NLS2003122, Confirmation of Commitments, Per 11/13/03 Telephone Conference Regarding Diesel Generator Fuel Oil Strainer Fouling
| ML033430312 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 12/04/2003 |
| From: | Minahan S Nebraska Public Power District (NPPD) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NLS2003122 | |
| Download: ML033430312 (2) | |
Text
Nebraska Public Power District Always there when you need us NLS2003122 December 4, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Confination of Commitments Cooper Nuclear Station, NRC Docket 50-298, DPR-46
Reference:
Telephone Conference, "Diesel Generator Fuel Oil Strainer Fouling," of November 13, 2003 between Stewart Minahan, et al, (NPPD), Kriss Kennedy, et al, (NRC-Region IV) and Michelle Iloncharik, et al, (NRC-NRR)
The purpose of this letter is to confirm on the docket the understanding of and commitment to actions being taken as discussed in the referenced telephone conference. This letter provides confinnation of Nebraska Public Power District's (NPPD) commitment to these actions as detailed below.
I) As an interim action, NPPD will obtain a monthly bottom thief sample from te Diesel Generator Fuel Oil Storage Tanks and analyze these samples for particulate concentration.
- 2)
As an interim action, NPPD will increase the frequency of the Diesel Fuel Oil Strainers cleaning to once per month.
- 3)
As a corrective action to mitigate the effects of corrosion, NPPD will line te Diesel Generator Fuel Oil Storage Tanks during te next refueling outage. Items I) and 2) will no longer be required upon completion of this action.
Should you have any questions concerning this matter, please contact Paul Fleming at (402) 825-2774.
S rB.
inalian Acting Site Vice President
/d wv Attachment cc:
Regional Administrator Senior Project Manager USNRC - Region I\\
USNRC - NRR Project Directorate IV-I Senior Resident Inspector Records E D USNRC COOPER NUCLEAR STATION P.O. Box 98 / arownville, NE 68321-0098 Telephone: (402) 825-3811 / rtm: (402) 825-5211 www.nppd.com
O.
l ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© I
Correspondence Number:
NLS2003122 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are I not regulatory commitments. Please notify the Licensing & Regulatory Affairs Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE
- 1) As an interim action, NPPD vill obtain a monthly bottom thief Interim action in place by sample from the Diesel Generator Fuel Oil Storage Tanks and analyze 12/15/2003 these samples for particulate concentration.
- 2) As an interim action, NPPD wvill increase the frequency of the Diesel Interim action in place by Fuel Oil Strainers cleaning to once per month.
12/15/2003
- 3) As a corrective action to mitigate the effects of corrosion, NPPD will line the Diesel Generator Fuel Oil Storage Tanks during the next RE22 refueling outage. Items I) and 2) will no longer be required upon completion of this action.
4 4
4 I
PROCEDURE 0.42 l
REVISION 13 l
PAGE 14 OF 16