VPN-024-200, Errata to Annual Report of Status of Decommissioning Funding for Trojan Nuclear Plant in Accordance with 10 CFR 50.75
ML030980544 | |
Person / Time | |
---|---|
Site: | Trojan File:Portland General Electric icon.png |
Issue date: | 03/31/2003 |
From: | Quennoz S Portland General Electric Co |
To: | Document Control Desk, NRC/FSME |
References | |
+sunsi/sispmjr=200603, -RFPFR, PGE-1061, PGE-1078, VPN-024-2003 | |
Download: ML030980544 (2) | |
Similar Documents at Trojan | |
---|---|
Category:Annual Report
MONTHYEARVPN-003-202, Portland General Electric Co., Annual Financial Report for Year 20222023-05-10010 May 2023
[Table view]Portland General Electric Co., Annual Financial Report for Year 2022 VPN-005-202, Portland General Electric Co., Annual Financial Report for Year 20212022-04-14014 April 2022 Portland General Electric Co., Annual Financial Report for Year 2021 VPN-003-201, Portland General Electric Company - Annual Financial Report for Year 20172018-03-28028 March 2018 Portland General Electric Company - Annual Financial Report for Year 2017 VPN-004-201, Trojan ISFSI Annual Financial Report for Year 20092010-04-0101 April 2010 Trojan ISFSI Annual Financial Report for Year 2009 VPN-007-200, Trojan ISFSI Annual Financial Reports for Fiscal Year 20052006-06-22022 June 2006 Trojan ISFSI Annual Financial Reports for Fiscal Year 2005 VPN-012-200, Annual Report of the Status of Decommissioning Funding for the Trojan Nuclear Plant in Accordance with 10 CFR 50.75(f)(1)2005-03-31031 March 2005 Annual Report of the Status of Decommissioning Funding for the Trojan Nuclear Plant in Accordance with 10 CFR 50.75(f)(1) VPN-006-200, Transmittal of PGE-1065-2004, Trojan Nuclear Plant Annual Radioactive Effluent Release Report for 20042005-02-25025 February 2005 Transmittal of PGE-1065-2004, Trojan Nuclear Plant Annual Radioactive Effluent Release Report for 2004 VPN-024-200, Errata to Annual Report of Status of Decommissioning Funding for Trojan Nuclear Plant in Accordance with 10 CFR 50.752003-03-31031 March 2003 Errata to Annual Report of Status of Decommissioning Funding for Trojan Nuclear Plant in Accordance with 10 CFR 50.75 VPN-021-200, Annual Report of Status of Decommissioning Funding for Trojan Nuclear Plant in Accordance with 10 CFR 50.752003-03-27027 March 2003 Annual Report of Status of Decommissioning Funding for Trojan Nuclear Plant in Accordance with 10 CFR 50.75 2023-05-10 Category:Letter type:VPN MONTHYEARVPN-010-202, Portland General Electric Company - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023
[Table view]Portland General Electric Company - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation VPN-009-202, Portland General Electric Company - Biennial Report of Changes to NRC-Approved Quality Assurance Program2023-09-25025 September 2023 Portland General Electric Company - Biennial Report of Changes to NRC-Approved Quality Assurance Program VPN-008-202, Portland General Electric Company Revision 31 to PGE-8010, Trojan ISFSI Quality Assurance Program2023-09-14014 September 2023 Portland General Electric Company Revision 31 to PGE-8010, Trojan ISFSI Quality Assurance Program VPN-001-202, Transmittal of Revision 17 to PGE-J0691 Trojan- Independent Spent Fuel Storage Installation (ISFSI) Safety Analysis Report2022-01-13013 January 2022 Transmittal of Revision 17 to PGE-J0691 Trojan- Independent Spent Fuel Storage Installation (ISFSI) Safety Analysis Report VPN-006-202, Portland General Electric Co., Revision 30 to PGE-8010, Trojan Nuclear Quality Assurance Program2021-10-26026 October 2021 Portland General Electric Co., Revision 30 to PGE-8010, Trojan Nuclear Quality Assurance Program VPN-007-202, Trojan Independent Spent Fuel Storage Installations (ISFSI) - Radiological Decommissioning Cost Estimate and Funding Plans Additional Documentation2020-07-0808 July 2020 Trojan Independent Spent Fuel Storage Installations (ISFSI) - Radiological Decommissioning Cost Estimate and Funding Plans Additional Documentation VPN-006-020, VPN-006-2020 Pge Request for Temporary Exemption2020-05-13013 May 2020 VPN-006-2020 Pge Request for Temporary Exemption VPN-055-202, Trojan ISFSI, Transmittal of Annual Financial Report for Year 20192020-04-0909 April 2020 Trojan ISFSI, Transmittal of Annual Financial Report for Year 2019 VPN-004-202, Trojan Independent Spent Fuel Storage Installations (ISFSI) Radiological Decommissioning Cost Estimate and Funding Plans2020-03-23023 March 2020 Trojan Independent Spent Fuel Storage Installations (ISFSI) Radiological Decommissioning Cost Estimate and Funding Plans VPN-002-202, Portland General Electric Co. - Annual Report of Individual Occupational Radiation Dose Monitoring2020-01-27027 January 2020 Portland General Electric Co. - Annual Report of Individual Occupational Radiation Dose Monitoring VPN-011-201, Trojan ISFSI - Biennial Report of Changes to NRC-Approved Quality Assurance Program2019-07-17017 July 2019 Trojan ISFSI - Biennial Report of Changes to NRC-Approved Quality Assurance Program VPN-009-201, Submittal of Response to NRCs Request for Additional Information Related to the Trojan ISFSI License Change Application (Lca 72-07) for License Renewal (CAC No. 001028)2019-06-10010 June 2019 Submittal of Response to NRCs Request for Additional Information Related to the Trojan ISFSI License Change Application (Lca 72-07) for License Renewal (CAC No. 001028) VPN-007-201, Portland General Electric Co., Submittal of Annual Financial Report for Year 20182019-04-0202 April 2019 Portland General Electric Co., Submittal of Annual Financial Report for Year 2018 VPN-003-201, Portland General Electric Company - Annual Financial Report for Year 20172018-03-28028 March 2018 Portland General Electric Company - Annual Financial Report for Year 2017 VPN-001-201, Trojan ISFSI - Annual Report of Individual Occupational Radiation Dose Monitoring from December 28, 2016 Through January 02, 20182018-01-25025 January 2018 Trojan ISFSI - Annual Report of Individual Occupational Radiation Dose Monitoring from December 28, 2016 Through January 02, 2018 VPN-004-201, Trojan ISFSI Annual Financial Report for Year 20092010-04-0101 April 2010 Trojan ISFSI Annual Financial Report for Year 2009 VPN-008-200, Transmittal of Revision 7 to the Trojan Independent Spent Fuel Storage Installation Emergency Plan, PGE-10752006-08-29029 August 2006 Transmittal of Revision 7 to the Trojan Independent Spent Fuel Storage Installation Emergency Plan, PGE-1075 VPN-007-200, Trojan ISFSI Annual Financial Reports for Fiscal Year 20052006-06-22022 June 2006 Trojan ISFSI Annual Financial Reports for Fiscal Year 2005 VPN-020-200, PGE-1061, Trojan Nuclear Plant Defueled Safety Analysis Report and License Termination Plan (PGE-1078), Revision 22, and Subsequent Deletion as an Active Topical Report and Licensing Basis Document2005-06-0606 June 2005 PGE-1061, Trojan Nuclear Plant Defueled Safety Analysis Report and License Termination Plan (PGE-1078), Revision 22, and Subsequent Deletion as an Active Topical Report and Licensing Basis Document VPN-028-200, Trojan Nuclear Plant, ISFSI, Request to Update Service List2005-05-31031 May 2005 Trojan Nuclear Plant, ISFSI, Request to Update Service List VPN-016-200, Trojan Nuclear Plant/Isfsi, Termination of the Planned Acquisition of Common Stock of Portland General Electric Company by Oregon Electric Utility Company. LLC2005-04-20020 April 2005 Trojan Nuclear Plant/Isfsi, Termination of the Planned Acquisition of Common Stock of Portland General Electric Company by Oregon Electric Utility Company. LLC VPN-014-200, 1 of PGE-1061. Trojan Nuclear Plant Defueled Safety Analysis Report and License Termination Plan (PGE-1078) (A.K.A.. Tnp Decommissioning Plan)2005-03-31031 March 2005 1 of PGE-1061. Trojan Nuclear Plant Defueled Safety Analysis Report and License Termination Plan (PGE-1078) (A.K.A.. Tnp Decommissioning Plan) VPN-012-200, Annual Report of the Status of Decommissioning Funding for the Trojan Nuclear Plant in Accordance with 10 CFR 50.75(f)(1)2005-03-31031 March 2005 Annual Report of the Status of Decommissioning Funding for the Trojan Nuclear Plant in Accordance with 10 CFR 50.75(f)(1) VPN-011-200, PGE-1009-2004. Operational Ecological Monitoring Program for the Trojan Nuclear Plant, Annual Report for 20042005-03-11011 March 2005 PGE-1009-2004. Operational Ecological Monitoring Program for the Trojan Nuclear Plant, Annual Report for 2004 VPN-005-200, Transmittal of PGE- 1015-2004. Annual Report of the Trojan Nuclear Plant for 20042005-02-25025 February 2005 Transmittal of PGE- 1015-2004. Annual Report of the Trojan Nuclear Plant for 2004 VPN-006-200, Transmittal of PGE-1065-2004, Trojan Nuclear Plant Annual Radioactive Effluent Release Report for 20042005-02-25025 February 2005 Transmittal of PGE-1065-2004, Trojan Nuclear Plant Annual Radioactive Effluent Release Report for 2004 VPN-003-200, Request an Update to the Service List Used for Delivery of Documents from NRC2005-01-0606 January 2005 Request an Update to the Service List Used for Delivery of Documents from NRC VPN-078-200, Trojan Nuclear Plant - Application for Termination of License2004-12-20020 December 2004 Trojan Nuclear Plant - Application for Termination of License VPN-074-200, Ltr to Director, Riv, DNMS, U.S. NRC from Stephen M. Quennoz, VP, Generation, Records Required to Be Forwarded to NRC, Riv Office Prior to Termination of the Trojan Nuclear Plant License2004-12-20020 December 2004 Ltr to Director, Riv, DNMS, U.S. NRC from Stephen M. Quennoz, VP, Generation, Records Required to Be Forwarded to NRC, Riv Office Prior to Termination of the Trojan Nuclear Plant License VPN-077-200, Trojan Nuclear Plant Final Survey Report for Support Facilities and Site Grounds2004-12-20020 December 2004 Trojan Nuclear Plant Final Survey Report for Support Facilities and Site Grounds VPN-076-200, Trojan Nuclear Plant Final Survey Report for Spent Fuel Pool (SFP) Impacted Areas2004-12-16016 December 2004 Trojan Nuclear Plant Final Survey Report for Spent Fuel Pool (SFP) Impacted Areas VPN-070-200, Response to Request for Additional Information Regarding Application for Consent to Indirect Transfer of Facility Licenses2004-12-0909 December 2004 Response to Request for Additional Information Regarding Application for Consent to Indirect Transfer of Facility Licenses VPN-069-200, Trojan Nuclear Plant Final Survey Report for Remaining Plant Secondary Systems2004-11-22022 November 2004 Trojan Nuclear Plant Final Survey Report for Remaining Plant Secondary Systems VPN-063-200, Trojan Nuclear Plant Final Survey Report for Embedded Piping2004-11-10010 November 2004 Trojan Nuclear Plant Final Survey Report for Embedded Piping VPN-061-200, Letter to Secretary to the Commission from Stephen M. Quennoz, Answer to Order for Implementation of Additional Security Measures Associated with Access Authorization for Trojan Nuclear Power Plant2004-10-14014 October 2004 Letter to Secretary to the Commission from Stephen M. Quennoz, Answer to Order for Implementation of Additional Security Measures Associated with Access Authorization for Trojan Nuclear Power Plant VPN-057-200, Transmittal of Trojan Nuclear Plant Final Survey Report - for the Turbine Building and Control Building Interiors2004-10-12012 October 2004 Transmittal of Trojan Nuclear Plant Final Survey Report - for the Turbine Building and Control Building Interiors VPN-056-200, Trojan Final Status Survey Report for the Main Steam Support Structure, Electrical Penetration Area and Steam Generator Blowdown Building2004-10-0707 October 2004 Trojan Final Status Survey Report for the Main Steam Support Structure, Electrical Penetration Area and Steam Generator Blowdown Building VPN-044-200, Supplemental Information in Support of Application for Consent to Indirect Transfer of Facility Licenses2004-09-29029 September 2004 Supplemental Information in Support of Application for Consent to Indirect Transfer of Facility Licenses VPN-050-200, Letter to Office to the Secretary of the Commission from Stephan M. Quennoz, Answer to Order for Implementation of Additional Security Measures Associated with Access Authorization for Trojan Nuclear Power Plans2004-09-0707 September 2004 Letter to Office to the Secretary of the Commission from Stephan M. Quennoz, Answer to Order for Implementation of Additional Security Measures Associated with Access Authorization for Trojan Nuclear Power Plans VPN-026-200, Transmittal of Trojan Nuclear Plant Final Survey Report for the Main Steam Support Structure, Electrical Penetration Area and Steam Generator Blowdown Building2004-03-30030 March 2004 Transmittal of Trojan Nuclear Plant Final Survey Report for the Main Steam Support Structure, Electrical Penetration Area and Steam Generator Blowdown Building VPN-059-200, Trojan Nuclear Plant - Final Survey Report for the Containment Building Interior2003-10-31031 October 2003 Trojan Nuclear Plant - Final Survey Report for the Containment Building Interior VPN-024-200, Errata to Annual Report of Status of Decommissioning Funding for Trojan Nuclear Plant in Accordance with 10 CFR 50.752003-03-31031 March 2003 Errata to Annual Report of Status of Decommissioning Funding for Trojan Nuclear Plant in Accordance with 10 CFR 50.75 VPN-021-200, Annual Report of Status of Decommissioning Funding for Trojan Nuclear Plant in Accordance with 10 CFR 50.752003-03-27027 March 2003 Annual Report of Status of Decommissioning Funding for Trojan Nuclear Plant in Accordance with 10 CFR 50.75 VPN-022-200, PGE-1061, Trojan Nuclear Plant Decommissioning Plan & License Termination Plan (PGE-1078), Revision 162003-03-27027 March 2003 PGE-1061, Trojan Nuclear Plant Decommissioning Plan & License Termination Plan (PGE-1078), Revision 16 VPN-004-200, PGE-1061, Rev 9, Trojan Nuclear Plant Decommissioning Plan and License Termination Plan2001-03-0606 March 2001 PGE-1061, Rev 9, Trojan Nuclear Plant Decommissioning Plan and License Termination Plan VPN-102-99, Letter Transmitting Revision 0.1 to Trojan Nuclear Plant Site Characterization Report, as Requested by the NRC on 9912071999-12-27027 December 1999 Letter Transmitting Revision 0.1 to Trojan Nuclear Plant Site Characterization Report, as Requested by the NRC on 991207 2023-09-25 |
Text
PGE/
Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River Hwvy Rainrer, OR 97048 (503) 556-3713 March 31, 2003 VPN-024-2003 Trojan Nuclear Plant Docket 50-344 License NPF-1 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Errata to the Annual Report of the Status of Decommissioning Funding for the Trojan Nuclear Plant in Accordance with 10 CFR 50.75(f)(1)
Section 5, "Update of Site-Specific Decommissioning Costs," of PGE-1061, "Trojan Nuclear Plant Decommissioning Plan and License Termination Plan (PGE-1078)," was enclosed with the previously issued subject report. The copy of Table 5-2 in that enclosure was, however, copied on incorrectly sized paper resulting in obliteration of some of the data. This errata provides a replacement copy of Table 5-2.
If you have any questions regarding this correspondence, please contact Mr. Lansing G. Dusek of my staff at (503) 556-7409.
Sincerely, Stephen M. Quennoz Vice President Power Supply/Generation Enclosure 9 r;,5 c:
S. W. Brown, NRC, NMSS Director, NRC Region IV, DNMS D. Stewart-Smith, OOE A. Bless, OOE p~-y S 3 DtI 0*
Connecting People, Power and Possibilities