Special Report - Steam Generator Tube Inservice Examination
ML033240373
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/05/2003
From: Price J
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
B19007, FOIA/PA-2005-0210
Download: ML033240373 (5)


Text

Dominion Nuclear Connecticut, Inc.

Millstone Power Station D mno Rope Ferry Road Waterford, CT 06385 NOV 5 2JQ Docket No. 50-336 B19007 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Power Station, Unit No. 2 Special Report - Steam Generator Tube Inservice Examination This special report is being submitted pursuant to the requirements of Plant Technical Specifications 6.9.2.j and 4.4.5.1.5.a. Specification 4.4.5.1.5.a requires a special report be submitted to the commission within 15 days following completion of each steam generator tube inservice inspection, to document the number of tubes plugged.

The end of cycle 15 eddy current inspections were completed on October 25, 2003.

The inspection examined one hundred percent of the tubes in steam generator number 2, or approximately 50 percent of the total population of tubes. No tubes were removed from service as a result of the examination.

The tables contained within Attachment 1 briefly summarize the number of tubes examined, types of examinations, and results. Eddy current testing identified flaws in two (2) tubes resulting from fan bar wear (less than 11 percent throughwall), and five (5) tubes with loose part wear or single volumetric indications (less than 24 percent throughwall). The loose parts which caused the tube damage were located below the first support plate and removed from the steam generator during the Foreign Object Search and Retrieval. The complete results of the steam generator tube inspection will be included in the Annual Operating Report, which is expected to be issued in February 2004.

There are no regulatory commitments contained within this letter.

Should you have any questions regarding this submittal, please contact Mr. David W. Dodson at (860) 447-1791, extension 2346.

Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.

J. Alan Price Site V President - Millstone cc: See next page AN -7

0

~ L U.S. Nuclear Regulatory Commission B19007/Page 2 Attachment (1) cc: H. J. Miller, Region I Administrator R. B. Ennis, NRC Senior Project Manager, Millstone Unit No. 2 Millstone Senior Resident Inspector

Docket No. 50-336 B19007 Attachment 1 Millstone Power Station, Unit No. 2 Steam Generator Tube Plugging 15 Day Report Tables

-. r U.S. Nuclear Regulatory Commission B19007/Attachment 1/Page 1 Millstone Power Station, Unit No. 2 Steam Generator Tube Plugcginn 15 Day Report Tables Table 1 - Millstone 2R15 ECT Summary S/G 2 Number of Tubes (S/G 2 Only) 8523 Number of Tubes Inspected F/L w/ Bobbin Probe 8523 Number of Tubes Incomplete w/ Bobbin Probe 0 Number of Tube Inspections w/ MRPC (Total) 214

. Hot Leg Transitions - Original Scope 140

  • Hot Leg Transitions - Expansion 0
  • Hot Leg Misc. Special Interest - Diagnostic Exams and from 56 Previous History (number of tubes)
  • Cold Leg Misc. Special Interest - Diagnostic Exams and from 16 Previous History (number of tubes)

. U-bend Misc. Special Interest - Diagnostic Exams (number of 2 tubes).

Tubes with Max Fan Bar Wear 240% 0 Tubes with Max Fan Bar Wear >20% but < 40% 0 Tubes with Max Fan Bar Wear < 20% 2 Tubes with Max Volumetric Hot Leg Ž 40% 0 Tubes with Max Volumetric Hot Leg Ž220% but < 40% 3 Tubes with Max Volumetric Hot Leg < 20% 0 Tubes with Max Volumetric Cold Leg 240% 0 Tubes with Max Volumetric Cold Leg 20% but < 40% 2 Tubes with Max Volumetric Cold Leg < 20% 0 Tubes Plugged 0 Table 2 - MRPC Diagnostic Exams from History and Current Indications All Hot Leg Straight Cold Leg Straight Fan Bars -U-bend Exams Exams Exams Exams Scheduled/Tubes Scheduled/Tubes Scheduled/Tubes Scheduled/Tubes 88/74 68/56 16/16 2/2 Tubes were scheduled multiple times on the Hot Leg Programs to allow for additional information, e.g., positive identification or flaw sizing.

U.S. Nuclear Regulatory Commission B19007/Attachment 1/Page 2 Table 3 - Percent Indications (Maximum Indication per Tube)

Percent Range Hot Leg Straight Cold Leg Straight Fan Bars (U-bend) 1 -19% 0 0 2 20 - 29% 3 2 0 30-39% 0 0 0 40 -100% 0 0 0