GNRO-2006/00045, Fitness for Duty (FFD) Six-Month Report, January-June 2006

From kanterella
(Redirected from GNRO-2006/00045)
Jump to navigation Jump to search
Fitness for Duty (FFD) Six-Month Report, January-June 2006
ML062340174
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 08/09/2006
From: Bottemiller C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2006/00045
Download: ML062340174 (5)


Text

Entergy Operations, Inc.

Waterloo Road S' Entergy P.O. Box 756 Port Gibson, MS 39150 Tel 601 437 6299 Charles A. Bottemiller Manager Plant Ucensing GNRO-2006/00045 August 9, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Fitness for Duty (FFD) Six-Month Report Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

Dear Sir or Madam:

Attached is the Grand Gulf Nuclear Station (GGNS) Fitness for Duty Program performance six-month report. This report is being submitted in accordance with 10CFR26.71 for the reporting period January 2006 through June 2006. The information contained in the attachment is based on statistical data compiled by means of the GGNS Fitness for Duty Program.

There are no commitments contained in this submittal.

Should you require additional information, please contact Ms. Donna M. Williams at (601) 437-2481.

Sincerely, alpý CAB/AMT:amt

Attachment:

GGNS Fitness for Duty Six-Month Report cc: (See Next Page)

G060045 A072-1

GNRO-2006/00045 Page 2 cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ATTN: Dr. Bruce S. Mallett (w/2)

Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 U.S. Nuclear Regulatory Commission ATTN: Mr. Bhalchandra Vaidya, NRR/DORL (w/2)

ATTN: ADDRESSEE ONLY ATTN: U.S. Postal Delivery Address Only Mail Stop OWFN/O-7DIA Washington, D.C. 20555-0001 Mr. D. E. Levanway (Wise Carter)

Mr. L. J. Smith (Wise Carter)

Mr. N. S. Reynolds Mr. J. N. Compton G060045

Fitness for Duty Program Six Month Performance Report January - June 2006 PROGRAM

SUMMARY

The Grand Gulf Nuclear Station annual random testing rate is 50 percent. During this reporting period, approximately 28 percent of the population has been randomly tested. The rate of positive tests from random testing is 0.28 percent.

POSITIVE RESULTS:

One Pre-Access and one Random urine sample confirmed positive during this reporting period for cocaine and cannabinoid. In addition one Pre-Access tested positive for alcohol based on breath testing.

MANAGEMENT ACTIONS:

Unescorted Access was not granted to the individuals that tested positive during Pre-Access testing and Unescorted Access was denied for the individual that tested positive during random testing. In the case where an individual tested positive, unescorted access was revoked, management was notified and the individual's file was annotated to reflect the positive result.

Three for-cause tests were conducted during this reporting period. These three tests were based on observed behavior. None of the for-cause tests resulted in positive test results.

Four individuals were in the Follow-up testing process during this reporting period.

EVENTS REPORTED TO THE NRC:

During this reporting period, there were no violations of the fitness for duty program that were reportable.

PROGRAM EVALUATION:

No programmatic problems were identified during this reporting period.

CL-021 Page 1 Rev. 1

FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 June 30, 2006 Entergy Operations, Inc.

q *

  • June 30, 2006 Company 6 Months Ending Grand Gulf Nuclear Station P 0 Box 756, Port Gibson, MS 39150 Location Russell Sears, Supervisor, Investigations/FFD (601) 437-2751 Contact Name Phone (Include Area Code)

Cutoffs: Screen / Confirmation 51 Appendix A to 1 OCFR26 Marijuana 100 and 50 / 15 Amphetamines 1000 I 500 N/A /

Cocaine 300 / 150 Phencyclidine 25 /25 N/A /

Opiates 300 / 300 Alcohol (%BAC) 0.04% N/A /

Licensee Long-Term Short-Term Testing Results Employees Contractor Contractor Personnel Personnel Average Number with Unescorted Access 806 N /A 429 Categories # # #

Tested Positive Tested Positive Tested Positive Pre-Access 61 0 N/A N/A 98 2 For-Cause (Post accident) 0 0 N /A N /A 0 0 For-Cause (Behavior) 2 0 N/A N/A 1 0 Random 237 0 N/A N/A 118 1 Follow-Up 2 0 N/A N/A 2 0 Other 0 0 N/A N/A 0 0 Total 302 0 N/A N/A 219 3 CL-021 Page 2 Rev. 1

BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES JANUARY TO JUNE 2006 Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol Refusal 1 2 3 4 5 to Test Licensee Employees 0 0 0 0 0 0 0 N/A N/A N/A N/A N/A Long-Term Contractor N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contractor 1/0 1 0 0 0 1 0 N/A N/A N/A N/A N/A Total 1/0 1 0 0 0 *1 0 N/ N/AN N/A IN/A 13

  • Alcohol Confirmed onsite CL-021 Page 3 Rev. 1