MONTHYEARML0519303792005-06-28028 June 2005 Request for Additional Information LAR to Revise Spent Fuel Criticality Analyses and Technical Specifications Project stage: RAI ML0520104522005-07-26026 July 2005 Request for Additional Information (RAI) Related to License Amendment Request (LAR) to Revise the Spent Fuel Pool Criticality Analyses and Technical Specifications (TS) 3.7.17, Spent Fuel Storage and 4.3, Fuel Storage Project stage: RAI L-PI-05-075, Supplement to License Amendment Request (LAR) to Revise the Spent Fuel Pool Criticality Analyses and Technical Specifications (TS) 3.7.17, Spent Fuel Pool Storage and 4.3, Fuel Storage.2005-09-16016 September 2005 Supplement to License Amendment Request (LAR) to Revise the Spent Fuel Pool Criticality Analyses and Technical Specifications (TS) 3.7.17, Spent Fuel Pool Storage and 4.3, Fuel Storage. Project stage: Supplement L-PI-05-110, Supplement to License Amendment Request (LAR) to Revise the Spent Fuel Pool Criticality Analyses and Technical Specifications (TS) 3.7.17, Spent Fuel Pool Storage and 4.3, Fuel Storage2005-12-0202 December 2005 Supplement to License Amendment Request (LAR) to Revise the Spent Fuel Pool Criticality Analyses and Technical Specifications (TS) 3.7.17, Spent Fuel Pool Storage and 4.3, Fuel Storage Project stage: Supplement L-PI-06-001, Supplement to License Amendment Request (LAR) to Revise the Spent Fuel Pool Criticality Analyses and Technical Specifications (TS) 3.7.17, Spent Fuel Pool Storage and 4.3, Fuel Storage.2006-01-0505 January 2006 Supplement to License Amendment Request (LAR) to Revise the Spent Fuel Pool Criticality Analyses and Technical Specifications (TS) 3.7.17, Spent Fuel Pool Storage and 4.3, Fuel Storage. Project stage: Supplement ML0602502082006-02-0505 February 2006 Prairie, Units 1 and 2 - Licensing Amendments 172 and 162 Regarding Spent Fuel Pool Storage Project stage: Other ML0603901092006-02-0505 February 2006 Prairie, Units 1 and 2 - Tech Spec Pages for Amendments 172 and 162 Regarding Spent Fuel Pool Storage Project stage: Other 2005-07-26
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 L-PI-24-009, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-09 Safety Injection System and Volume Control System Category C Check Valve Quarterly Testing2024-02-13013 February 2024 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-09 Safety Injection System and Volume Control System Category C Check Valve Quarterly Testing L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-027, Revision to 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2023-10-0303 October 2023 Revision to 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency 2024-08-23
[Table view] |
Text
Prairie Island Nuclear Generating Plant Operated by Nuclear Management Company, LLC L-PI-06-001 10 CFR 50.90 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Supplement to License Amendment Request (LAR) to Revise the Spent Fuel Pool Criticality Analvses and Technical Specifications (TS) 3.7.17, "Spent Fuel Pool Storage" and 4.3, "Fuel Storage" (TAC Nos. MC5811 and MC5812)
By letter dated February 1,2005, Nuclear Management Company (NMC) submitted an LAR to revise the spent fuel pool criticality analyses and Technical Specifications (TS) 3.7.17, "Spent Fuel Pool Storage" and 4.3, "Fuel Storage". By letters dated September 16,2005 and December 2,2005, NMC provided responses to the NRC requests for additional information regarding this LAR. This letter supplements the subject LAR to address December 19, 2005 telephone discussions with the Nuclear Regulatory Commission (NRC) Staff. NMC is submitting this supplement in accordance with the provisions of 10 CFR 50.90.
The spent fuel pool criticality calculations have been revised to include the effects of uncertainties due to pellet diameter and pellet clad thickness tolerances. Additional calculations were performed to support use of the 5% burnup uncertainty in the calculations which were previously submitted and to determine the effects of a 5%
reactivity decrement. The results of these calculations are provided in Enclosure 1.
This Enclosure supplements the responses submitted December 2, 2005.
The proposed changes in this supplement do not impact the conclusions of the Determination of No Significant Hazards Consideration and Environmental Assessment presented in the February 1, 2005 submittal as supplemented February 22, 2005, September 16,2005 and December 2,2005.
In accordance with 10 CFR 50.91, NMC is notifying the State of Minnesota of this LAR supplement by transmitting a copy of this letter and enclosure to the designated State Official.
1717 Wakonade Drive East Welch, Minnesota 55089-9642 Telephone: 651.388.1 121
Document Control Desk Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on JAN 0 5 2006 7-Thomas J. Palmisano Site Vice President, Prairie Island Nuclear Generating Plant Units 1 and 2 Nuclear Management Company, LLC Enclosure (1) cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC State of Minnesota
Enclosure 1 Supplementary Responses to NRC Request for Information dated July 26, 2005, Questions 6 and 14.
4 pages follow
Westinghouse Non-ProprietaryClass 3 Page 1 of 4 PCT-06-4 January 4,2006 Enclosure 1 Supplementary Responses to NRC RAI Questions 6 and 14 on the Prairie Island Spent Fuel Pool Criticality Submittal Summary of NRC's Request on Question 6:
The reactivity effects of fabrication tolerances on the fuel cladding and pellet diameters are not considered in the Prairie Island analysis. The NRC staff requests that NMC include the tolerances for pellet diameter and clad thickness or demonstrate why they need not be included for the Prairie Island analysis.
Nuclear Management Company (NMC) Response to Question 6:
The reactivity effects of fabrication tolerances from design drawings on the fuel cladding and pellet diameters have been explicitly considered through physics simulations, and the total biases and uncertainties have been updated.
The biases and uncertainties have been slightly impacted by the inclusion of fuel pellet and cladding uncertainties in the consideration of biases and uncertainties for the Prairie Island Units 1 & 2 spent fuel pool storage configurations. The largest positive increase in the total biases and uncertainties is 0.00029 Ak (in the All-Cell configuration), as shown in Table 1. This is within the C T K E N ~and well below the 0.00500 Ak margin that is included in the licensing submittal.
Table 1 . Reactivity Effects of Additional Fabrication Tolerances Original Updated Biases & Biases &
Storage Uncertainties Uncertainties Configuration Values Values Description (Ak) (Ak)
All Cell 0.02678 0.02707 Unshimmed 3x3 0.02403 0.024 17 Shimmed 3x3 0.028 16 0.02635
Westinghouse Non-ProprietaryClass 3 Page 2 of 4 PCT-06-4 January 4,2006 Enclosure 1 Supplementary Responses to NRC RAI Questions 6 and 14 on the Prairie Island Spent Fuel Pool Criticality Submittal Summary of NRC's Request on Question 14:
A 5 percent uncertainty on the maximum credited burnup is included in this analysis. However, this is not necessarily the equivalent of the 5 percent reactivity decrement described in the NRC guidance document (Memo from L. Kopp to T. Collins, "Guidance on the Regulatory Requirements for Criticality Analysis of Fuel Storage at Light-Water Reactor Power Plants," Dated August 1998). The staff requests that NMC includes a reactivity decrement or show that the burnup decrement which was included in the Prairie Island analysis is conservative.
Nuclear Management Company (NMC) Response to Question 14:
The original method of including a 5% burnup uncertainty is illustrated here in greater detail, and a justification of its technical merit is included. As supplementary information, the 5% reactivity decrement is determined to demonstrate further confidence in the nuclear criticality safety of the Prairie Island spent fuel pool.
The 5% reactivity decrement assumption for burnup uncertainty that is described in the NRC guidance memorandum has been evaluated for Prairie Island. The updated burnup uncertainty values that are determined using this method are summarized in Table 2. Also included is a summary of the impact on the total biases and uncertainties for each storage configuration.
Table 2. Results of 5% Reactivity Decrement Calculation Updated 5% Biases & Biases &
Storage Reactivity Uncertainties Uncertainties Configuration Decrement Values ~ifference' Description (Ak) (Ak) (Ak)
All Cell 0.01331 0.0290 1 0.00223 Unshimmed 3x3 0.01314 0.02800 0.00397 Shimmed 3x3 0.01312 0.02977 0.00 16 1 This change is relative to the "original biases & uncertainties values" that are included in Table 1. Therefore, the impacts of the additional fabrication tolerances are also included.
Westinghouse Non-ProprietaryClass 3 Page 3 of 4 PCT-06-4 January 4,2006 Enclosure 1 Supplementary Responses to NRC RAI Questions 6 and 14 on the Prairie Island Spent Fuel Pool Criticality Submittal The above table demonstrates that the difference in the biases & uncertainties remain within the 0.005 Ak margin that is built into this analysis. However, the 5% reactivity decrement method implicitly treats the behavior of reactivity with respect to burnup as a linear relationship. This relationship actually varies with burnup and enrichment, and this linear treatment does not necessarily capture any effects due to these variations. The method of determining the burnup uncertainty utilized in the original analysis does account for variations in the relationship of reactivity with respect to burnup. A more detailed analysis has been performed, and the results are presented in Table 3.
Table 3. Evaluation of 5% Burnup Uncertainty at Various Enrichments and Storage Configurations 5% Burnup WCAP-16517-NP Storage Configuration Bumax ABU5x Uncertainty 5% Burnup Description (MWdIMTU) (MWdIMTU) ( 4 Uncertainty (Ak) 3 W/OAll-Cell 14374 7 19 0.005647 0.01016 4 W/OAll-Cell 25722 1286 0.008489 0.01016 5 wlo All-Cell 37 148 1857 0.009152 0.01016 3 W/OUnshimmed 3x3 28363 1418 0.004383 0.00658 4 w/o Unshimmed 3x3 40470 2023 0.005527 0.00658 5 WIOUnshimmed 3x3 523 11 26 16 0.006490 0.00658 3 wlo Shimmed 3x3 23012 1151 0.006243 0.00752 4 W/OShimmed 3x3 33995 1700 0.007374' 0.00752 5 W/OShimmed 3x3 45175 2259 0.005754 0.00752 While the 5% burnup uncertainties in the All-Cell and Unshimmed 3x3 configurations do monotonically increase with respect to burnup, they are not necessarily linear. Furthermore, note that the uncertainty for 4 wlo 2 3 5 is
~ higher than that for 5 wlo 2 3 5 in ~ the Shimmed 3x3 configuration. This demonstrates that the slope changes with burnup, and that a linear representation (utilized in the 5% reactivity decrement method) does not realistically capture the physical nature of a 5% burnup uncertainty. However, the method that was utilized in the original analysis does represent this effect, and it is a technically justified approach of accounting for the 5% burnup uncertainty. The conservatism that is included in the original analysis yields results that remain bounding after a more detailed analysis has been conducted.
' A second-order polynomial fit of the 5% bumup uncertainty values vs. fuel enrichment yields a maximum value of 0.007381 Ak at 3.86 w/o 2 3 5 ~ This
. is slightly higher than that reported here, but still less than the originally reported value.
Westinghouse Non-ProprietaryClass 3 Page 4 of 4 PCT-06-4 January 4,2006 Enclosure 1 Supplementary Responses to NRC RAI Questions 6 and 14 on the Prairie Island Spent Fuel Pool Criticality Submittal In addition, if the 5% Ak uncertainties that are obtained with the reactivity decrement method are subsequently converted into equivalent burnup uncertainties (in MWdIMTU), it can be shown that the resulting uncertainty on burnup is quite large. The results of this exercise are shown in Table 4 for 5.0 w/o 2351 r Table 4.5% Reactivity Decrement Method's Equivalent Burnup Uncertainties Decrement Method Calculated Calculated Storage Actual 5% Burnup Burnup Configuration Bum,, ABUSCK Uncertainty Uncertainty Uncertainty Description (MWdlM TU) (MWdIMTU) (Ak) (MWd/MTU) 5 w10 All-Cell 37148 1857 0.01331 270 1 7.3 5 w10 Unshimmed 3x3 523 11 2616 0.01314 5364 10.3 5 wlo Shimmed 3x3 45175 2259 0.01312 5225 11.6 It is shown that the reactivity decrement method does not capture the physical behavior of a 5% burnup uncertainty for certain configurations and enrichments. This is due to the method's assumption that the reactivity varies linearly with burnup. This analysis has shown that reactivity does not necessarily vary linearly with burnup. The method in the original analysis considers the non-linear behavior of reactivity with respect to burnup, and in doing so, realistically captures the intent of a 5% burnup uncertainty. In addition, the burnup uncertainties that correspond to the decrement method's 5% Ak uncertainties have been determined and range from 7.3 to 11.6 %. Note that WCAP-7308-L-P-A, "Evaluation of Nuclear Hot Channel Uncertainties," determines the integrated reaction rate uncertainty is less than 5%. This uncertainty relates directly to burnup (burnup is dependent on powerlreaction rate), so a 5% burnup uncertainty is appropriate and conservative. For these reasons, we feel that the original method utilizing a 5% uncertainty on burnup is sufficient to address the burnup uncertainty and to ensure the nuclear criticality safety of the Prairie Island Units 1 & 2 spent fuel pool.