests for relief in Reference 2. In response to this request, EGC is providing the attached information.
September 17, 2007 U . S. Nuclear Regulatory Commission Page 3 bcc: NRC Project Manager, Byron Station Site Vice President -Byron Stations Director - Licensing Manager, Licensing - Byron Regulatory Assurance Manager - Byron Station Exelon Document Control Desk - Licensing.,
Ken Nicely Hien Do i Robert McBride Alison Mackellar i Joseph Langan
September 17, 2007 U . S . Nuclear Regulatory Commission Page 2 There are no regulatory commitments contained in this letter . Should you have any questions related to this letter, please contact Mr. Kenneth M. Nicely at (630) 657-2803 .
Respectfully, R Ailu i~~ ~
Patrick R. Simpson Manager - Licensing
Attachment:
Response to Request for Additional Information
ATTACHMENT Response to Request for Additional Information NRC Request_ 12R-21-1 RR 12R-21 did not indicate whether the limited scope surface examination of the seismic lug welds provided any indication of the presence of unacceptable flaws or conditions in accordance with the acceptance criteria of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Article IWB-3000. Therefore, the Nuclear Regulatory Commission (NRC) staff requests that you discuss whether the limited scope surface examination of these welds provided any indication of the presence of flaws or other relevant conditions that were determined to be unacceptable according to the acceptance criteria of the ASME Code,Section XI, Article IWB-3000 .
Response
During the Fall 2005 refueling outage (i.e., B2R12), the examination of pressurizer seismic lug PSL-1 revealed aligned linear indications near the toe of the weld closest to the pressurizer vessel . The lengths of the two indications detected were 0.2" and 0.8", with a separation distance of 0.9" between the indications. These two indications did not require grouping into a single indication, based on Subarticle IWA-3400, "Linear Flaws Detected by Surface or Volumetric Examinations," paragraph (a) . Using the acceptance standard in Table IWB-3510-3, "Allowable Linear Flaws," the 0.2" linear indication was determined to be acceptable . However, for the 0.8" linear indication, the length divided by the nominal vessel thickness (i.e., 4 .0") was calculated to be 20% and exceeded the acceptance standard of 10.4%. The flaws were determined to be fabrication defects, and not service induced . The fabrication examination method was magnetic particle (MT), using the prod technique, and did not record the shallow surface indications. These indications were evaluated in accordance with the ASME Code Section XI flaw evaluation guidelines. Flaw evaluation charts were developed for both outside axial and circumferential surface flaws to determine the acceptability of the as-found indications .
It was concluded that ample margin exists for the linear indication of concern and that no repair was necessary for an operational period of 30 years. The flaw evaluation report associated with these indications was submitted to the NRC in Reference 1 .
NRC Request 12R-21-2 The NRC staff requests that you discuss the extent to which the seismic lug welds were examined during the first ISI interval and the preservice exam, including the percentage of credible surface examination coverage that was achieved during these previous examinations .
Discuss any relevant conditions that were found during these previous examinations .
Response
The Preservice Inspection (PSI) program was based on ASME Code,Section XI, 1977 Edition through Summer 1978 Addenda. Under these code requirements, it was determined that a PSI examination was not applicable to the pressurizer seismic lug welds.
During the first Inservice Inspection (ISI) interval, the liquid penetrant (PT) examination achieved an estimated 21 % coverage for Unit 1 and 20% for Unit 2. The Unit 1 examination was able to
ATTACHMENT Response to Request for Additional Information partially access lugs 1, 2, and 3. The Unit 2 examination accessed lugs 3 and 4 only . None of the limited examinations in the first ISI interval resulted in recordable indications.
NRC Request 12R-21-3 The NRC staff notes that a similar request was authorized for Braidwood Station, Units 1 and 2 on January 6, 2000. However, the authorization of this request was granted with the understanding that the licensee would perform a VT-1 visual examination of the accessible areas in the vicinity of the seismic weld lugs during the forthcoming ISI interval . Please discuss whether a VT-1 visual examination has been or will be performed for the accessible areas of the seismic lugs .
Response
For the third ISI interval, Exelon Generation Company, LLC (EGC) intends to perform a best effort surface examination (i .e., liquid penetrant) on those portions of the lugs that are inspectable when the removable insulation panels are removed . In addition, in conjunction with this surface examination, EGC intends to perform a VT-1 visual examination of the upper surfaces of the three accessible lugs .
NRC Request 12R-22-1 Please indicate the percentage of credible surface examination coverage that was achieved during the examination of the accessible welded attachments located on the exposed outside surface of the containment penetration . If less than essentially 100 percent coverage was achieved for any of these welds, please provide supplemental information justifying why compliance with the ASME Code,Section XI requirements for essentially 100 percent surface examination coverage of these welds was impractical .
Response
The percentage of surface examination coverage achieved during the examination of the accessible welded attachments on the exterior surface was essentially 100%, which is defined in ASME Code Case N-460, "Alternative Examination Coverage for Class 1 and 2 Welds," as greater than 90%.
NRC Request 12R-22-2 RR 12R-22 did not indicate whether the surface examination of the accessible attachment welds provided any indication of the presence of unacceptable flaws or conditions in accordance with the acceptance criteria of the ASME Code,Section XI, Article IWC-3000. Therefore, the NRC staff requests that you discuss whether the surface examination of these welds provided any indication of the presence of flaws or other relevant conditions that were determined to be unacceptable according to the acceptance criteria of the ASME Code,Section XI, Article IWC-3000.
ATTACHMENT Response to Request for Additional Information
Response
None of the second ISI interval examinations resulted in recordable indications.
NRC Request 12R-23-1 RR 12R-23 did not indicate whether the limited scope volumetric examination of the specified pressurizer nozzle-to-vessel welds provided any indication of the presence of unacceptable flaws or conditions in accordance with the acceptance criteria of the ASME Code,Section XI, Article IWB-3000. Therefore, the NRC staff requests that you discuss whether the limited scope volumetric examination of these welds provided any indication of the presence of flaws or other relevant conditions that were determined to be unacceptable according to the acceptance criteria of the ASME Code,Section XI, Article IWB-3000.
Response
None of the second ISI interval examinations resulted in recordable indications.
NRC Reauest 12R-23-2 The NRC staff requests that you discuss the extent to which the specified pressurizer nozzle-to-vessel welds were examined during the first ISI interval and the preservice exam, including the percentage of credible surface examination coverage that was achieved during these previous examinations . Discuss any relevant conditions that were found during these previous examinations .
Response
Byron Station adopted ASME Code Case N-460 in the third period of the first ISI interval .
Examinations performed prior to the adoption of ASME Code Case N-460 do not have documented coverage percentages . Rather, the examiner was only required to identify obstructions or limitations and record them on the examination report .
The subject examinations are governed by ASME Code Section V Article 4, not ASME Code Section XI Appendix VIII . Although coverage percentages were not documented for examinations performed prior to the adoption of ASME Code Case N-460, the percentages obtained were likely similar to those obtained in the second ISI interval . This is based on the examination techniques remaining essentially unchanged from the PSI program through the second ISI interval . Surface examination methods are not specified in ASME Section XI for these components .
During the Fall 2006 refueling outage, four of the subject pressurizer nozzles were examined .
The calculated coverage for nozzles PN-02, PN-03, PN-05, and PN-06 were 76.9%, 77.2%,
68.2%, and 76.8%, respectively .
The Unit 1 nozzle 1 RY01 S PN-06 had a spot indication at 40% amplitude during the PSI examinations . In the first ISI interval examination, this indication was recorded at 50%
Page 3 of 5
ATTACHMENT Response to Request for Additional Information amplitude (i .e., the minimum ISI recordable level) . During the second ISI interval examination, the examination signal did not achieve the minimum recording level and the indication was noted for information on the report as "seen below recording levels ." No other indications were recorded during these examinations . The examination performed during the third ISI interval did not record this indication .
NRC Request 1213-25-1 RR 1213-25 did not indicate whether the limited scope volumetric examination of the reactor vessel head-to-flange weld provided any indication of the presence of unacceptable flaws or conditions in accordance with the acceptance criteria of the ASME Code, Section X1, Article IWB-3000. Therefore, the NRC staff requests that you discuss whether the limited scope volumetric examination of this weld provided any indication of the presence of flaws or other relevant conditions that were determined to be unacceptable according to the acceptance criteria of the ASME Code, Section X1, Article IWB-3000.
Response
None of the second ISI interval examinations resulted in recordable indications.
NRC Request 12R-53-1 RR 1213-53 did not indicate whether the limited scope volumetric examination of the residual heat removal heat exchanger (RHRHX) shell-to-flange weld provided any indication of the presence of unacceptable flaws or conditions in accordance with the acceptance criteria of the ASME Code,Section XI, Article IWC-3000 . Therefore, the NRC staff requests that you discuss whether the limited scope volumetric examination of this weld provided any indication of the presence of flaws or other relevant conditions that were determined to be unacceptable according to the acceptance criteria of the ASME Code, Section X1, Article IWC-3000 .
Response
No unacceptable indications were identified during the second ISI interval examinations .
NRC Request 1213-53-2 The NRC staff requests that you discuss the extent to which the RHRHX shell-to-flange weld was examined during the first ISI interval and the preservice exam, including the percentage of credible volumetric examination coverage that was achieved during these previous examinations . Discuss any relevant conditions that were found during these previous examinations .
ATTACHMENT Response to Request for Additional Information
Response
As discussed above, examinations performed prior to the adoption of ASME Code Case N-460 do not have documented coverage percentages. Rather, the examiner was only required to identify obstructions or limitations and record them on the examination report .
The subject examinations are governed by ASME Code Section V Article 4, not ASME Code Section XI Appendix VI I1 . Although coverage percentages were not documented for examinations performed prior to the adoption of ASME Code Case N-460, the percentages obtained were likely similar to those obtained in the second ISI interval . This is based on the examination techniques remaining essentially unchanged from the PSI program through the second ISI interval .
For Unit 1, no relevant indications were identified during the PSI and first ISI interval examinations . In the second ISI interval, a small subsurface planar flaw was found that is within the acceptance standards of Article IWC-3000, "Acceptance Standards." This weld has subsequently been examined during the third ISI interval and no change in indication dimensions was noted. The coverage obtained was conservatively estimated at 50%.
For Unit 2, a rejectable indication was found during the PSI examination. This area was repaired and reexamined with no relevant indications seen in the repair area. No additional relevant indications have been identified during the PSI, first ISI interval, and second ISI interval examinations .
Reference
- 1. Letter from D. Hoots (Exelon Generation Company, LLC) to U . S. NRC, "Submittal of Analytical Evaluation of Pressurizer Seismic Restraint Lug Indications," dated January 11, 2006