LR-N04-0185, Steam Generator Tube Plugging Report as Required by Technical Specification 4.4.5.5.a
| ML041320507 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 05/03/2004 |
| From: | Mannon S Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N04-0185 | |
| Download: ML041320507 (2) | |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 MAY 0 3 2004 0 PSEG LR-N04-0185 Aluclear LLC United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 STEAM GENERATOR TUBE PLUGGING REPORT TECHNICAL SPECIFICATION 4.4.5.5.A SALEM GENERATING STATION UNIT NO. I FACILITY OPERATING LICENSE DPR-70 DOCKET NO. 50-272 Public Service Electric Gas Nuclear, LLC hereby submits the steam generator tube plugging report for Salem Unit No. 1 as required by Technical Specification 4.4.5.5.a for Facility Operating License DPR-70. The Steam Generator Tube in-service inspections were completed on April 19, 2004 during the Unit 1 16th refueling outage.
The following is a summary of the tubes plugged during 1 R16 as a result of eddy current inspections:
Steam Generator #1 1 -
16 tubes Steam Generator #12 -
3 tubes Steam Generator #13 -
13 tubes Steam Generator #14 -
5 tubes Salem Unit No. 1 steam generators total tube plugging average is 0.569%
If you have any questions or require additional information, please contact Mr. Michael Mosier at (856) 339-5434.
Sincerely, Steven R. Mann Manager - Nuclear Safety and Licensing
,pRtO\\
95-2168 REV. 7/99
Document Control Desk 2
LR-N04-0185 MAY 03 2004 C:
Mr. H. J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. D. Collins, Project Manager - Hope Creek/Salem U.S. Nuclear Regulatory Commission Mail Stop 08C2 Washington, DC 20555-0001 USNRC Senior Resident Inspector Salem (X24)
Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, New Jersey 08625