Scram

From kanterella
Jump to navigation Jump to search

A scram is a rapid plant shutdown through the insertion of all control rods

  • A automatic scram is the type of scram which is triggered by automatically detecting various plant conditions (or even invalid signal).
  • A manual scram means that the control rod insertion was trigger by a plant operators.

Scram lists

[Table View]
Loading map...
  • 2020: 0
  • 2019: 0
  • 2018: 36
  • 2017: 39
  • 2016: 44
  • 2015: 55

by company - 24 months

by site - 24 months

Site#Man#AutoCompanyEvent lists
Belleville 0 0 Électricité de France [Belleville events] [RSS]
FitzPatrick 0 0 Exelon [FitzPatrick events] [RSS]
LaSalle 1 0 Exelon [LaSalle events] [RSS]
McGuire 0 0 Duke Energy [McGuire events] [RSS]
Seabrook 0 0 NextEra Energy [Seabrook events] [RSS]


by Reactor type - 10 Years

type (#)# (ratio)listfeed
B&W-L-LP (1) 11 (11) [B&W-L-LP events] [RSS]
B&W-R-LP (0) 6 (Expression error: Unexpected < operator.) [B&W-R-LP events] [RSS]
CANDU (4) 0 (0) [CANDU events] [RSS]
CANDU-6 (1) 0 (0) [CANDU-6 events] [RSS]
CE (1) 53 (53) [CE events] [RSS]
GE-2 (0) 20 (Expression error: Unexpected < operator.) [GE-2 events] [RSS]
GE-3 (0) 25 (Expression error: Unexpected < operator.) [GE-3 events] [RSS]
GE-4 (1) 68 (68) [GE-4 events] [RSS]
GE-5 (1) 15 (15) [GE-5 events] [RSS]
GE-6 (0) 40 (Expression error: Unexpected < operator.) [GE-6 events] [RSS]
W-AP1000 (0) 0 (Expression error: Unexpected < operator.) [W-AP1000 events] [RSS]
Westinghouse PWR 2-Loop (0) 19 (Expression error: Unexpected < operator.) [Westinghouse PWR 2-Loop events] [RSS]
Westinghouse PWR 3-Loop (0) 56 (Expression error: Unexpected < operator.) [Westinghouse PWR 3-Loop events] [RSS]
Westinghouse PWR 4-Loop (3) 134 (44.7) [Westinghouse PWR 4-Loop events] [RSS]