L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With

From kanterella
(Redirected from L-99-020)
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With
ML20206P457
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/30/1999
From: Marlar W, Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NEL-99-0200, NEL-99-200, NUDOCS 9905180235
Download: ML20206P457 (6)


Text

_

r

/

Dave Morey Southern Nuclear Vice President Operating C:.mpany farley Project P.O. Box 1295 Birmingham. Afabama 35201 Tel 205.992.5131 May 12, 1999 SOUTHERN COMPANY Docket Nos.:

50-348 50 364 y,,,,,,, S,,,, g,, y,yg.

NEL-99-0200 U. S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Monthly Operating Report Ladies and Gentlemen:

Enclosed are the April 1999 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units I and 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, f

kh Dave Morey RWC:mor Enclosares:

1. April Monthly Operating Repor6 for Plant Farley Unit 1
2. April Monthly Operating Report for Plant Farley Unit 2 l

I f9 9905180235 990430 PDR ADOCK 05000348 R

PDR

. t,.

J' Page 2 U. S. Nuclear Regulatory Commission ec:

Southern Nuclear Operating Company Mr. L. M. Stinson, General Manager U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. J.1. Zimmerman, Licensing Project Manager - Farley U. S. Nuclear Regulatory Commission, Region 11 Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley i

1

OPERATING DATA REPORT DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit i DATE:

May 4,1999 COMPLETED BY:

W. L. Marlar TELEPIIONE:

(334) 814-4554 OPERATING STATUS 1.

Reporting Period:

APRIL 1999 2.

Design Electrical Rating (Net MWe):

854 3.

Maximum Dependable Capacity (Net MWe):

847 i

This. Month Year..to_Date Cumulative 4.

Number Of Hours Reactor Was Critical:

719.0 2,879.0 151,782.2 5.

Ilours Generator On-line:

719.0 2,879.0 149,638.7 6.

Unit Reserve Shutdown Hours:

0.0 0.0 0.0 7.

Net Electrical Energy Generated (MWH):

605,082.0 2,387,100.0 117,921,417.0 CHALLENGES TO PRESSURIZER PORY OR PRESSURIZER SAFETY VALVES i

Date i Tag No.

I hvent Description There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

El-1

UNIT SHUTDOWNS DOCKET NO.:

50-348 UNIT NAME:

J. M. Farley - Unit 1 DATE:

May 4,1999 l

COMPLETED BY:

W. L. Marlar REPORTING PERIOD: APRIL 1999 TELEPIIONE:

(334) 814-4554 j

i Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date S: Scheduled i (Hours)

(1)

(2)

Comments There were no unit shutdowns during the month.

j (1) KLASUN u) M Lauv u.

A Liquipment railure(Explain) 1 - Manual 11 MaintenanceorTest 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuauon E - Operator Training / License Examination 5 - Other(Explain)

F Administrative 0 - Operational Error (Explain) 11 - Other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT There were no significant power reductions this period.

t j

El-2

s.

OPERATING DATA REPORT DOCKET NO.:

. _ ___5 0-3 64._ __

UNIT NAME:

,_ J. M. Farley - Unit 2 DATE:

May_4,1999___

COMPLETED IlY:

TELEPilONE:

W. L. Marlar__ _

_ 0 34) 814-4554 __

l PERATING STATUS Reporting Period:

APRIL 1999_ _

Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe): __

855 852_

This31onth Year to Date Cumulative Number OfIlours Reactor Was Critical:

llours Generator On-line:

719.0 2,879.0 135,347.4_

719.0 2,879.0 133,524.4 Unit Reserve Shutdown Hours:

0.0 0.0 0.0 Net Electrical Energy Generated (MWII):

289,734.0 2,012,720.0 106,112,006.0 CIIALLENGES TO PRESSURIZER PORV OR PRESSURIZER SAFETY VALVES Date i Tag No.

I Event Description I

There were no challenges to Pressurizer PORV or Pressurizer Safety Valves.

E2-1 l

9' UNIT SHUTDOWNS DOCKET NO.:

50-364 UNIT NAME:

_ L M. Farley - Unit 2 DATE:

May 4,1999 COMPLETED BY:

W. L. Marlar REPORTING PERIOD: APRII&l999 TELEPIlONE:

(334) 814-4554 Type Method of F: Forced Duration Reason Shutting Down Cause/ Corrective Actions No.

Date s: Scheduled, (Hours)

(1)

(2)

Comments l

There were no unit shutdowns during the month, w amo.s.

w mu nuu.

A - Equipment Failure (Explain) 1 - Manual D - Maintenance or Test 2 - Manual Trip / scram l

C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E Operator Training / License Examination 5 -Other (Explain)

F-Administrative G - operational Error (Explain) 11 - other (Explain)

CAUSE/ CORRECTIVE ACTION / COMMENTS NARRATIVE REPORT Unit 2 operated at 50% power to conserve fuel for summer, as directed by Alabama Control Center, for the entire period.

E2-2