05000254/LER-1997-012, :on 970410,noted That Units 1 & 2 Refuel Bridge Monorail Hoists to Perform Core Alterations W/O Refuel Bridge Position Interlock Actuation Is Physically Possible. Caused by Personnel Error.Placed Monorail Hoist Out of Svc

From kanterella
(Redirected from 05000254/LER-1997-012)
Redirect page
Jump to navigation Jump to search