Dave Morey Southern Nuclear Vice President Operating C:.mpany farley Project P.O. Box 1295 Birmingham. Afabama 35201 Tel 205.992.5131 May 12, 1999 SOUTHERN COMPANY Docket Nos.:
50-348 50 364 y,,,,,,, S,,,, g,, y,yg.
NEL-99-0200 U. S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:
Enclosed are the April 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, f
kh Dave Morey RWC:mor Enclosares:
- 1. April Monthly Operating Repor6 for Plant Farley Unit 1
- 2. April Monthly Operating Report for Plant Farley Unit 2 l
I f9 9905180235 990430 PDR ADOCK 05000348 R
. t,.
J' Page 2 U. S. Nuclear Regulatory Commission ec:
Southern Nuclear Operating Company Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. J.1. Zimmerman, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region 11 Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley i
1
OPERATING DATA REPORT DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit i DATE:
May 4,1999 COMPLETED BY:
W. L. Marlar TELEPIIONE:
(334) 814-4554 OPERATING STATUS 1.
Reporting Period:
APRIL 1999 2.
Design Electrical Rating (Net MWe):
854 3.
Maximum Dependable Capacity (Net MWe):
847 i
This. Month Year..to_Date Cumulative 4.
Number Of Hours Reactor Was Critical:
719.0 2,879.0 151,782.2 5.
Ilours Generator On-line:
719.0 2,879.0 149,638.7 6.
Unit Reserve Shutdown Hours:
0.0 0.0 0.0 7.
Net Electrical Energy Generated (MWH):
605,082.0 2,387,100.0 117,921,417.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES i
Date i Tag No.
I hvent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
El-1
UNIT SHUTDOWNS DOCKET NO.:
50-348 UNIT NAME:
J. M. Farley - Unit 1 DATE:
May 4,1999 l
COMPLETED BY:
W. L. Marlar REPORTING PERIOD: APRIL 1999 TELEPIIONE:
(334) 814-4554 j
i Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date S: Scheduled i (Hours)
(1)
(2)
Comments There were no unit shutdowns during the month.
j (1) KLASUN u) M Lauv u.
A Liquipment railure(Explain) 1 - Manual 11 MaintenanceorTest 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuauon E - Operator Training / License Examination 5 - Other(Explain)
F Administrative 0 - Operational Error (Explain) 11 - Other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.
t j
El-2
s.
OPERATING DATA REPORT DOCKET NO.:
. _ ___5 0-3 64._ __
UNIT NAME:
,_ J. M. Farley - Unit 2 DATE:
May_4,1999___
COMPLETED IlY:
TELEPilONE:
W. L. Marlar__ _
_ 0 34) 814-4554 __
l PERATING STATUS Reporting Period:
APRIL 1999_ _
Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe): __
855 852_
This31onth Year to Date Cumulative Number OfIlours Reactor Was Critical:
llours Generator On-line:
719.0 2,879.0 135,347.4_
719.0 2,879.0 133,524.4 Unit Reserve Shutdown Hours:
0.0 0.0 0.0 Net Electrical Energy Generated (MWII):
289,734.0 2,012,720.0 106,112,006.0 CIIALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date i Tag No.
I Event Description I
There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.
E2-1 l
9' UNIT SHUTDOWNS DOCKET NO.:
50-364 UNIT NAME:
_ L M. Farley - Unit 2 DATE:
May 4,1999 COMPLETED BY:
W. L. Marlar REPORTING PERIOD: APRII&l999 TELEPIlONE:
(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.
Date s: Scheduled, (Hours)
(1)
(2)
Comments l
There were no unit shutdowns during the month, w amo.s.
w mu nuu.
A - Equipment Failure (Explain) 1 - Manual D - Maintenance or Test 2 - Manual Trip / scram l
C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E Operator Training / License Examination 5 -Other (Explain)
F-Administrative G - operational Error (Explain) 11 - other (Explain)
CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT Unit 2 operated at 50% power to conserve fuel for summer, as directed by Alabama Control Center, for the entire period.
E2-2