RC-03-0231, Submittal of Information Requested by NRC for Integrity Evaluation for Future Operation: Reactor Vessel Nozzle to Pipe Weld Regions

From kanterella
(Redirected from ML033140091)
Jump to navigation Jump to search
Submittal of Information Requested by NRC for Integrity Evaluation for Future Operation: Reactor Vessel Nozzle to Pipe Weld Regions
ML033140091
Person / Time
Site: Summer 
Issue date: 11/06/2003
From: Byrne S
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RC-03-0231
Download: ML033140091 (6)


Text

Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY November 6, 2003 RC-03-0231 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 SUBMITTAL OF INFORMATION REQUESTED BY NRC FOR INTEGRITY EVALUATION FOR FUTURE OPERATION VIRGIL C. SUMMER NUCLEAR STATION (VCSNS):

REACTOR VESSEL NOZZLE TO PIPE WELD REGIONS

References:

1. S. A. Byrne (SCE&G) to Document Control Desk (NRC) letter (RC-02-0088), Submittal of Information Requested by NRC for Integrity Evaluation for Future Operation Virgil C. Summer Nuclear Station (VCSNS): Reactor Vessel Nozzle to Pipe Weld Regions, May 4, 2002
2. S. A. Byrne (SCE&G) to Document Control Desk (NRC) letter (RC-02-0108), Response to Request for Additional Information Regarding V.C. Summer's MSIP Analysis, June 21, 2002
3. Karen R. Cotton (NRC) to S. A. Byrne (SCE&G) letter, Safety Evaluation of Flaws Detected In V.C. Summer Nozzle-to-Pipe Welds in the Hot Legs of Loops B and C (TAC No. MB4870), October 1, 2002
4. S. A. Byrne (SCE&G) to Document Control Desk (NRC) letter, Request to Use Alternatives to ASME Boiler and Pressure Vessel Code, Section Xl (RC-03-0142) dated July 11, 2003.
5. S. A. Byrne (SCE&G) to Document Control Desk (NRC) letter (RC-03-0229), Response to Request for Additional Information Regarding Request to Use Alternatives to ASME Boiler and Pressure Vessel Code,Section XI, Relief Request RR-11-20 (0-C-03-0262),

November 3, 2003.

Attachments:

NDE Results from V. C. Summer Outlet Nozzle to Pipe Welds Zi SCE&G I Virgil C. Summer Nuclear Station P. O. Box 88. Jenkinsville, South Carolina 29065.T (803) 345.5209

  • wwwsrona.com

I Document Control Desk 0-C-00-1392 RC-03-0231 Page 2 of 4 Introduction South Carolina Electric and Gas (SCE&G) examined the VCSNS Reactor Vessel nozzle dissimilar metal welds during refueling outage 14 (RF-14).

Ultrasonic testing (UT), eddy current testing (ET), remote visual examination, and surface profile mapping were included.

These activities were performed as part of the 10 year ASME Inservice Inspection (ISI) for VCSNS and as follow up to examinations initiated as a result of the NRC evaluation of VCSNS RF-12 for a cracked weld in the RCS "Am loop piping and RF-13 for implementation of Mechanical Stress Improvement Process (MSIP).

SCE&G is providing the results to satisfy the commitments contained in References 1 and 2 and directed through Reference 3.

Results Inspection results are included in the attachment to this letter. To facilitate review, we have tabulated the data for comparison with results of RF-12 (2000) and RF-13 (2002). The results demonstrate that previously identified indications were identified and characterized, and that there was no crack growth on those indications.

Specifically:

Eddy Current Testing (ET)

All previous indications identified in RF-12 and RF-13 were found in RF-14. No new indications were identified in RF-14.

There is no evidence of growth in any indications previously noted by ET.

Ultrasonic Testinq (UT)

Automated ultrasonic examinations of the VCSNS Reactor Vessel nozzle to pipe dissimilar metal welds yielded one recordable indication in C hot-leg. Previously, in RF-13, this indication was noted as a surface breaking flaw. UT performed in RF-14 identifies this indication as an embedded flaw (see Note 3 of the attached Table).

This indication was assessed in terms of the criteria in the ASME Code, Section Xl, 1989 Edition, no Addenda, Article IWB-3000, Paragraph IWB-3500; and was found to be within the allowable limits specified with no further evaluation required.

The previous indication noted in the B hot-leg that became transparent after implementation of the MSIP, remained transparent to UT.

Document Control Desk 0-C-00-1 392 RC-03-0231 Page 3 of 4 Future Examinations For the Reactor Vessel A hot-leg and cold-leg nozzle welds, the B cold-leg weld, and the C hot-leg and cold-leg welds, reexamination will occur once in the third SI interval. For the B hot-leg, the accepted flaw will be reexamined during the next three successive inspection periods (as defined in the VCSNS Inservice Inspection [ISI] Plan) in accordance with IWB-2420 (b) and (c) requirements. IWB-2420 (c) permits the utility to revert to the original ISI Plan after three reexaminations if the results are acceptable. This approach will provide definitive evidence that the B hot leg nozzle to pipe welds continue to be operable. The three successive examinations for B-loop will commence in the third ISI Interval that begins January 2004. The earlier commitment (Reference 2) to reexamine the C hot-leg weld in the next three successive inspection periods is rescinded. This indication was noted as a surface breaking flaw in RF-13, but UT performed in RF-14 determines this indication is an embedded flaw (see Note 3 of the attached Table) which removes the need for reexamination.

SCE&G will perform future inspections in accordance with ASME Code, Section Xl.

Inspection methods and technology utilized for future inspections will be implemented in accordance with ASME Code requirements.

Where VCSNS cannot accommodate the Code requirements, relief will be requested from the Code.

Conclusion SCE&G has met the commitments made from RF-13 for VCSNS through the inspections just completed in our current RF-14.

RF-14 examinations demonstrate that current examination methods accurately characterize indications. There were no indication results noted as "not a flaw" nor were there any inconclusive indication results by the RF-1 4 examinations.

The results of these examinations demonstrate that the alternate examination to Appendix Vil, Supplement 10, as implemented through the PDI Program support NRC approval of relief request RR-11-20 submitted by SCE&G for VCSNS (Reference 4).

SCE&G concludes from review and evaluation of the results that the plant is safe to startup and operate in the future in accordance with the requirements of ASME Code. In order not to impact the start up schedule, your approval is requested by November 12, 2003.

Document Control Desk 0-C-00-1392 RC-03-0231 Page 4 of 4 Should you have any questions, please call Mr. Ron Clary at (803) 345-4757 at your convenience.

Very truly yours, ephen A. Byrne A'tEk g

OF gy JT/SAB Attachment c:

N. 0. Lorick N. S. Cams T. G. Eppink R. J. White L. A. Reyes K. R. Cotton K. M. Sutton Dr. S. Doctor NRC Resident Inspector NSRC RTS (0-C-00-1392)

File (810.58)

DMS (RC-03-0231)

Document Control Desk Attachment 0-C-00-1 392 RC-03-0231 Page 1 of 2 V.C. Summer 2000, 2002 and 2003 RV Nozzle Dissimilar Metal Weld Results Summary (2003 Ultrasonic Examinations are Appendix VIII with Supplemental Eddy Current)

EDDY CURRENT ULTRASONIC NOZZLE IND.

ORIENTATION LOCATION LENGTH LOCATION DEPTH LENGTH DATE/EXAM "A" 250 OUTLET CIRC 1560-2060 NOTE 1 NO INDICATIONS 2003 (FIRSTIS0) iC" 950 INLET 1

CIRC 2000 0.50 NO INDICATIONS 2000 CIRC 2000 0.125" NOTE 6 NO INDICATIONS 2003 ISI "C' 1450 OUTLET 1

CIRC 3090 0.5" 2000 1

CIRC 3000 0.5" 299.40 0.11" 0.375" 2002 PRE - MSIP 1

CIRC 3100 0.5" 2990 0.11" 0.375" 2002 POST-MSIP 1

CIRC 310.30 0.375" NOTE 4 2003 SI NOTE 3 298.790 0.11" 0.625" 2003 ISI "B"

2150 INLET NO INDICATIONS NO INDICATIONS 2000 NO INDICATIONS NO INDICATIONS 2003 ISI "B" 265° OUTLET 1

AXIAL 200.80 0.25" NOT DETECTED 2000 1

AXIAL 2000 0.5" 2020 0.317" 0.625" 2002 PRE - MSIP 1

AXIAL 200.40 0.5" NOT DETECTED 2002 POST-MSIP 1

AXIAL 200.80 0.32" NOTE 4 NOT DETECTED 2003 ISI 2

CIRC 350 0.6" NOT DETECTED 2000 2

CIRC 500 0.36"/0.5" NOT DETECTED 2002 PRE - MSIP 2

CIRC 500 0.5" NOT DETECTED 2002 POST-MSIP 2

CIRC 480 0.5" NOT DETECTED

_____2003 ISI 3

CIRC 3480 0.25" NOT DETECTED 2000 3

CIRC 3400 NOTE 2 0.25" NOT DETECTED 2002 PRE - MSIP 3

CIRC 3400 NOTE 2 0.25" NOT DETECTED 2002 POST - MSIP 3

NOTE 5 NOT DETECTED 2003 ISI A" 3350 INLET 1

CIRC 3260 0.5" NO INDICATIONS 2000 1

CIRC 3260 0.375" NOTE 4 NO INDICATIONS

__________2003 ISI

Document Control Desk Attachment 0-C-00-1 392 RC-03-0231 Page 2 of 2 Notes 1

Intermittent Eddy Current indication. Visual examination confirms a surface scratch-like indication consistent with the location of the Eddy Current indication. There are no ultrasonic detections in the weld. The surface condition of the replacement weld was confirmed as smooth and flat using surface profiling techniques with no limitations in the application of the Appendix VIII Ultrasonic exam procedure.

2 Interpreted in 2002 as possibly the result of geometry and/or material variations.

3 Weak correlation between Ultrasonic and Eddy Current data in 2002 examination reported. 2003 examination confirms ultrasonic flaw is embedded with 0.43" inch ligament of metal between flaw and ID surface with no surface connecting characteristics noted in the data. Indication length differences are a result of increased exam sensitivity and Appendix VIII procedure measurement differences.

4 Result of finer increment size in 2003 data.

5 Considered not valid in 2003 analysis.

6 Shorter length in 2003 data interpreted to be the result of shorter flaw seen adjacent to surface geometry indication.