Reactor Building Closed Loop Cooling
From kanterella
Revision as of 00:38, 25 March 2017 by
StriderTol
(
talk
|
contribs
)
(Created page with "{{System-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
System
Automatic Depressurization System
Auxiliary Building Gas Treatment System
Auxiliary Feedwater
Circulating Water System
Containment Spray
Control Rod
Control Room Emergency Filtration System
Control Room Emergency Ventilation
Control Room Envelope
Core Spray
Core Standby Cooling System
Cresent Area Ventilation and Cooling
Critical Function Monitoring System
Decay Heat Removal
Drywell Continuous Atmospheric Monitor
Emergency Cooling Tower
Emergency Core Cooling System
Emergency Diesel Generator
Emergency Equipment Cooling Water
Emergency Feedwater Initiation and Control
Emergency Gas Treatment System
Emergency Response Data System
Extraction steam
Feedwater
Fuel Pool Cooling and Cleanup
HVAC
High Pressure Coolant Injection
High Pressure Core Spray
Intermediate Range Monitor
Low Pressure Coolant Injection
Low Pressure Cooling Injection
Main Condenser
Main Steam
Main Steam Isolation Valve
Main Steam Line
Main Steam Safety Valve
Main Transformer
Main Turbine
Mechanical Pressure Regulator
Permanent Magnet Generator
Post Accident Monitoring
Primary Containment Isolation System
Primary containment
Qualified Safety Parameter Display System
Reactor Building Closed Loop Cooling
Reactor Building Ventilation
Reactor Coolant System
Reactor Core Isolation Cooling
Reactor Enclosure Recirculation System
Reactor Pressure Vessel
[ENS]
|
[LER]
|
[Findings]
Site
Start date
Title
Description
IR 05000220/2023004
Nine Mile Point
1 February 2024
Integrated Inspection Report 05000220/2023004 and 05000410/2023004
JAFP-23-0064, Emergency Plan Document Revision
FitzPatrick
15 November 2023
Emergency Plan Document Revision
ML23353A157
Nine Mile Point
31 October 2023
UFSAR Revision 28 (Redacted Version)
ML23283A028
Fermi
9 October 2023
Inservice Testing Program for Pumps and Valves - Part 6: IST Check Valve Condition Monitoring Plans Rev. 3
JAFP-23-0014, Enclosure 1 - FSAR 2023 Redacted Version
FitzPatrick
10 August 2023
Enclosure 1 - FSAR 2023 Redacted Version
IR 05000333/2023011
FitzPatrick
25 July 2023
Post-Approval Site Inspection for License Renewal - Phase 4 Inspection Report 05000333/2023011
IR 05000220/2023001
Nine Mile Point
5 May 2023
Integrated Inspection Report 05000220/2023001 and 05000410/2023001
ML23095A374
FitzPatrick
5 April 2023
Enclosure 2: Technical Specification (TS) Bases Revision 58
IR 05000333/2022004
FitzPatrick
20 March 2023
Integrated Inspection Report 05000333/2022004
IR 05000220/2022004
Nine Mile Point
23 January 2023
Integrated Inspection Report 05000220/2022004 and 05000410/2022004
... further results
Category
:
System
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties