L-24-001, Independent Spent Fuel Storage Installation - Biennial Submittal of Changes to Diablo Canyon Independent Spent Fuel Storage Installation Technical Specification Bases
| ML24046A054 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 02/14/2024 |
| From: | Morris J Pacific Gas & Electric Co |
| To: | Office of Nuclear Material Safety and Safeguards, Document Control Desk |
| References | |
| DIL-24-001 | |
| Download: ML24046A054 (1) | |
Text
James R. Morris Manager, Regulatory Services Diablo Canyon Power Plant Mail code 104/5/535 P.O. Box 56 Avila Beach, CA 93424 805.545.4609 James.Morris@pge.com A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek PG&E Letter DIL-24-001 ATTN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Materials License No. SNM-2511, Docket No. 72-26 Diablo Canyon Independent Spent Fuel Storage Installation Biennial Submittal of Changes to Diablo Canyon Independent Spent Fuel Storage Installation Technical Specification Bases
References:
- 1. PG&E Letter DIL-18-004, Biennial Submittal of Changes to Independent Spent Fuel Storage Installation Technical Specification Bases, dated March 1, 2018
- 2. PG&E Letter DIL-20-001, Biennial Submittal of Changes to Diablo Canyon Independent Spent Fuel Storage Installation Technical Specification Bases, dated February 25, 2020
- 3. PG&E Letter DIL-22-004, Biennial Submittal of Changes to Diablo Canyon Independent Spent Fuel Storage Installation Technical Specification Bases, dated February 16, 2022
Dear Commissioners and Staff:
Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) Technical Specification (TS) 5.1.1, Technical Specifications (TS) Bases Control Program, provides a means for processing changes to the ISFSI TS Bases. ISFSI TS 5.1.1.d states that changes to the ISFSI TS Bases implemented without prior NRC approval shall be provided to the NRC on a frequency consistent with 10 CFR 72.48(d)(2), which specifies that the submittals be made at intervals not to exceed 24 months.
The purpose of this letter is to inform you that Pacific Gas and Electric Company (PG&E) has not made any changes to the Diablo Canyon ISFSI TS Bases (other than removal of revision bars) since the submittal in March 2018 (Reference 1).
m Pacific Gas and Electric Company*
Document Control Desk Page 2 PG&E Letter DIL-24-001 The same information was also communicated in February 2020 and February 2022 (References 2 and 3).
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-
- 04) in this letter.
If you have any questions regarding this submittal, please contact me at (805) 545-4609.
Sincerely, I
__ 1 _ 12_ /fL---
l es Morris Manager, Regulatory Services rntt/50962769-04 cc:
Kristina L. Banovac, NRC Project Manager Mahdi 0. Hayes, NRC Senior Resident Inspector Samson S. Lee, NRC Senior Project Manager John D. Monninger, NRC Region IV Administrator Diablo Canyon Distribution A
member of the STARS Allia nce Callaway
- Diablo Canyon
- Pal o Verde
- Wolf Creek Date