L M. Stinson (Mike)
Vice President Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5181 Fax 205.992.0341 4
SOUTHERN EM COMPANY Energy to Serve Your World' NL-04-0908 May 20, 2004 Docket No.:
50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Technical Specification Report 2-2004-1 Number of Steam Generator Tubes Plugged During 2R 10 Ladies and Gentlemen:
In accordance with the requirements of Vogtle Electric Generating Plant Technical Specification 5.6.10, Southern Nuclear Operating Company submits this report of the number of steam generator (SG) tubes plugged during the Unit 2 tenth maintenance/refueling outage (2R10).
As a result of the SG tube inservice inspections completed on May 8, 2004, a total of eleven (11) tubes were plugged. One tube was plugged in SG No. 1, five tubes were plugged in SG No. 2 of which two tubes were pulled for future evaluation with their SG openings plugged, three tubes were plugged in SG No. 3, and two tubes were plugged in SG No. 4.
This letter contains no NRC commitments. If you have any questions, please advise.
Sincerely, L. M. Stinson LMS/TDH/daj cc:
Southern Nuclear Operating Company Mr. J. B. Beasley, Jr., Executive Vice President Mr. J. T. Gasser, Vice President, Plant Vogtle Mr. WV. F. Kitchens, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatorv Commission Mr. L. A. Reyes, Regional Administrator Mr. C. Gratton, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle Ao+