0CAN030602, License Amendment Request, Supplemental to Emergency Cooling Pond Inspection and Inventory Requirements, Arkansas Nuclear One, Units 1 and 2

From kanterella
(Redirected from ML060890042)
Jump to navigation Jump to search
License Amendment Request, Supplemental to Emergency Cooling Pond Inspection and Inventory Requirements, Arkansas Nuclear One, Units 1 and 2
ML060890042
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/20/2006
From: Marlow T
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
0CAN030602
Download: ML060890042 (6)


Text

Entergy Operationi, Inc.

I- Enf f 1448 S.R. 333 EntrV Russelivlle, AR 72802 Tel 479-858-4888 Thomas A. Marlovy Director Nuclear Safety Assurance OCAN030602 March 20, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

License Amendment Request Supplemental to Emergency Cooling Pond Inspection and Inventory Requirements Arkansas Nuclear One - Unit 1 and Unit 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

REFERENCE:

1. Entergy Letter to the NRC dated October 25, 2005, License Amendment Request for Emergency Cooling Pond Inspection and Inventory Requirements (OCAN100503)

Dear Sir or Madam:

By letter (Reference 1), Entergy Operations, Inc. (Entergy) proposed a change to the Technical Specifications (TS) for Arkansas Nuclear One, Unit-1 (ANO-1) and Unit 2 (ANO-2). The proposed change modifies inventory and inspection requirements associated with the Emergency Cooling Pond (ECP). Limiting Conditions for Operation (LCO) 3.7.8 and 3.7.4.1 (ANO-1 and ANO-2, respectively), "Emergency Cooling Pond," and their associated Actions and Surveillance Requirements (SR) are affected by the proposed change.

On March 15, 2006, Entergy was notified by the members of your staff of a request to modify the proposed wording of TS SR 3.7.8.1 and 4.7.4.1.a (ANO-1 and ANO-2, respectively). These SRs ensure that sufficient water volume is maintained in the ECP at all times during the modes of applicability. Subsequent to this notification, Entergy and members of your staff reached agreement on revised wording for the affected SRs. The revised wording is included in marked-up TS pages contained in Attachment 1 of this letter for both ANO-1 and ANO-2. The corresponding pages of the original transmittal (Reference 1) should be removed and replaced with the pages attached.

The revised wording provides enhanced clarity and involves no technical change to the requirements as originally proposed. Therefore, the original no significant hazards consideration included in Reference 1 is not affected by any information contained in this supplemental letter.

This letter contains no new commitments.

-fko(

OCAN030602 Page 2 of 2 If you have any questions or require additional information, please contact David Bice at 479-858-5338.

I declare under penalty of perjury that the foregoing is true and correct. Executed on March 20, 2006.

Very truly yours, 4tvi TAM/dbb

-jmt4

Attachment:

Proposed Technical Specification Changes (markup) cc: Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew G. Holland MS O-7D1 Washington, DC 20555-0001 Mr. Bernard R. Bevill Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street Little Rock, AR 72205

Attachment I To OCAN30602 Proposed Technical Specification Changes (mark-up)

ECP 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Emergency Cooling Pond (ECP)

LCO 3.7.8 The ECP shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Degradation of the ECP A.1 Determine ECP remains 7 days noted Pursuant to acceptable for continued SR 3.7.8.4 below or by operation.

other inspection.

BA. Required Action and BA.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND metEGP-inoporable.

BA.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR LCO not met for reasons other than Condition A.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 Verify that the indicated water level of the ECP is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> greater than or equal to that required for an ECP volume ofx 70 acre-ft.

SR 3.7.8.2 --- ------ NOTE------

Only required to be performed from June 1 through September 30.

Verify average water temperature is < 100F. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ANO-1 3.7.8-1 Amendment No. 24-5,

ECP 3.7.8 SURVEILLANCE FREQUENCY SR 3.7.8.3 Perform soundings of the ECP to vVerify: 12 months

1. A contained water volume of ECP 2 70 acre-feet at water level of 5 ft and
2. The minimum indicated water level needed to ensure a volume of 70 acre-feet is maintained.

SR 3.7.8.4 Vorify earth portions of stone co'vred ombaRk*nenWt 12 months and spillway of ECP:Perform visual inspection of the ECP to verify conformance with design requirements.

a. Have not been Proded or undercut by wave actionR, and
b. Do not show apparent changes in visual appeafraRe or other abnormal deogadatieGr ffm-as built condition.

ANO-1 3.7.8-2 Amendment No. 21-,

1%.

PLANT SYSTEMS 3/4.7.4 EMERGENCY COOLING POND LIMITING CONDITION FOR OPERATION 3.7.4.1 The emergency cooling pond (ECP) shall be OPERABLE with:

a. A minimum contained water volume of 70 acre-feet (equivalent to an indicated"ateF level of5 feet).
b. An average water temperature of
  • 1000 F.

APPLICABILITY: MODES 1,2, 3 and 4.

ACTION:

a. With the volume and/or temperature requirements of the above specification not satisfied or, with the requirements of Action b not met, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. If degradation is noted pursuant to 4.7.4.1.d below or by other inspection, perform an evaluation to determine that the ECP remains acceptable for continued operation within 7 days.

SURVEILLANCE REQUIREMENTS 4.7.4 .1 The ECPomergoncy cooling pond shall be determined OPERABLE:

a. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying that the poend's indicated water level of the ECP is greater than or equal to that required for an ECP volume of- 705 acre-feet.
b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during the period of June 1 through September 30 by verifying that the pond's average water temperature at the point of discharge from the pond is within its limit.
c. At least once per 12 months by making soundings of the pond and verifying: aR-average dopth of 5 foet and that the ontained water volume of the poi
1. A contained water volume of ECP 2 70 acre-feet, and
2. The minimum indicated water level needed to ensure a volume of 70 acre-feet is maintained.
d. At least once per 12 months by performance of a visual inspection of the Ieose stee-(Fprap) plaodoRn tho banRks of tho pond and of the concroto slab spillway' and verifying that the earth portion- of the 6tone covered ombankmentc and the spillwayECP to verify conformance with design requirements.