(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
The Reactor Coolant System (RCS) is about the water in the reactor and its boundary.
System |
---|
|
|
| Site | Start date | Title | Description |
---|
IR 05000317/2023004 | Calvert Cliffs | 1 February 2024 | Integrated Inspection Report 05000317/2023004 and 05000318/2023004 | | IR 05000352/2023004 | Limerick | 31 January 2024 | Integrated Inspection Report 05000352/2023004 and 05000353/2023004 | | NUREG-2194 Volume 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | | 31 January 2024 | NUREG-2194, Vol. 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | | ML24012A159 | Hatch | 30 January 2024 | Summary of January 8, 2024, Meeting Held with Southern Nuclear Operating Company, Inc., to Discuss a RAI License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Head Bolts | | IR 05000397/2023004 | Columbia | 29 January 2024 | Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 | | ML23319A245 | Watts Bar Sequoyah | 29 January 2024 | Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues | | ML24026A011 | Ginna | 26 January 2024 | R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump | | ML24025C687 | 05000611 05000612 | 24 January 2024 | Kairos Power LLC, Changes to PSAR Chapter 3 and 9 | | ML24023A604 | Nuclear Energy Institute | 22 January 2024 | Comment (011) from Jennifer Uhle on Behalf of the Nuclear Energy Institute on PR-50, 51, and 71 - Increased Enrichment of Conventional and Accident Tolerant Fuel Designs for Light-Water Reactors | | IR 05000483/2023004 | Callaway | 19 January 2024 | Integrated Inspection Report 05000483/2023004 | |
|