L-02-004, 2001 Form NRC 5 Annual Report
| ML020590131 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/25/2002 |
| From: | Dennis Morey Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NEL-02-0043 | |
| Download: ML020590131 (3) | |
Text
Dave Morey Southern Nuclear Vice President Operating Company, Inc.
Farley Project Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5131 4%
SOUTHERN w February 25, 2002 COMPANY Energy to Serve Your World Docket Nos.: 50-348 NEL-02-0043 50-364 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant 2001 Form NRC 5 Annual Report Ladies and Gentlemen:
In accordance with 10 CFR 20.2206(b), the attached report of the results of individual monitoring carried out at the Joseph M. Farley Nuclear Plant for 2001 is herewith submitted.
The report includes a record for each individual for whom monitoring was either required by 10 CFR 20.1502 or for individuals for whom monitoring was provided but not required. The enclosed electronic media contains all the information required by Form NRC 5. A printout of the contents of the electronic media is provided for your convenience.
Furthermore, the following information is provided pursuant to the instructions contained in Appendix A of Regulatory Guide 8.7:
"* File name: "nrc5 2001sorted.rep"
"* Date created: January 18, 2002
"* Operating System and version used to format the disk: Windows NT, Version 4.0
"* Contact Person: Joseph Bouillon, (334) 814-4526
"* Other instructions:
If an individual experienced multiple exposure periods at this site during 2001, the doses from the exposure periods have been summed and the monitoring start date provided is the monitoring start date of the individual's first exposure period and the monitoring end date provided is the monitoring end date of the individual's last exposure period.
Page 2 U. S. Nuclear Regulatory Commission If you have any questions, please advise.
Respectfully submitted, Dave Morey RHM:kw: nrc 5 annual report.doc
Attachment:
- 1. NRC Form 5 Report - 3.5" diskette
- 2. NRC Form 5 Report - Printout
Page 3 U. S. Nuclear Regulatory Commission cc:
Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager - w/o U. S. Nuclear Regulatory Commission, Washington, D. C.
Mr. Frank Rinaldi, Licensing Project Manager - Farley REIRS Project Manager - Mail Stop T-9 C24 - - with Attachment 1 & 2 U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator - w/o Mr. T. P. Johnson, Senior Resident Inspector - Farley - w/o