(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
The Main Transformer goes from main generator to grid
System |
---|
|
|
| Site | Start date | Title | Description |
---|
IR 05000397/2023004 | Columbia | 29 January 2024 | Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 | | ML23321A047 | Perry | 20 December 2023 | Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application | | ML23334A182 | Pilgrim | 30 November 2023 | Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 | | 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report | Arkansas Nuclear | 16 November 2023 | Submittal of Amendment 31 to Safety Analysis Report | | ML23310A051 | Callaway | 6 November 2023 | EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document | | ML23353A157 | Nine Mile Point | 31 October 2023 | UFSAR Revision 28 (Redacted Version) | | IR 05000277/2023003 | Peach Bottom | 30 October 2023 | Integrated Inspection Report 05000277/2023003 and 05000278/2023003 and Exercise of Enforcement Discretion | | IR 05000397/2023003 | Columbia | 25 October 2023 | Integrated Inspection Report 05000397/2023003 | | ML23291A378 | Susquehanna | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 1, Section 1.8, Symbols and Terms Used in Engineering and Text | | ML23292A216 | Susquehanna | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Questions and Responses 040.1 Through 40.99 | |
|